AGENDA
Planning & Environment
Committee Meeting
Tuesday, 10 December 2024
commencing at 9:30 AM
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Amelia Lorentson (Chair), Brian Stockwell, Frank Wilkie, Tom Wegener
“Noosa Shire – different by nature”
Page 1 of 68
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalThe download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.
Full text of the other 67 pages
Page 2
PLANNING & ENVIRONMENT COMMITTEE MEETING 10 DECEMBER 2024
1. DECLARATION OF OPENING
2. ACKNOWLEDGEMENT OF COUNTRY
3. ATTENDANCE & APOLOGIES
4. CONFIRMATION OF MINUTES
5. PRESENTATIONS
6. DEPUTATIONS
7. REPORTS FOR CONSIDERATION OF THE COMMITTEE
MCU24/0084 MATERIAL CHANGE OF USE - FUNCTION FACILITY – 658 LOUIS
7.1.
BAZZO DRIVE, RINGTAIL CREEK
PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY - OCTOBER
7.2.
2024
8. REPORTS FOR NOTING BY THE COMMITTEE
9. CLOSED SESSION
10. MEETING CLOSURE
Page 2 of 68
Page 3
PLANNING & ENVIRONMENT COMMITTEE MEETING 10 DECEMBER 2024
7.1 MCU24/0084 MATERIAL CHANGE OF USE - FUNCTION FACILITY – 658 LOUIS BAZZO
DRIVE, RINGTAIL CREEK
Author Development Planner, Matthew Pinese, Development Planner
Development & Regulation Department
Index ECM/Application/MCU24/0084
Attachments 1. ATTACHMENT 1 - (MCU24 0084) - PROPOSED CONDITIONS
2. ATTACHMENT 2 - (MCU24 0084) - PLANNING OFFICER'S REPORT
3. ATTACHMENT 3 - (MCU24/0084) - PROPOSAL PLANS
4. ATTACHMENT 4 - (MCU24/0084) - OPERATIONAL MANAGEMENT
PLAN
5. ATTACHMENT 5 - (MCU24/0084) - EMERGENCY MANAGEMENT PLAN
APPLICATION DETAILS
Applicant Louis Bazzo PL TTE
Proposal Material Change of Use - Function facility
Properly Made Date 28 June 2024
Information Request Date 25 July 2024
Information Response Date 2 August 2024
Decision Due Date 20 December 2024
Number of Submissions 61 Submissions
Properly Made: 60
Not Properly Made: 1
30 object and 31 support
PROPERTY DETAILS
Property Address 658 Louis Bazzo Drive, Ringtail Creek Qld 4565
RP Description Lot 4 on RP160124
Land Area 99.94ha
Existing Use of Land Machinery/Processing Shed, Macadamia Farm and additional
storage structure
Page 3 of 68
Page 4
PLANNING & ENVIRONMENT COMMITTEE MEETING 10 DECEMBER 2024
STATUTORY DETAILS
SEQRP Designation Regional Landscape and Rural Production Area
Zone Rural
Precinct Not applicable
Local Plan Area Not applicable
Overlays Agricultural Land Overlay
• Agricultural Land Conservation Area
Biodiversity, Waterways and Wetlands Overlay
• Area Subject to Biodiversity Overlay
• MSES Environmental Values
• Area Subject to Riparian Buffer Overlay
• Waterways
• MSES Regulated Vegetation
• Riparian Buffer Area
Bushfire Hazard Overlay
• Medium Potential Bushfire Intensity
• Potential Impact Buffer
Flood Hazard Overlay
• Flooding and Inundation Extent
Landslide Hazard Overlay
• Moderate Hazard Area
Assessment Type Impact
EXECUTIVE SUMMARY
This application is for a material change of use of premises for a function facility for the purpose of
holding small scale functions, weddings and events. The use is proposed to operate between
11.00am to 10:30pm and cater for a total of a maximum of 150 guests.
The site is zoned Rural under the planning scheme and is currently operating as a macadamia farm.
A function facility is a consistent use under the Rural zone.
The existing macadamia farm will continue to operate in conjunction with the proposed use.
The proposal involves establishing a permanent marquee (300m2), with a canapes terrace (221m2)
and cocktails terrace (287m2) with associated car parking and manoeuvring areas adjacent to an
existing waterbody. A total of 50 car parks are to be provided in addition to 2 coach/bus parking
spaces.
The applicant advises that the proposed function facility is intended to be undertaken in accordance
with an approved Operational management plan. The key operational features of the proposed
function facility are as follows:
• Max. events a year – 96
Page 4 of 68
Page 5
PLANNING & ENVIRONMENT COMMITTEE MEETING 10 DECEMBER 2024
• Max. guests 150 (average guests 80-100 persons)
• 70-80% of guests to be chauffeured to an event i.e. 2 bus trips.
• Hours of operation 11am to 10.30pm Monday to Sunday.
All buses and vehicles to leave the site by 11.00pm The following table (Table 1) - provides an
overview of schedule of events for the calendar year.
The primary issues associated with the development are land use, noise, traffic and the protection
of the site’s environmental values.
The proposed use as a function facility is a consistent land use in the Rural Zone under the Noosa
Plan 2020.
An Environmental Noise Level Impact Assessment was submitted and peer reviewed in support of
the proposed development. The recommendations from the report have been conditioned to ensure
the proposed use operates in accordance with the relevant noise criteria.
Traffic impacts have been addressed through an RPEQ certified Traffic Engineering Report and the
State Assessment and Assessment and Referral Agency has conditioned upgrades to Louis Bazzo
Drive, which is a State controlled road. The access has been conditioned by Council’s Engineers to
be sealed.
It is recommended that the site’s environmental values are protected through environmental
covenants. Environmental impacts have also been addressed in the submitted Ecological Report
and Stormwater Management Plan.
The application material, and associated reviews, have demonstrated that the use can occur on-site
with potential amenity impacts being mitigated through implementation of the recommendations of
the associated management plans and/or conditions.
It is recommended that the application be approved.
RECOMMENDATION
That Council note the report by the Development Planner, to the Planning & Environment Committee
Meeting dated 10 December 2024 regarding Application No. MCU24/0084 for a Development Permit
for Material Change of Use - Function facility situated at 658 Louis Bazzo Drive Ringtail Creek Qld
4565 and:
A. Approve the application in accordance with the proposed conditions outlined in Attachment
1.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 5 of 68
Page 6
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
ATTACHMENT 1 – MCU24/0084 – PROPOSED CONDITIONS
PLANNING
When Conditions Must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
2. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed within this Decision Notice. The Approved Plans must be amended
to incorporate the amendments listed within this development approval and approved by
council prior to the issue of any development permit for operational works*.
*(Refer to Advisory Note)
Plan No. Rev. Plan/Document Name Date
5785-DA01 5 Location Plan and Summary prepared by 29/07/2024
Blackburne Jackson
5785-DA02 6 Site Master Plan prepared by Blackburne 30/07/2024
Jackson
5785-DA03 6 Site Plan – Wedding Venue prepared by 30/07/2024
Blackburne Jackson
5785-DA04 6 Floor Plan – Wedding Venue prepared by 30/07/2024
Blackburne Jackson
5785-DA05 5 Elevations prepared by Blackburne Jackson 29/07/2024
5785-D06 5 Section prepared by Blackburne Jackson 29/07/2024
5785-DA17 4 Gross Floor Area prepared by Blackburne 30/07/2024
Jackson
Nature and Extent of Approved Use – Function Facility
3. The development approval is for a Function Facility in the location shown on the Approved
Plans.
