Original source · versioned page text
Meyer Judgment Sealed
Very large file (22.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
1
4 October 2024
Ref: AG/AG/213029-LA
102255ltr
Noosa Council
PO Box 141
Tewantin QLD 4565
Re: Stormwater Management Plan – Revision C
At: 39-41 Picture Point Cres Noosa Heads QLD 4567
For: Mrs Heidi Meyer
Council Ref: RAL22/0021
STORMWATER MANAGEMENT PLAN
Introduction
With reference to the abovementioned project, Covey Associates has been engaged to
undertake a Stormwater Management Plan for the proposed residential subdivision (1 lot into
2 lots) in response to an information request and further advice request from Noosa Council
dated 17 October 2022 and 21 April 2023, respectively. In particular this Stormwater
Management Plan (SMP) addresses items 7 and 8 of the information request and all items in
the further advise request regarding on-site disposal of stormwater and the potential impact on
slope stability.
Previous Land-use, Topography and Drainage (Pre-development case)
The site is located at 39-41 Picture Point Cres, Noosa Heads. The real property description is
Lot 2 on RP 220514 and has an area of 1447m2. The site currently exists as a residential
property consisting of a house, driveway, pool and garden areas. In its existing state the site
is approximately 39% impervious (Figure 1).
22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.