Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2017-08-08 P&E - Attachment 1 to Item 6 - Noosa Koala Conservation Plan

of 36

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                          Reference   Action                       Success Indicator         Responsibility     Time frame      Resources            Status
                          5.3         Conduct audit of current     Audit and                 Environment        February 2017   Officer time         Not started
                                      koala infrastructure         feasibility report on     Services
                                      including land bridges,      development and                                              Tablet for mobile    Apply through IT
                                      culverts, pipes, culverts,   maintenance of koala                                         data collection      budget
                                      road signs, climbing         friendly infrastructure                                      $4000
                                      ladders, directional and     is completed
                                      exclusion fencing.                                                                        Current GIS
                                                                                                                                bridge asset layer

                          5.4         Deliver koala hard           Koala infrastructure      Civil operations   2017-2022       Officer time         Ongoing
                                      infrastructure during        is delivered and the
                                      road renewals near           incidence of koala car                                       Include in capital
                                      mapped koala habitat         strike is reduced or                                         works/operational
                                      areas                        negated                                                      works budget

                          5.5         Consult with Qld             Meet with State           Environment        August 2016     Officer time         Not started
                                      Department of                Government                Services
                                      Transport and Main           officers to gauge
                                      Roads and USC on             effectiveness of koala
                                      koala infrastructure         infrastructure
                                      requirements for State
                                      Roads

                          5.6         Monitor the effectiveness    Monitoring is             Environment        Ongoing         Officer time         Started
                                      of new technology trials     undertaken and            Services
                                      such as road reflectors      assessed for
                                      to discourage koalas         suitability to reduce
                                      and other wildlife from      car strike
                                      crossing roads, koala
                                      alert signs at crossing
                                      points and improved
                                      lighting
                                                                                                                                                                        Noosa Shire Koala Conservation Plan 2016




Noosa Council | Page 29
Log in to download the original file

2017-08-08 P&E - Attachment 1 to Item 6 - Noosa Koala Conservation Plan(PDF, 2MB).pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.