Original source · versioned page text
Meyer Judgment Sealed
Very large file (22.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 64, section 1. The text section number identifies this passage in the reader.
tecténic PROPOSED RESIDENTIAL DEVELOPMENT geotechnical & environmental a 39 PICTURE POINT CRESCENT, NOOSA HEADS In an adverse case, where ongoing near surface instability occurs on the dune face below the proposed buildings, and retrogresses; it is possible that the piles may become exposed above the ground surface temporarily. Thus, some form of lateral capacity must be allowed for in the pile design to address this. A grout ‘curtain’ must be installed along the along the front (northern) edge of the buildings (at the slope crest) to a depth of no less than 6 m. The plane extending at 28° from the toe has also been used to inform the need for protection to the side boundaries. It is possible that sand would be removed from neighbouring properties with instability on the dune slope, which has the potential to affect the subject site where the building envelopes do not extend as far north/downslope. The grout curtain should also extend from the northern edge of the building envelopes, and south along each respective site boundary for about 10 m, tapering from 6 m deep at the northern end. It would be prudent to consider the following for the final design and construction of the development regarding the dune slope below the site. = One of the primary triggers for large-scale instability of sand dunes is when the toe of the dune is undermined. This may be caused by excavations or natural erosion. The toe of the dune must be protected from any such disturbance. = — In order to minimise future erosion (and initial surficial slipping) it is recommended that the faces of all dune and batter slopes are protected using with topsoil/mulching of the surface and revegetation, in combination with a cellular confinement system, such as GeoWeb (or similar), in critical areas such as stormwater outlet zones. Any erosion or instability will need to be appropriately remediated as soon as possible after it is identified. If ongoing instability occurs, the slope may need to be retained to prevent further movement. 6.2 Earthworks 6.2.1 Site Preparation and Trafficability Following clearing of existing vegetation, any tree stumps, large roots and remnant foundation elements from the existing structure should be ‘grubbed out’. Any organic rich topsoil should then be stripped and set aside. Based on the boreholes, topsoil stripping depths are expected to be minimal with pockets of uncontrolled fill being around 0.7 m depth locally; deeper areas of unsuitable materials may be present on site. Topsoil materials must not be used in structural fill; however, may be placed across landscaping areas. Unsuitable saturated or loose materials encountered should also be removed during subgrade preparation. It should be noted that compaction of such relatively ‘clean’ sands as structural fill requires the addition of substantial volumes of water (‘flooding’) combined with the use of vibratory compaction equipment (typically a vibrating plate). Care must be taken with the use of vibratory equipment (e.g. compactors or sheet piling) to ensure that there are no adverse impacts on surrounding structures. The impacts from ground vibration must be closely monitored and managed during construction, to be detailed in a construction management plan. It would be prudent to conduct a dilapidation survey of neighbouring structures prior to commencement of construction. The exposed natural subgrade following excavations will likely be in a loose condition and must be compacted by several passes of a vibrating plate or minimum 4 tonne vibrating smooth drum roller, in conjunction with surface application of ample water, to achieve the required compaction. Due to the potential for development of poor trafficability during construction, placement of a minimum 150 mm thick granular working platform may be required across laydown areas. Specific platform design would be required prior to mobilisation and trafficking of any heavy mobile plant on the site (e.g. mobile cranes, concrete pumps or piling rigs). Due to the highly permeable nature of the sands at this site, stormwater is expected to rapidly infiltrate the ground, making un-sealed surface drainage ineffective for the control of flows. Any sealed areas should be graded to ensure free drainage of stormwater away from construction areas, and to a control point(s). 10 February 2023 Report No. 22511-001-Rev0 12 63
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.