2021-02-09 P&E Agenda - Item 6 - Attachment 1 - Draft Noosa Bushland Reserve Strategic Plan 2021-2026

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
the best most resilient areas first. The exception to this is where outlier transformer weeds are
present in a reserve and require control to prevent further spread.

Best Practice Guidelines and triage (looking after the best areas first) approaches to developing
strategic works programs have guided the following Management Framework, Reserve
Prioritisation and Management Program Category approaches.


7.1    Formal Management Framework
A clear and transparent framework for planning is necessary to guide on ground works that
achieve Council’s objectives within the limited funding resources that exist.

A clear and transparent adaptive planning process also allows Council to track the progress of
works against targets and change actions if necessary. Typical adaptive planning processes follow
a Plan – Do – Review process, but most importantly, they need to include sound monitoring and
evaluation components.

The table below outlines the management framework that will be adopted for the Natural Areas
program.




The Strategic level components of the Management Framework are:

   1) The Noosa Bushland Reserves Strategic Plan (this document).

   2) Reserve Prioritisation
      A detailed analysis of the 178 reserves has been undertaken to identify where resources
      should be allocated. The process is informed by GIS analysis and Expert Panel review and
      data is housed in a formatted excel spreadsheet. Five tiers of reserve prioritization scoring
      within the prioritisation process are identified.

   3) Reserve Management Program Category Allocation
      The Reserve Management Program categories outline the management intent, planning
      response and on-ground effort allocated and planned for each reserve. They include the

Noosa Bushland Reserves Strategic Plan 2021 – 2026                                            Page 26
Log in to download the original file

2021-02-09 P&E Agenda - Item 6 - Attachment 1 - Draft Noosa Bushland Reserve Strategic Plan 2021-2026(PDF, 6MB).pdf · 6.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.