4. The Function Facility is to consist of the following elements:
a. Marquee (300m2)
b. Canapes Terrace (221m2)
c. Cocktails Terrace (287m2)
d. Jetty (41m2)
5. The function facility on the premises is restricted to a maximum of 150 guests on the site at
any one time.
6. The maximum number of functions per calendar year, as shown in the table below, are
permitted to occur at the premises.
Page 6 of 68
Page 7
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Type of Event No. of Guests Maximum No. events per year
Weddings/Functions Up to 150 72
Weddings/Functions-Micro/Elopement Up to 20 12
Long Lunches Up to 100 3
Wellness/Nature Retreat Up to 20 4
Corporate Retreat Up to 50 5
7. The approved use must be conducted entirely within the location identified on the Approved
Plans and vehicle parking, loading and unloading of vehicles must occur within the
driveway and parking areas and associated manoeuvring areas in accordance with the
Approved Plans.
8. Functions are limited to the hours of 11.00am to 10:00pm inclusive of provision of amplified
music/sound.
9. All guests must have vacated the premises by no later than 10:30pm.
10. Functions must not occur on a gazetted Queensland public holiday, or on a Sunday unless
followed by a gazetted Queensland public holiday.
Acoustic Amenity
11. The operation of the function facility must be in accordance with the approved noise report
”Environmental Noise Level Impact Assessment for Proposed Wedding and Events Facility,
658 Louis Bazzo drive, Ringtail Creek” David Moore and Associates ,Report No:
R24041/D3877/Rev.2/31.08.24 dated 31 August 2024, and as amended by these
conditions.
12. Amplified music or entertainment must be controlled at all times to comply with the noise
limits of the approved Environmental Noise Level Impact Assessment.
13. Use of the generator must be controlled at all times to comply with the noise limits of the
approved Environmental Noise Level Impact Assessment.
14. Amplified music associated with the approved use must not operate outside the hours of
11am to 10pm during the use of the function facility.
15. Noise from site operation inclusive of patrons and/or amplified music must not exceed 39
dB(A) LAeq,adj,15min. external to any offsite residence (noise sensitive receiver).
16. Prior to commencement of use construct a 1.8 metre high by 30 metre long acoustic barrier
in the location shown on Figure 9 of the approved noise report. This acoustic barrier must
be at least 1.8 metres high relative to existing ground levels, be continuous and gap free
and have a minimum surface area density of 12.5 kg/m2. This minimum surface area
density can be achieved by the following examples of materials of construction:
• earth mound;
• concrete;
• brick or blockwork;
• sheet metal a minimum 2.0mm thick;
• fibrous cement sheeting a minimum 7.5mm thick;
Page 7 of 68
Page 8
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
• overlapping timber paling fence, for example, 23 mm thick palings 100 mm wide
overlapped a minimum 20 mm each side;
• any combination of the above.
17. Prior to commencement of use submit to Council for approval a Noise Management Plan
which documents the noise control measures and restrictions to inform the operators/staff
of noise compliance requirements.
18. Where complaints (other than frivolous or vexatious complaints) are made to Council about
noise from the approved use, Council may require the site management entity to:
a. submit a Noise Impact Assessment prepared by a suitably qualified, and/or
b. undertake further noise amelioration measures or operations, install volume limiting
devices or barriers and/or shield or relocate mechanical plant and equipment and
have such measures certified by a suitably qualified person.
19. Prior to commencement of the use, certification must be submitted to Council from a
suitably qualified person that the development has been constructed is in accordance with
report “Environmental Noise Level Impact Assessment for Proposed Wedding and Events
Facility, 658 Louis Bazzo drive, Ringtail Creek” David Moore and Associates ,Report No:
R24041/D3877/Rev.2/31.08.24 dated 31 August 2024 and the Acoustic Amenity conditions
of this development approval including construction of the 1.8 metre high by 30 metre long
acoustic barrier.
Lighting Amenity
20. Lighting associated with the use must be designed, sited, installed and tested to comply
with AS 4282 – “Control of the obtrusive effects of outdoor lighting”.
21. Certification must be submitted to Council from a suitably qualified person that all lighting
devices comply with the requirements of this development approval.
Operational Management Plan
22. An amended Operational Management Plan must be submitted to Council for approval
prior to the issue of any Operational Works approval. The Operational Management Plan
must be amended to reflect the requirements of the conditions of this approval and must
also include, but not be limited to
a. maximum number of guests permitted on site;
b. operating hours and curfews;
c. use and management of outdoor areas to not cause a noise nuisance;
d. delivery and collection arrangements, food and catering equipment, musical
equipment, portable ablution facilities and any other equipment brought onto the site;
e. expectations of patron and staff behaviour including use of toilet facilities at all times;
f. any penalty associated with transgressions; and
g. a statement acknowledging the site’s location within a rural area and that:
i. the approved use of the subject land for a Function facility is not intended to
compromise the use of adjoining land for existing or future lawful rural activities;
and
Page 8 of 68
Page 9
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
ii. on the day of the function, guests may experience reverse amenity impacts
associated the use of adjoining land for existing or future lawful rural activities
(for example rural noise associated with cropping).
23. The approved Operational Management Plan must be provided to all clients prior to them
making a function reservation.
24. Where complaints (other than frivolous or vexatious complaints) are made to council about
noise from the approved use, council may require the Operational Management Plan to be
updated.
25. A complaints management procedure for the site must be prepared and submitted to
Council prior to the commencement of use. The complaints management procedure must
include the following:
a. a contact person with whom complaints can be lodged
b. a clearly defined procedure for responding to, investigating and resolving complaints,
and
c. a notification protocol to all complainants of the outcome of complaint investigations.
A record of all complaints and investigation results including corrective actions must be
maintained and made available for inspection at any time upon request by Council.
26. The operator/on-site manager must be on the premises at all times while a function is
occurring, including the day and night of the event.
27. Except in the case of a lawful rural or emergency purpose, or unless approved otherwise
by Council’s delegate, helicopters or other aircraft must not land or take off from the
property at any time.
28. Fireworks and lasers are not permitted at any time.
29. Service vehicle movements associated with non-residential uses on the premises (including
loading and unloading) must not occur outside the hours of 7am to 6pm Monday to Saturday
and not at all on Sundays or public holidays. The requirements of this condition must be
included in the Community Management Statement for any body corporate for the subject
site.
30. All forms of accommodation including camping is not permitted on the premises.
Building Appearance
31. All mechanical equipment and other service infrastructure located on the site must be fully
enclosed or screened such that they are not visible from the street frontage/s, other public
space, or adjoining properties.
Building Height
32. The maximum height of the development must not exceed 5m above natural ground level.
Street Identification
33. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and property/venue name.
Page 9 of 68
Page 10
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
ENGINEERING
Property Access and Driveways
34. A sealed access (i.e., concrete, bitumen) must be provided between the property boundary
fronting Louis Bazzo Drive to all parking and manoeuvring areas of the development. The
works must be undertaken in accordance with an Operational Works approval and be
generally in accordance with Blackburne Jackson’s Site Master Plan (DA02, Rev. 06) dated
30 July 2024.
35. Approval from the Department of Transport and Main Roads for the final design of all works
within the road reserve (i.e., driveway crossover, road treatments, etc.) must be submitted in
writing to Council prior to the issue of any Development Permit for Operational Works.
