Original source · versioned page text
2015-04-28 Planning and Organisation Committee Agenda
The original of this document is very large (22.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 28 APRIL 2015
Attachment 2
Page 105 of 211
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 28 APRIL 2015
Attachment 2
NOOSA PLANNING SCHEME POLICY 1. OS
1 =
WASTE MANAGEMENT PLANS Oo
oO.
Introduction g ©
S
N
Council is committed to the principle of waste minimisation and re-use of waste within the Shire. 2 =
Noosa Council requires waste management plans to be submitted for the day to day operation of a 8
a development (operational works), as well as for construction and demolition. op 2
¢ Tt
Council has developed a fee structure at its waste facilities, which rewards contractors who r
segregate building and construction waste by charging low fees for segregated materials. Much c
higher fees apply to unsegregated waste. oO
The purpose of this policy is —
a) to ensure that as development proposals are planned and the proper consideration is given
to the aims of waste minimisation and waste re-use;
b) to encourage the segregation of waste so that the material can be recycled or reused
within Council's waste management process;
c) to provide guidance to developers, consultants and Council in the preparation and
assessment of Waste Management Plans;
d) to facilitate the efficient assessment of development applications: and
e) to support the application of the Waste Management Code within The Noosa Plan
1. What is a Waste Management Plan?
A waste management plan is a document that details the type and quantity of waste material
that is likely to be generated from a particular development site. The document also details
where and how the waste should be stored, how the waste will be disposed and procedures
for handling the waste.
2. When does the policy apply?
2.1 Development that has the potential to generate significant quantities of waste or waste that is
of a hazardous nature should have an approved waste management plan.
2.2 The following developments should have a waste management plan submitted with any
development application for Material Change of Use (MCU)—
a) Residential use with more than 15 dwelling units or accommodation units;
b) Business use with a fofa/ use area greater than 500m’;
Cc) All environmentally relevant activities (as defined by Schedule 1 of the Environmental
Protection Regulation 1998);
" Further information can be obtained by phoning Council’s Environmental Health Section.
1
PSP11 Waste Management Plans
Page 105 of 211See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.