Original source · versioned page text
2015-04-28 Planning and Organisation Committee Agenda
The original of this document is very large (22.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 28 APRIL 2015
Attachment 2
Page 124 of 211
Attachment 2
Noosa Council
Capital Works Schedule
As at: 31-Mar-2015
Forward design for bridge rehab program 0 10,500 10,500 100.00%
Noosa Parade Munna Point Bridge - Investigations and interim 0 185,100 7,353 3.97%
Whole of Shire - annual bridge inspect 20,000 20,000 20,756 103.78%
Noosaville - Munna Point Bridge Stage 2 1,401,000 1,401,000 7,401 0.53%
Girraween Bridge Joint Replacement 0 50,000 8,883 17.77%
Total Bridges 1,421,000 1,666,600 54,893 3.29%
Gympie Terrace and William Street Revetment wall and pathway 0 37,100 18,314 49.36%
Noosa Waters revetment walls - Stage 2a 0 46,910 46,910 100.00%
Noosaville - Gympie Tce / Williams St 40,000 60,000 2,398 4.00%
Sunshine Beach - beach access 35 65,000 35,696 36,649 101.55%
Teewah Beach - southern dunal restore 20,000 14,656 15,010 102.42%
Noosaville - Gympie Tce Foreshore 80,000 80,000 28,893 36.12%
Noosa Main Beach - Sand pumping pipe 50,000 50,000 590 1.18%
Noosa Waters - scour protection stage 2b 1,250,000 1,400,000 1,426,441 101.89%
Munna Point Foreshore Stabilisation 0 105,000 22,157 20.19%
Total Coastal Canals and Waterways 1,505,000 1,829,363 1,597,363 87.32%
Pomona Cemetery - niche wall 7,500 7,500 3,936 52.48%
Tewantin Cemetery - concrete beam 5,500 5,500 3,290 59.82%
Total Cemeteries 13,000 13,000 7,226 55.59%
Peregian Beach Land Acquistion 0 788,771 789,336 100.07%
Rufous St Precinct Redevelopment 0 130,000 134,403 103.23%
Total Commerical Land and & Property 0 918,771 923,739 100.54%
Peregian Surf Club Public Amenities - Planning & Design 0 14,800 0 0.00%
Noosa Leisure Centre — design and detail 10,000 10,000 3,766 37.66%
Kookaburra Park Public Amenities 55,000 55,000 945 1.72%
Mill Place Boiler House - stage 2 100,000 100,000 2,520 2.52%
Noosa Aquatic Centre - pool cleaner 20,000 13,352 13,352 100.00%
Noosa Leisure Centre - concertina door 25,000 0 9,464 0.00%
Noosa Library and NLC Plumbing 40,000 40,000 723 1.81%
Sunshine Beach Skate Park - block wall 22,500 26,499 27,533 103.90%
Whole of Shire - community light poles 155,000 75,000 0 0.00%
Whole of Shire- public toilet / sewerage 35,000 0 0 0.00%
Cooroy Butter Factory - condition assess 5,000 0 0 0.00%
Noosa Leisure Centre -upstairs flooring 60,000 0 0 0.00%
Noosa Regional Gallery - access 45,000 48,460 10,000 20.64%
Noosa Respite Centre - internal refurb 150,000 150,000 10,239 6.83%
Noosa Heads - lifeguard storage survey 75,000 0 0 0.00%
Tait Duke House - relocation 80,000 80,000 9,316 11.32%
Noosa Aquatic Centre 50m Pool Blanket Winch 0 9,457 9,457 100.00%
Cooroy Library Tactile Marker Placement 0 9,339 0 0.00%
Tewantin Spray Park Shade Sail 0 1,210 2,893 239.13%
Bicentennial Community Hall- School Toilet additional 0 24,000 19,500 81.25%
NAC lear to swim pool - pool cover replacement 0 18,000 0 0.00%
Total Community Facilities 877,500 675,116 119,707 17.73%
Tewantin Council Office - roof rehab 30,000 30,000 687 0.00%
Noosaville Depot - replace generator 60,000 60,000 219 0.37%
Total Corporate Buildings 90,000 90,000 906 1.01%
Cudgerie - Cedar Gully Pk water feature 22,000 49,332 49,332 100.00%
Noosa Trail Network 4 - bridge refurbish 40,000 40,000 6,161 15.04%
Noosa Trail Network 4 - Ringtail Creek 7,000 7,000 3,050 43.57%
Weyba Creek - bank erosion restoration 220,000 20,000 6,171 30.86%
Total Environmental Assets, Bushland, Tracks and Trails 289,000 116,332 64,714 55.63%
Page 124 of 211See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.