On-site Parking
36. A minimum of 50 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval, be generally in
accordance with Blackburne Jackson’s Site Plan – Wedding Venue (DA03, Rev. 06) dated
30 July 2024 and must include in particular:
a. 4 staff parking spaces within the total, which are clearly marked for that purpose;
b. pedestrian routes in accordance with the conditions of this Decision Notice;
c. 2 coach parking spaces, which are clearly marked for that purpose;
d. 1 disabled parking space/s within the total; and
e. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
37. A minimum of four motorcycle/scooter parking spaces must be provided and marked on the
site and made available and accessible at all times while the use is open for business. The
works must be undertaken in accordance with an operational works approval and must
include in particular dimensions, crossfalls and gradients in accordance with AS 2890 -
Parking facilities.
38. All on-site parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Service Vehicles
39. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. regular access for a front-loading Waste Collection Vehicle; and
b. regular access for a 14.5m bus.
Pedestrian and Bicycle Facilities
40. Pedestrian and bicycle facilities must be provided for the development, as noted below. The
works must be undertaken in accordance with an operational works approval and must
include in particular:
a. pedestrian pathways between the proposed car parking area and the building/s; and
b. adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels.
c. a minimum of 7 visitor bicycle parking spaces, in accordance with AS 2890.3 – Bicycle
parking.
Page 10 of 68
Page 11
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Stormwater Drainage
41. The site must be provided with a stormwater drainage system connecting to a lawful point
of discharge. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with Morgan Consulting’s Site Based Stormwater
Management Plan (SBSMP, Rev. 2) dated 26 June 2024, and must include in particular:
a. An assessment (and upgrade, if deemed necessary) of the interface between the
existing dam drainage outlet and the proposed fire egress road.
Easements
42. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
27. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
28. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
29. All works must be carried out in accordance with a Geotechnical Report (or part thereof)
prepared by a qualified person* and endorsed through an Operational Works approval.
*(Refer to Advisory Note)
Earthworks and Retaining Walls
30. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be undertaken in accordance with an Operational
Works approval, be generally in accordance with Morgan Consulting’s Concept Bulk
Earthworks Plan (C01, Rev. A) dated 12 June 2024 and contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
31. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
ECOLOGICAL
Land Rehabilitation
32. A vegetation protection covenant must be registered against the title of the property over the
area identified as Vegetation Community 1 and 4 on the approved plan Titled Ecological
Values Plan, EV01, Rev 1, dated 25/06/24 found in the Ecological Assessment Report v1
pursuant to Section 97A of the Land Title Act 1994. The covenant document and a survey
plan must be submitted to Council for endorsement prior to lodgement with the relevant titles
authority for registration of title. The covenant document must:
a. incorporate the requirements of this Decision Notice
b. include Noosa Council as Covenantee
c. reference Queensland Land Title Registry Standard Terms Document No. 715597513.
Page 11 of 68
Page 12
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
33. If a provision included in the covenant document is requisitioned or refused registration by
the relevant titles authority, a substitute provision must be included in the document which
as nearly as practicable addresses the objective sought by the requisitioned or refused
provision. The wording of the substitute provision must be agreed by Council.
Bushfire Management
34. The development must be carried out in accordance with the Bushfire Hazard Assessment
and Management Plan v2, reference J001313, prepared by North Coast Environmental
Services, dated 26 June 2024, as listed within this Decision Notice.
35. Water supply for firefighting purposes must be provided in accordance with section 5.3 of the
Bushfire Hazard assessment and management Plan v2 listed within this Decision Notice.
36. Emergency passing bays must be provided to the primary and emergency access routes
every 80 metres in accordance with section 5.5 of the Bushfire Hazard assessment and
management Plan v2 listed within this Decision Notice.
37. The development must be carried out in accordance with the Bushfire Emergency Response
Plan v2 listed within this Decision Notice listed within this Decision Notice.
38. The primary and alternative evacuation routes must be upgraded in accordance with
Sections 8.1 and 8.2 of the Bushfire Emergency Response Plan (v2). The upgrade to the
evacuation routes must be prepared by a suitably qualified person (RPEQ), be undertaken
in accordance with a Operational Works approval and cater for the types of vehicles expected
to access the site (i.e., 2WD, MRV, passenger bus, etc.).
39. A copy of the Bushfire Emergency Response Plan listed within this Decision Notice must be
provided to the nearest fire authority.
40. Prior to the commencement of use certification must be submitted to Council from a qualified
person* which certifies that the development has been constructed in accordance with the
bushfire management conditions of this Decision Notice.
*(Refer to Advisory Note)
ENVIRONMENTAL HEALTH
Waste Management
41. The collection of waste is to be through a contractual agreement with Council’s preferred
contractor.
42. Refuse storage, removal and collection facilities must be provided in accordance with the
following:
a. provision of a minimum of two (2) 1100L industrial bins for general waste, and two (2)
1100L industrial bins for recyclable waste for the development;
b. collection by service vehicles from the designated area within the carpark only in a
safe, efficient and unobstructed manner;
c. provision of a hardstand impervious area for the permanent storage location of all
industrial bins;
d. site management entity to present all industrial bins at designated area on refuse
collection day;
e. provision of a 1.8m high purpose-built enclosure to the bin storage area, which is screened
from the street and adjoining properties by landscaping; and provision of a readily accessible
wash-down area in the vicinity of the permanent bin storage area fitted with a hosecock, bin
roll over bund, and drain connected to the onsite effluent disposal system that has a
stormwater catchment area of no more than 1m2.
Page 12 of 68
Page 13
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Potable Water
43. The development must be provided with a safe and adequate potable water supply system
with a capacity of at least 46,000 litres.
Effluent Disposal and Ablution Facilities
44. The development site must be provided with permanent ablution facilities consisting of a
toilet and washing facilities that are made available to guests at all times while a function is
occurring.
PROPERTY NOTES:
MCU24/0084 – Vegetation Protection Covenant
1. A Vegetation Protection Covenant applies to this property. No clearing of vegetation is to
occur within the covenanted area, except where in accordance with the terms of the
covenant.
MCU24/0084 – Bushfire Management
2. To ensure the safety of people and property on this property is maintained, all buildings and
structures must be sited and/or constructed in accordance with the bushfire management
conditions of Council Approval MCU24/0084 and associated Operational Work approvals.
Page 13 of 68
Page 14
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
ATTACHMENT 2 – MCU24/0084 – PLANNING OFFICER’S REPORT
REPORT
1. PROPOSAL
The proposed use will accommodate weddings and small functions such as corporate and wellness
events. The relevant planning scheme definition is a Function facility which is defined as follows:
Function facility means the use of premises for—
a) receptions or functions; or
b) preparing and providing food and liquor for consumption on the premises as part of a reception
or function.
The scheme also includes examples such as a conference centre or reception centre.
The proposal is to establish a function facility on the site for the purpose of hosting weddings and
other functions including small corporate events, such as long lunches that are part of a reception
or function, and wellness retreats.
The proposal includes a permanent 300m2 marquee with associated outdoor terrace areas,
referred to as Canapes Terrace (221m2) and Cocktail Terrace (287m2) and a pontoon jetty, which
is proposed within the existing dam as shown on the Proposal Plans. These areas are proposed
to be established on the western side of the existing constructed waterbody (dam).
The development includes “back of house” areas which are located close to the functions area and
includes a large storage container, waste storage area, staff carparking, and a designated parking
area for portable toilets on trailers with auxiliary holding tanks, which avoids the need for an on-
site effluent disposal system. The portable toilets will be retained on site, with their larger holding
tanks pumped out by a local service provider, as required.
