SEDIMENT BASIN DESIGN CALCS
SIZED IN ACCORDANCE WITH IECA'S 'BEST PRACTICE EROSION AND SEDIMENT CONTROL'
GUIDELINES.
Basin Type = D
Based on IECA recommendations
Appendix B
75% to 85% depending on soil
Y% = 75.000 % type TABLE B28
A= 0.610 ha Catchment
Volumetric runoff coefficient
Cv = 0.600 Table B31
I(1yr 5-day) = 1.270 mm/hr TABLE B29
Y% 5-day rainfall depth (mm)
R(y% 5-day) = 26.300 mm/hr TABLEB29
Vs = 10.R(y%
5-day).Cv.A 96.195 m3 Settling Volume
V = Vs*0.5 48.097 m3 Storage Volume
Total Basin
Volume 144.292 m3 Total Volume
REQUIRED TOTAL STORAGE VOLUME = 144m³
PROVIDED TOTAL STORAGE VOLUME = 163m³
BASIN DESIGN TO PROVIDE TEMPORARY 1.8m HIGH
SUIT MINIMUM FENCING AROUND EXTENT OF
REQUIREMENT SEDIMENT BASIN
700mm MIN DEPTH
REQUIRED SETTLING STORAGE 48m³ MIN TOP OFF WALL
PROVIDED SETTLING STORAGE 65m³ RL6.85
DESIGN SURFACE RL6.55 WATER LEVEL RL6.55
BASIN TOTAL
DEPTH 1.300 m PROPOSED RETAINING WALL 'RW2'
REFER DETAIL EW04
1
SETTLING ZONE
2.5 max RL 5.25
DEPTH 0.700 m
BIDIM A14 GEOFABRIC
STORAGE DEPTH 0.600 m PINNED TO BATTERS
600mm MIN DEPTH
BASIN BATTER REQUIRED SEDIMENT STORAGE 96m³ MIN
SLOPE (1IN PROVIDED SEDIMENT STORAGE 98m³
2.500 m
SEDIMENT BASIN 1 TYPICAL SECTION
SETTLING VOL 98.000 m3
STORAGE VOL 65.000 m3
TOTAL STORAGE 163.000 m3
STANDARD DRAWINGS
BEST PRACTICE EROSION AND SEDIMENT CONTROL BOOK 6 - STANDARD
DRAWINGS IS TO BE REFERRED TO DURING CONSTRUCTION.
WATER QUALITY OBJECTIVES
DISSOLVED OXYGEN (%) 80-100%
pH 6.5 TO 8.0
SUSPENDED SOLIDS (mg/L) <50
TURBIDITY (NTU) <50
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL SEDIMENT BASIN DETAILS
PRELIMINARY Date: MAY 2024
A.B.N. 91 611 354 511
26 Memorial Avenue, Cotton Tree PROPOSED KINETIC BUS DEPOT DEVELOPMENT
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
at 5 PRODUCTION STREET, NOOSAVILLE
Tel (07) 5475 4125 Fax (07) 5479 1607 DRAWING No:
A6880/24/ESC03 3 of 3
Email: [email protected]
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for INTEGRAL CONSTRUCTION
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : A6880-24-ESC03 - SEDIMENT BASIN DETAILS.dwg - DATE : 3/6/24 - 3:42pm - XREF's: Council Ref: .......................
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.