Skip to the record
Accept no substitutions.

Original source · versioned page text

2015-04-28 Planning and Organisation Committee Agenda

of 211

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (22.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       28 APRIL 2015


SECTION               RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                             LOOKING AHEAD
ICT                      Completion of ICT and Records              Business Continuity Plan                     Development of electronic content
                           Service Reviews                              development.                                   management system retention
                         All TechnologyOne software                 Development of roadmap for further             schedules to meet state archives
                           upgraded to latest versions fixing           TechnologyOne implementation.                  requirements.
                           several known issues.                      Eliminating paper forms by                   Major upgrades to TechnologyOne
                                                                        implementing TechnologyOne                     ECM, Financials, and HR / Payroll
                                                                        functionality for staff leave                  software.
                                                                        submissions.                                 Development of Branch Plan.
                                                                      Adoption of new records keeping
                                                                        policy (in draft) and records keeping
                                                                        improvements including staff training.
                                                                      Cloud based storage of staff working
                                                                        files (Office 365) to eliminate
                                                                        documents on PCs and reduce risk
                                                                        (currently being trialled).




Procurement & Fleet      New beach cleaner operational.             Quotations are being sought for fleet /      LG Vendor Panel strategy to be
                         Bus shelter tenders undertaken and           plant replacement as identified in the         developed.
                           awarded.                                     fleet review.                                Future procurement panel
                         Unitywater accounts reviewed and a         Technology One Fleet Manager                   arrangements strategy under
                           comprehensive database created to            module development and training.               development.
                           scrutinise water charges and identify      Small sites electricity arrangement          Fleet reports to be developed.
                           unused water meters for                      sought in conjunction with Local Buy.        Leased vehicle replacement strategy.
                           disconnection and the reduction of         Electricity Power Factor Correction          Development of Branch Plan.
                           oversized supply outlets.                    arrangement being negotiated.
                         New bitumen truck due for delivery         Assistance with the procurement of
                           late April 2015.                             capital works.
                         Fleet policy & guidelines adopted.




                                                                                     Page 116 of 211
Log in to download the original file

2015-04-28 Planning and Organisation Committee Agenda(PDF, 21MB).pdf · 22.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.