Access to the function facility will initially be via the Internal Road (5.5m wide), which then turns
into the Internal maintenance Road (3.5m wide with passing lanes provided at 30m spacings), as
shown on the Site Master Plan (see Figure 2 below). There is also a Fire Egress Road (3.5m wide)
and Service Road (3m wide). It is also noted that the Internal Road continues south and provides
access to the existing machinery shed.
The function facility includes 50 guest parking spaces and 2 bus parking bays. A traffic report has
been submitted with the application to assess the traffic demand and impacts of the proposal. The
proposed driveways, car parking and manoeuvring areas will all be finished with compacted gravel.
Minor earthworks will be required to create a flat area for the marquee and associated outdoor
deck / terrace areas. Any areas disturbed will be rehabilitated and landscaped.
The proposed development will be conducted in accordance with the function facility’s Operational
Management Plan, prepared by the Louis Bazzo Pty Ltd dated June 2024 and the Emergency
Management Plan prepared by Louis Bazzo Pty Ltd dated June 2024.
Page 14 of 68
Page 15
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Figure 1 – Locality
Page 15 of 68
Page 16
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Figure 2 – Site Plan
Figure 3 – Floor Plan
Page 16 of 68
Page 17
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Figure 4 – Elevations
2. SITE DETAILS
2.1. Background
The site has historically been utilised for rural purposes including a macadamia farm. The site
includes some farm sheds used for nut packaging and the storage of farm machinery.
There are no records of any existing approval on Council’s online application tracking.
2.2. Site Description
The site is located 658 Louis Bazzo Drive, Ringtail Creek on Lot 4 on RP160124. The site area is
99.94ha.
The site is characterised by an undulating (rolling) topography. The site includes several drainage
lines that predominantly drain from the northeast and northwest corners of the site. These drainage
lines converge into an existing wetland area and drain south into the Six Mile Creek. A constructed
waterbody (or dam) is located directly to northeast of a centralised wetland area.
The site has primarily been cleared and farmed as macadamia orchard. The site also contains
areas of native vegetation which follow the site’s waterways.
The site is in a rural area with limited urban services. Reticulated water and sewer services are not
available to the site.
2.3. Surrounding Land Uses
Land surrounding the site has been developed as follows:
North – Rural and rural residential / Extractive industry (Clay extraction site)
South – Ringtail State Forest and rural
East – Ringtail State Forest, Amaroo outdoor education centre (Accommodation buildings,
educational establishment and outdoor entertainment)
West – Rural and rural residential
The nearest dwelling, which is located at 35 Hessen Place, Ringtail Creek, is located approximately
725m from the proposed location of the Function Facility. The existing driveway is located
approximately 40m from the dwelling at 642 Louis Bazzo Drive.
Page 17 of 68
Page 18
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
• State Planning Policy;
• South East Queensland Regional Plan;
• Planning Regulation 2017;
• Noosa Plan 2020.
3.2. State and Other Statutory Instruments
State Planning Policy
Noosa Plan 2020 is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
State interests in the state planning policy not integrated or partly integrated
State Planning Policy (July 2017)
• Natural Hazards, risk and resilience – coast hazards – in part
Since the site does is not mapped as containing any coastal hazards, no further assessment is
required.
South East Queensland (SEQ) Regional Plan
The site is located within the Regional Landscape and Rural Production Area of the SEQ Regional
Plan. The proposal is consistent with the regional policies of the SEQ Regional Plan.
A review of the Planning Regulation 2017 now defines a function facility as Indoor recreation as
outlined above. This is recent amendment to the regulation following the State’s recent review and
amendment of the Regional Plan. As result of this change to the indoor recreation definition, the
function facility now needs to meet the threshold under schedule 10, Part 16, division 4, Subdivision
1, Section 27A.
Assessable development—material change of use for indoor recreation
A material change of use of premises for indoor recreation is assessable development if—
(a) all or part of the premises are in—
(i) the SEQ regional landscape and rural production area; or
(ii) the SEQ rural living area; and
(b) the use—
(i) results in a gross floor area of more than 3,000m2 on the premises, excluding any part of the
premises that is used for tourist accommodation or accommodation for employees; or
(ii) involves more than 250 persons, including employees, being on the premises at any time; or
(iii) provides accommodation for more than 100 persons; and
(c) the material change of use is not—
(i) excluded development; or
(ii) an exempt material change of use.
The proposed use does not exceed these thresholds and therefore the application does not require
referral to SARA in respect of matters relating to development in the Regional Landscape and
Rural Production Area.
Page 18 of 68
Page 19
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Planning Regulation 2017
The following assessment benchmarks from the Planning Regulation 2017 apply to the application:
• Koala Habitat Area
The site has areas mapped as Core Koala Habitat Area; however, the development is located
outside of these mapped areas. Furthermore, the site is not within the Koala Priority Area.
The proposal is for an urban activity within the Regional Landscape and Rural Production Area
and is consistent with the assessment benchmarks contained in the Planning Regulation 2017 for
the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The subject site is in the Rural Zone. The proposed use is identified as a consistent use within the
zone and is required to follow an Impact Assessment application process.
Accordingly, the application must be assessed against the whole of Noosa Plan 2020 to the extent
the provisions are relevant to the development.
3.3.1 Strategic Framework
The strategic framework provides Council’s policy intent underlying the planning scheme. Relevant
provisions of the strategic framework are addressed below.
The strategic framework notes that Noosa Shire:
• has exceptionally high biodiversity and is a stronghold for a wide range of regional
ecosystems that includes threatened species.
• serves as a domestic and international tourism destination with strong emphasis on nature-
based recreation opportunities. Tourism and retail are significant contributors to the local and
regional economy.
Council’s Senior Environment Officer has reviewed the proposed development and states that ‘the
site supports local and state biodiversity values. No assessable vegetation clearing is proposed,
hence no impact to native vegetation is expected to occur. Impacts to the mapped Riparian Buffer
Area & Wetland have been avoided and minimised by developing an existing cleared area and
providing an 8-16m setback between the proposed infrastructure (excluding jetty) and dam water
line. Appropriate sediment and erosion control fencing will also be utilised during
construction/earthworks.
The function facility will contribute to the local economy through job creation and the use of local
businesses.
Locality Provisions
The subject site is in the Ringtail Creek Locality and is zoned Rural. The proposed use is identified
as a consistent use with the zone and is required to follow an impact assessable application
process.
The application must be assessed against each of the following codes to the extent they are
relevant to the development:
• Rural Zone Code;
• Entertainment Activities Code
• Biodiversity, Waterways and Wetlands Overlay Code;
• Bushfire Hazard Overlay Code;
• Extractive Resources Overlay Code;
• Flood Hazard Overlay Code;
• Landslide Hazard Overlay Code; and
• Works Codes.
Page 19 of 68
Page 20
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues arising out of the assessment are discussed below:
Criteria Planning Scheme Proposal Complies
Building height
• storeys 2 storeys max 1 storey
• metres 8 4.6metres
Gross floor area 500m² max 350m²
Boundary setbacks
• Frontage 40 metres min 1300 metres
• Side 10 metres min 620 metres
• Side 10 metres min 390 metres
• Rear 10 metres min 430 metres
Carparking 47 spaces min 50 spaces
Rural Zone Code
The proposed function facility occupies a small proportion (less than 1%) of the site. The proposal
is compatible and will co-exist with the existing farm activities occurring on the site. The existing
macadamia farm will continue to operate and form a key feature of the rural landscape setting for
the proposed development.
