Original source · versioned page text
Meyer Judgment Sealed
Very large file (22.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
6
Conclusion
This Stormwater Management Plan (SMP) has shown compliance with the stormwater
drainage requirements outlined in the Noosa Plan (2020). This site based SMP has
demonstrated that efficient management of stormwater runoff for the proposed development
is possible by adopting the stormwater strategies set out in this report.
Trusting the above is to your satisfaction. Should further information be required please contact
this office.
Yours faithfully
COVEY ASSOCIATES PTY LTD
AGaffney
ALLISTER GAFFNEY
Civil Engineer
BEng(Civil), MEng, RPEQ 24345
References
Noosa Council (2020), Noosa Plan 2020.
Sunshine Coast Council (2018), On-site Underground Detention Storage Orifice Plate Sizing
for Deemed-to-comply Detention: Fact Sheet, Sunshine Coast Council.
27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.