Original source · versioned page text
ECM_21708446_v4_Delegated Report - Code - Planning MCU21 0150
Qualified Person
1. Qualified Person, for the purpose of:
a. A Bushfire Management Plan for certifying compliance with the bushfire requirements
of this Decision Notice, a qualified person is considered to be an ecologist with a
minimum of 3 years current experience in the field of bushfire assessment and
management.
b. Undertaking, supervising tree works and preparing arboriculture certification, is
considered to be a person with a minimum three years current experience in tree
protection, hazard identification/mitigation and Specifying Trees – a guide to
assessment of tree quality (NATSPEC) assessment and either:
i. International Society of Arboriculture (ISA) certification; or
ii. A Diploma of Arboriculture.
c. Managing Fauna protection is considered to be a certified Fauna Spotter Catcher.
Retention of Existing Trees
2. The existing trees on adjoining properties must be retained and protected during construction
wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
construction of the development which is the subject of this development approval.
Standard Drawing
3. Councils standard drawing for a rural crossover RS-056 (and associated addendums) can
be found on Councils website or by following this link:
https://www.noosa.qld.gov.au/planning-development/development-tools-
guidelines/standard-drawings
Infrastructure Charges
4. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property record
system:
MCU21/0150 – Bushfire Management
1. To ensure the safety of people and property, this properly must be maintained, all buildings
and structures must be sited and/or constructed in accordance with the bushfire
management conditions of Council Approval MCU21/0150 and any associated Operational
Works approvals.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work.
Page 14 of 15
Document Set ID: 21708446
Version: 4, Version Date: 16/12/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.