The function facility has been designed to respect the site’s attributes. It avoids constrained parts
of the site, including Council’s mapped overlays associated with existing vegetation and
waterways. The built form elements are small scale and nestle into the rural landscape, thereby
ensuring a seamless integration with the site’s rural and landscape character.
The proposed development meets all the relevant Acceptable Outcomes of the Rural Zone Code.
Flood Hazard Overlay Code
The proposed development is not located within an area identified in the Flooding and Inundation
Extent. The proposed internal roads also avoid the mapped Flooding Inundation Extent.
Minor earthworks will be required to create a flat area for the marquee and terrace areas. Any
areas disturbed will be rehabilitated and landscaped.
The development is consistent with and can comply with the relevant Acceptable Outcomes,
Performance Outcomes and the Overall Outcomes sought by this Code.
Entertainment Activities Code
In this code there are provisions for the hours of operation for Entertainment Activities.
The code has a provision for where the site is not adjoining land in a residential zone and not
otherwise specified above, the entertainment activity is to operate only between 7:00am – 10:00pm
Sunday to Thursday and 7:00am – 12:00 midnight Friday and Saturday.
It is recommended that functions be conditioned to be limited to the hours of 11.00am to 10:00pm,
inclusive of provision of amplified music/sound. A condition is also recommended that requires all
guests to vacate the premises by 10:30pm. The entertainment activity will therefore operate in
accordance with this provision, with the alternative solution being to allow guests the additional 30
minutes to leave the property.
Page 20 of 68
Page 21
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
These hours of operation have been assessed as part of the Environmental Noise Level Impact
Assessment, which was peer reviewed. The implementation of the recommendations from this
assessment ensures that the use complies with the relevant noise limits and to ensure that the use
operates within a timeframe that avoids negative impacts on the surrounding area and sensitive
land uses.
Assessment of Key Planning Issues
Through the assessment of this application the following issues have been identified and resolved:
Land use
The proposed development of a Function Facility is a consistent use in the Rural Zone, requiring
impact assessment.
It is noted that under the superseded Noosa Plan 2006, a Function Facility was defined as an
Entertainment and dining business, which was an inconsistent use. This highlights a key difference
with the current Noosa Plan 2020, which anticipates these uses in the Rural Zone, provided they
are appropriately managed.
The Noosa Plan 2020, including the Strategic Framework and Rural Zone anticipate other uses
where they are compatible with existing and future rural uses and the character and environmental
features of the land.
The proposal will coexist with the existing Macadamia Farm and the environmental features of the
land will be maintained by the development being sited in an area that does not require clearing
and the surrounding vegetation will be protected by a conditioned environmental covenant.
Council’s Manager, Economic Development has reviewed and supports this application. Their
review states that the boutique wedding industry (and particularly, midweek weddings) through the
consultation of the Draft Destination Management Plan, has been identified as a potential growth
sector for tourism in the future, due to the fact that is a high value industry that brings small group
business to the region for several days, as opposed to the hordes of day trippers who currently
come to the region, spend very little in the economy but add to traffic congestion and pressure on
amenity etc.
Elements that Economic Development are keen to encourage in this and other similar proposals,
based on current trends are:
- A unique venue offering stunning ceremony and/or reception locations and settings
- Use of natural themes and designs that align with Noosa’s Design Principles
Sustainable, eco-friendly solutions across all infrastructure, amenities (including waste) and
services offered.
Accordingly, the proposed land use is supported and is a consistent use, which has been designed
and conditioned to meet the relevant aspects of the Strategic Framework and the associated
provisions of the Noosa Plan 2020.
Amenity and Noise
The proposed development involves, weddings and receptions, and has been assessed against
the requirements of the planning scheme in relation to potential impacts on rural amenity and
lifestyle, traffic and pedestrian safety.
An Environmental Noise Level Impact Assessment was submitted in support of the proposed
development, and peer reviewed.
The report identified the potential noise sources from the development being:
▪ vehicles (cars, delivery van and coaches) on the access/driveway;
▪ patron noise from the function marquee, canapes terrace and cocktails terrace;
▪ amplified music from the function marquee;
▪ the generator to power the development.
Page 21 of 68
Page 22
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
The acoustic report demonstrates that the proposed facility will comply with the relevant noise
criteria, subject to its recommendation that an acoustic barrier is provided between the access
driveway and nearby residences. This barrier is to be 30m long, 1.8m high, and constructed
adjacent to the eastern residence at 642 Louis Bazzo Drive.
It is noted that that the nearest dwelling, which is located at 35 Hessen Place, Ringtail Creek, is
located approximately 725m from the proposed location of the Function Facility. The existing
driveway is located approximately 40m from the neighbouring dwelling at 642 Louis Bazzo Drive.
Acoustic measures and treatments, including the recommended acoustic barrier with the
nominated construction Weighted Sound Reduction Index (RW) must be incorporated into the
development in accordance with the Environmental Noise Impact report and maintained onsite.
It is recommended that the development be conditioned, in accordance with the recommendations
of Council’s consulting noise expert, to manage noise to ensure that the amenity of nearby
residents is maintained. These include conditions recommended to limit the nature and extent of
the proposed use, the hours of operation, amplified music, the submission of a Noise Management
Plan and construction of the acoustic barrier as details above.
An Operational Management Plan has also been provided, the plan includes a comprehensive
overview of how the events will be managed particularly regarding operating hours, noise
requirements patron behaviour management and complaint procedures.
To address the issue of dust causing a nuisance, it is recommended that a condition be included
requiring the access/driveway be sealed. The driveway will be signed to be a low-speed
environment that is restricted to 20km/h.
The sealing of the driveway will also reduce the noise caused by vehicles and buses while
traversing the driveway.
Traffic
Access into the subject site is taken from Louis Bazzo Drive, a state-controlled road.
The number of car parking spaces (50) provided in the car parking area is more than the minimum
amount (47) required.
The proposed development is supported by a Traffic Engineering report that is RPEQ certified.
The report confirms that the anticipated number of vehicles will not adversely impact on the
operational performance of the surrounding road network.
The layout of the carpark is generally compliant with the relevant Australian standard. A set of
vehicle turn paths demonstrating the coaches are able to manoeuvre on site has been provided.
The carpark includes a fire egress road that crosses a dam outlet. Further assessment of the
interface between the existing outlet and fire egress road is to be undertaken as part of the
Operational Works phase.
The application was referred to SARA due to Louis Bazzo Drive being a State controlled road.
Accordingly, the Department of Transport and Main Roads has reviewed the application requiring
conditions to be included on any approval regarding road access works. These works include turn
treatments for a Basic Right Turn and Basic Left Turn are to be carried out in accordance with
DTMR requirements. As the responsible authority, SARA has deemed the revised access
arrangement suitable.
Waste servicing is to occur via the proposed carpark. Vehicle turn paths for the waste collection
vehicle have been provided, demonstrating the vehicle can service the bins and manoeuvre the
site to exit in a forward gear.
Environmental Impacts
The proposal has addressed the potential impacts on biodiversity, ecosystem health, ecological
processes, soil, air and water quality through the submission of an Ecological Report and
Stormwater Management Plan.
Page 22 of 68
Page 23
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
The Ecological Report identified the local and State biodiversity values present on the site. The
report concluded that no assessable vegetation clearing is proposed and hence no impact to native
vegetation is expected to occur.
Minor exempt clearing/delimbing is required from a bushfire management perspective to facilitate
the vehicular access recommendations for the emergency alternative access route to achieve a
minimum driveway width. Also, within the road reserve, vegetation removal and benching has been
conditioned by the State to ensure Sight Visibility from a traffic safety perspective.
The proposed development location is set within the existing modified and maintained area of the
site. The existing extent of bushland within the site is proposed to be retained in-situ and will
continue to connect koala habitat trees and ensure safe movement for koalas and other wildlife.
Impacts to the mapped Riparian Buffer Area & Wetland have been avoided and minimised by
developing within an existing cleared area and providing an 8-16m setback between the proposed
infrastructure (excluding jetty) and dam water line.
It is recommended conditions be included requiring a vegetation protection covenant, which is to
be shown on a survey plan and submitted to Council for endorsement. The covenant is to be
applied to the areas identified as Vegetation Community 1 (VC1) and Vegetation Community 4
(VC4) as shown on the extract below of the Development Impact Plan, J001313 EV02 Rev 1,
prepared by North Coast Environmental Services and dated 25 June 2024.
Figure 1 – Extract from Ecological Values Plan from Ecologic Assessment Report
Water quality is addressed through the Stormwater Management Plan, which provides a lawful
point of discharge and confirms that onsite detention and tertiary stormwater treatment is not
warranted for the proposed use. It is also noted that the subject site is affected by flooding;
however, the area proposed for the wedding venue is unaffected by flooding.
The report recommends that appropriate sediment and erosion control fencing be utilised during
construction/earthworks.
Landscaping of the development footprint utilises native flora species found in the local regional
ecosystems.
Page 23 of 68
Page 24
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Bushfire Management
The site contains areas, including the access that are mapped either for High Potential Bushfire
Intensity or Potential Impact Buffer. To address this constraint a Bushfire Hazard Assessment and
Management Plan has been submitted to Council. A Bushfire Emergency Response Plan (BERP)
has also been prepared to assist management to protect life and property in the event of a bushfire
or a pending bushfire on the site.
The bushfire hazard assessment has provided a detailed assessment generally in accordance with
the methodologies detailed in the State interest guidance material and supporting QFES Bushfire
Resilient Communities (October 2019) technical reference guide.
Further, an assessment has been undertaken against the Bushfire Hazard Overlay Code. The
development is consistent with and can comply with the relevant Acceptable Outcomes,
Performance Outcomes and the Overall Outcomes sought by the Bushfire Hazard Overlay Code.
The conditioned upgrades to the driveway provide a suitable means of evacuation. A condition is
proposed that requires a suitably qualified RPEQ, as part of a future operational works, to design
all evacuation routes and waterway crossings to cater for the types of vehicles expected to access
the site (i.e. 2WD, MRV, passenger bus, etc).
A minor amount of vegetation clearing/delimbing may be required to facilitate the vehicular access
recommendations about the waterway crossings for the emergency alternative access route to
achieve a minimum 3.5m width and 4.8m vertical clearance. All vegetation clearing required to
facilitate the vehicular access recommendations can likely be carried out as exempt clearing under
the routine management.
Geotechnical
The marquee is located on land affected by the moderate landslide hazard overlay mapping.
Confirmation of this hazard will be provided as part of a geotechnical investigation report. In the
event the site is affected by a landslide hazard, appropriate design and construction measures will
be adopted in accordance with the recommendations of a geotechnical engineer at the detailed
design phase of the development and prior to approval being given for building works.
Stormwater Management
A Stormwater Management Plan has been submitted with the application to assess the impact of
the quantity and quality of stormwater resulting from the proposed development.
The submitted Stormwater Management Plan states:
The plan demonstrates that the development does not increase the peak flow discharge or worsen
the stormwater quality. Roofwater is to be collected and discharged via pipe and outlet directly into
the dam. The remaining hardstand and other impervious areas are to match predevelopment flow
(i.e., sheet flow).
Council’s Senior Development Engineer has reviewed and agrees with the submitted Stormwater
Management Plan, the plan recommends that appropriate sediment and erosion control fencing
will also be utilised during construction/earthworks.
Proposed landscaping of the development footprint utilises native flora species found in the local
regional ecosystems to stabilise the site.
4. CONSULTATION
4.1. Referral Agencies
The application was referred to the following Referral Agencies:
• Department of State Development, Infrastructure, Local Government and Planning (SARA)
The Department is a referral agency for Development in a State-controlled Road environment, as
identified in Section 1.6 and section 5.1.3 of this report, and in accordance with Schedule 10 of the
Planning Regulation 2017.
Page 24 of 68
Page 25
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
The Department has responded by providing their referral agency response. From a State referral
perspective, SARA have approved the development, subject to conditions. The conditions of their
approval require the existing access to be upgraded in accordance with the Department of
Transport and Main Roads (DTMR) standards. Road works comprising of a Basic Right Turn and
Basic Left Turn are to be carried out in accordance with DTMR requirements. Vegetation removal
and benching must be carried out to ensure sight visibility.
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers:
• Development Engineer
• Environment Officer
• Economic Development Officer
• Waste Management Officer
4.3. External Referrals
The application was forwarded to the following external parties:
• A peer review, requested by Council, of the Environmental Noise Level Impact Assessment
was carried out by MWA Environmental
4.4. Public Notification
The application was publicly notified for fifteen (15) business days in accordance with the Planning
Act 2016. 60 properly made submissions were received. The following table provides a summary
and assessment of the issues raised by submitters.
Matters Raised Comments
Submissions Against
Amenity Impacts The proposed development involves, weddings
and receptions, and has been assessed against
- Neighbourhood amenity will be
the requirements of the planning scheme in
impacted because of the proposed
relation to potential impacts on rural amenity and
use.
lifestyle, traffic and pedestrian safety.
- People bought in this area to enjoy
the peace and quiet. The application was subject to rigorous acoustic
- Increased visitors will result in an assessment, and included the requirement for
increased risk of theft and security further modelling by the applicant’s acoustic
issues. consultant to satisfy Council that the planning
scheme requirements in relation to noise and rural
amenity could be achieved.
The proposal can achieve the intent of the
Strategic framework as well as the Purpose,
Overall outcomes and Performance outcomes of
the applicable code, and the Overall outcomes of
the Rural zone code in relation to appropriate
management of adverse impacts on surrounding
sensitive land uses and maintenance of rural
character and amenity.
The application includes a comprehensive
Operational Management Plan which will
minimise any potential impacts on any adjoining
landowners and the community. The Operational
Management Plan, together with reasonable and
Page 25 of 68
Page 26
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
relevant conditions, will provide adequate
mechanisms to ensure that the use is undertaken
in a responsible manner.
In addition, the noise report which has been peer
reviewed by Council’s external noise expert, has
confirmed that the proposal will not result in
unacceptable noise impacts, subject to the
construction of a noise barrier in the access strip.
The applicant has advised that they operate a
similar function facility in the rural areas of
Rosemount and understand the importance of
maintaining a harmonious relationship with
neighbours to ensure the business operates
smoothly without adversely impacting the
community.
Traffic and road safety This development is supported by a Traffic
Engineering Report that is RPEQ Certified.
- Louis Bazzo Dr has a history of
accidents and fatalities. Louis Bazzo Drive is a state-controlled road. The
- The access location is on a bend driveway location is to be slightly moved to the
making the access unsafe. east to improve sight lines. The Department of
- There is no turning bay which makes Transport and Main Roads has conditioned road
the access unsafe. access works, including turn treatments that are
- Results in increased traffic on Louis considered reasonable for the number of vehicles
Bazzo Rd which is inadequate for the anticipated to occur during an event.
proposed demand generated by the
These conditions require the existing access to be
development.
upgraded in accordance with the Department of
- The proposed service road (access
Transport and Main Roads (DTMR) standards.
driveway) is inadequate for the
Road works comprising of a Basic Right Turn and
proposed amount of traffic.
Basic Left Turn are to be carried out in accordance
- Potential for drink driving and serious
with DTMR requirements. Vegetation removal and
traffic accidents.
benching must be carried out within the road
- Increased buses and service vehicles
reserve to ensure sight visibility.
increase the risk to traffic users.
- Lack of public transport/ taxi or ride The application material has demonstrated that
share services in the area. the site access has sufficient visibility in both
directions for vehicles to enter and exit in a safe
manner.
As the responsible authority, SARA has deemed
the revised access arrangement suitable.
In consideration of the submitted Traffic
Engineering Report and the upgrades to the
access in accordance with the State Assessment
and Referral Agency response, this matter has
been addressed.
In terms of concerns raised about road safety
generally, driver behaviour (including drink
driving) is not the responsibility of the applicant
and is regulated by road safety legislation.
Notwithstanding this, the Operational
Management Plan includes measures that
manage patron behaviour. These include a
Page 26 of 68
Page 27
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
dedicated bus service and responsible service of
alcohol requirements.
It is anticipated in the Traffic Engineering Report
that up to two buses will be utilised for each
function.
The operational Management Plan also estimates
that 70-80% of guests will be driven to and from
the venue via a private bus for larger events such
as weddings.
Noise An Environmental Noise Level Impact
Assessment was submitted in support of the
- The acoustic assessment does not
development application.
fully address all scenarios such as
wind, remote location and real-life Council requested further information to ensure
examples i.e. trucks and buses on a the proposed development complies with the
gravel road and the use of brakes. relevant noise criteria and standards.
- The compacted gravel roads will be
This report was peer reviewed and amended as
used by numerous vehicle types and
part of a response to further advice to include an
will create noise impacts.
acoustic barrier.
- Concern there is no estimate of
vehicle numbers for each event. The report identified the potential noise sources
- How will operating hours and vehicle from the development and how to mitigate them.
departures be policed? The acoustic report demonstrates that the
- The locality’s peace and tranquillity proposed facility will comply with the relevant
will be impacted by the impact of noise criteria, subject to its recommendation that
vehicles and noise from functions. an acoustic barrier is provided between the
- One solution would be to condition access driveway and nearby residences. This
the road to be sealed. barrier has been conditioned.
The acoustic barrier is to be 1.8m high and
constructed adjacent to the eastern residence at
642 Louis Bazzo Drive.
An Operational Management Plan includes a
comprehensive overview of how the events will be
managed particularly regarding operating hours,
noise requirements patron behaviour
management and complaint procedures.
Prior to commencement of the use, certification
must be submitted to Council from a qualified
person* that the development has been
constructed in accordance with the Environmental
Noise Level Impact Assessment, and Amenity
conditions of this development approval.
Certification must also include the in-house public
address (PA) system specifications and serial
numbers. Should the PA system specifications
and equipment change at any time, further
certification must be submitted Council from a
qualified person* of the specifications and serial
numbers of such equipment.
The recommended conditions also include the
sealing of the driveway as this will also reduce the
Page 27 of 68
Page 28
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
noise caused by vehicles and buses while
traversing the driveway.
Speed limits will be restricted to 20km/h, to ensure
engine noise and revving is limited.
Site Suitability The use is recognised as a consistent use in the
Rural zone.
- The site is not considered suitable for
a development of this scale and The site is considered suitable for the proposed
nature. use which has been designed to consider the
- Concern that there are more site’s constraints. It minimises impacts on the
appropriate locations for the use environment and neighbouring properties through
which do not impact on the sensitive location of the development footprint and
environment, community or road operational management measures.
users.
The applicant has identified a need for such a
- This type of venue belongs in the city
facility within a rural setting in the Noosa region,
or closer to the coast.
noting that approved function facilities are typically
located in urban or coastal areas.
As a result, the proposal is to be established on
Rural zoned land, where the applicant can create
unique weddings or other events in a scenic rural
location.
Dust Impacts To address this issue, it has been conditioned that
the access/driveway be sealed.
- The compacted gravel access road
(will result in increased dust which
may affect drinking water supply,
require more tank clean outs and
increased filtration requirements, and
may also impact effectiveness of
solar panels.
- One solution would be to seal the
access road.
Days and hours of operation The development has been conditioned to operate
between 11am-10pm with guests to vacate the
premises by 10:30pm.
Functions must not occur on a gazetted
Queensland public holiday, or on a Sunday unless
followed by a gazetted Queensland public holiday.
Lack of public transport, taxis and 13Cabs provides taxi services to Ringtail Creek.
Ubers Similarly ride sharing apps like Uber also operate
in this area and can be booked in advance.
The availability of public transport to Ringtail
Creek is limited with buses only operating as far
as Tewantin. From Tewantin a taxi or similar
would be required to get to the venue.
Alternatively, the development anticipates charter
buses to be hired for wedding and other functions.
Page 28 of 68
Page 29
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
It is estimated that 70% of the guests will arrive in
charted buses carrying between 20 to 50 per bus.
The balance of the guests will attend by taxi, uber
and car, with 20% of guests anticipated to arrive
in their own vehicle.
Environmental Impact In support of the application, an Ecological
Assessment Report was submitted.
- The area’s habitat, wildlife corridors
and fauna should be protected. It is noted that the subject site is identified as
- Increased traffic on the 1km access containing Koala Habitat Areas (Core). However,
road will increase the risk of fauna Schedule 11 of the Planning Regulation is not
strikes. applicable to the subject application as the site is
- The pristine nature of the not mapped as a Koala Priority Area, accordingly
environment will be dramatically the application was not required to be referred to
affected. SARA in relation to koala habitat.
- Koala habitat trees were cleared
The development design avoids mapped koala
around the driveway entry.
habitat and does not incorporate new roads or
- Concern about impacts on the
fences.
adjoining Yural and Ringtail State
Forest. The proposal involves a very small development
- Lighting associated with the use may footprint which is less than 1% of the site area.
impact on wildlife. Speed limits will be restricted to 20km/h which will
assist to avoid the risk of vehicle strike to koala.
The proposed development location is set within
the existing modified and maintained area of the
site. No vegetation clearing is proposed. The
existing extent of bushland within the site is
proposed to be retained in-situ and will continue to
connect koala habitat trees and ensure safe
movement for koalas and other wildlife.
The following was highlighted by the applicant in
their review of the submissions:
The ecological assessment submitted with the
application concludes that the proposal complies
with the Noosa Plan and includes the following
recommendations to reduce the proposal’s
environmental impacts:
- Appropriate erosion and sediment control
works are undertaken to mitigate any
significant impacts on the mapped wetland,
waterway and riparian buffer area; and
- Landscaping of the development footprint
utilises native flora species found in the local
regional ecosystems.
In addition, the report notes that lighting impacts
on forest areas and the dam will be minimised by
controlling lux levels. Detailed lighting design will
be undertaken during the operational works phase
of the project.
The current design of the proposal together with
the ecological report recommendations will
Page 29 of 68
Page 30
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
generally avoid or mitigate any adverse
environmental impacts from the proposal.
A submission raised concern about previous
clearing of koala habitat trees near the site’s entry.
This area is not mapped as a Core Koala Habitat
area nor Regulated (remnant) vegetation under
State mapping. It is understood that selective
clearing was limited to near the new front fence
line which is setback a further 20m from the road
to improve queuing distances for farm trucks and
other vehicles when entering the property.
The construction of the new front fence line and
front entry statement involved reasonably
necessary property maintenance works which
involved clearing of some juvenile regrowth
largely consisting of slash pine (Pinus elliottii)
which is listed as environmental weed in
Queensland (refer to www.daf.qld.gov.au). The
clearing is “exempt clearing” under Council’s
vegetation policy.
Stormwater Management A condition has been included within the
recommendation for the access to be sealed from
- Runoff from the road runs directly into
the road frontage to the car parking areas. The
a neighbour’s dam. The stormwater
sealed access will mitigate runoff, noting the
management plan only addressed
existing access driveway is a dirt road.
the main area of the site and fails to
address stormwater runoff from the
access handle.
- Recent rainfall events have resulted
in significant sediment runoff from the
new excavated gravel pit, which
currently does not have any
sedimentation controls in place.
Property Values Matters/concerns regarding loss in property
values are not a valid town planning
- The proposed development may
consideration.
have an adverse impact on property
values.
Insufficient policing and public safety The closest police stations to the development site
concerns are Pomona and Cooroy Police Stations.
- Insufficient police and resources The proposal includes a comprehensive
available to protect and provide Operational Management Plan. The Operational
public safety. Management Plan is an appropriate mechanism,
- Neighbours’ safety not guaranteed. together with reasonable approval conditions, to
ensure that all future functions and patron
behaviour are managed in a coordinated and
responsible manner.
The proposal also includes a bushfire
management and emergency evacuation plans for
the safety and well-being of guests and staff in the
event of a natural hazard.
Page 30 of 68
Page 31
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Environmental Degradation The proposed development location is set within
the existing modified and maintained area of the
site. No vegetation clearing is proposed. The
existing extent of bushland within the site is
proposed to be retained in-situ.
Impacts to the mapped Riparian Buffer Area &
Wetland have been avoided and minimised by
developing an existing cleared area and providing
an 8-16m setback between the proposed
infrastructure (excluding jetty) and dam water line.
Appropriate sediment and erosion control fencing
will also be utilised during
construction/earthworks.
Future development and expansion Any future development or expansion to the
development will require a change application and
- Concern that the proposal may be
be assessed and decided on its merits.
expanded to include other uses such
as cafes, accommodation and polo
fields which will only exacerbate the
impact.
Excessive liquor licenses in the area In the Ringtail Creek locality there are currently no
liquor licences.
Light pollution Lighting associated with the development has
been conditioned to be designed, sited, installed
- Concern that light from the proposed
and tested to comply with AS 4282 – “Control of
development would negatively affect
the obtrusive effects of outdoor lighting.
adjoining properties and disturb
wildlife. The lighting has been conditioned to be certified
to ensure compliance with the relevant Australian
Standard.
Risk to safety and the security of The Event Manager/ Coordinator will ensure that
surrounding homes and property the event is executed within the parameters of any
development approvals and in accordance with
the Operational Management Plan. A minimum of
one (1) Event Manager or (1) On-Day Coordinator
(Event Managers) will be assigned to each event
and will be required to be onsite for the duration of
the event.
The Operational Management Plan includes
procedures for the logging and actioning of
complaints should they arise to ensure that the
venue provides an environment that ensures that
high levels of safety and amenity are preserved.
Number of events and patrons The application included an Operational
Management Plan which clearly outlines the
- Events will operate 7 days a week
anticipated type and number of events and
and include long trading hours i.e. up
patrons including operating days and hours.
to 20 hours a day.
Notably, the anticipated number of events, patron
- Up to 150 patrons per event and
numbers and operating hours are maximums and
concerns the number of events will
Page 31 of 68
Page 32
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
increase in the future i.e. 5-7 events may be less depending on demand throughout the
per week. year.
Regardless, the noise report which has been peer
reviewed by Council’s external noise expert, has
demonstrated that the proposal does not result in
unacceptable noise impacts, subject to the need
to construct an acoustic barrier within the access
strip.
In respect of submitter concerns that the proposal
may be expanded to include additional events,
any such expansion would require further
development approvals via a change or new MCU
application and would need to be assessed at that
time.
Equestrian events and holding yards There is no proposal for these activities currently
for horses being assessed by Council.
- A concern was raised by a submitter Holding yards for horses would be defined as
that there was talk of equestrian Animal Keeping under the Noosa Plan 2020. The
events and holding yards for horses keeping of 3 horses would be accepted
proposed in the future. development.
Animal Keeping for more than 3 horses would be
accepted development subject to requirements or
code assessable if not compliant with the relevant
assessment benchmarks.
Equestrian events or similar would be Impact
Assessable and be subject to a full assessment
against the planning scheme.
Lack of community consultation and The application was Impact Assessable and
public notification public notification was carried out in accordance
with the requirements under section 53(10) of the
- Concerns that some owners did not
Planning Act 2016.
receive notification from Council or
the applicant. The requirements for public notification include:
- The sign at the front of the property is
a) placing notice on the premises the subject
not sufficiently visible.
of the application that must remain on the
premises for the period of time up to and
including the stated day; and
b) giving notice to the adjoining owners of all
lots adjoining the premises the subject of the
application; and
c) publishing a public notice complying with the
public notice requirements stated in the
confirmation notice.
Submissions in Support
Economic diversification The submissions emphasise the local
economic benefits and business opportunities
- Reduces the region’s dependence on
that will result from the proposed
seasonal tourism and builds economic
development.
resilience.
Page 32 of 68
Page 33
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
- The proposal is consistent with the
objectives of the Noosa Shire Economic
development strategy 2021-2030
- The proposal will support local
businesses such as event planners,
florist and photographers. Encourages
collaboration and connectivity between
businesses provide wider long term
economic benefits for the Noosa region.
- Promotes a more resilient and
prosperous hinterland.
Employment opportunities The submissions emphasise the potential
employment and business opportunities that
- The proposal has potential to create
could arise from the proposed development.
employment opportunities for local
residents, including event coordinators,
caters and hospitality roles.
- Opportunities to upskill employees over
time and provide opportunities for
existing businesses and employers.
- There are limited employment
opportunities in Pomona.
- Increase patronage to local businesses,
such as accommodation, restaurants and
service centres.
Environmental outcomes The submissions acknowledge that the
proposal has been designed to showcase the
- Contributes towards Noosa’s
areas nature features and protects the stie’s
environmental stewardship goals by
natural and ecological values.
fostering ecologically sustainable design
that, among other things maintains the
site’s ecological values.
- The proposal works in harmony with the
rural character and has been designed to
protect and integrate with the
surrounding landscape.
Amenity and site suitability Some of the submissions acknowledge the
site planning and reporting that has been
- Careful site planning has been
undertaken to address and minimise amenity
undertaken to address traffic and noise
impacts.
concerns.
- The marquee is to be located a minimum Notably, some submissions also acknowledge
700m from the nearest residential that the existing farming use has dust and
dwelling, thus minimising any amenity noise impacts on the area.
impacts on adjoining residents.
- Operation management plan is a
practical and sensible means of
addressing environmental impacts, noise
and rural amenity issues.
- The existing macadamia farm operation
contributes to the noise and dust during
harvesting and deshelling.
Page 33 of 68
Page 34
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
Planning need There are a number of submissions which
clearly emphasise the lack of any suitable
- As a caterer there is a pressing need for
facilities in the rural hinterland, particularly
such a facility in the rural hinterland, with
those that can showcase unique natural
limited options for those seeking a
landscapes.
unique, serene and picturesque setting
for their special occasion.
- Existing event venues are situated in
urban or coastal areas and the proposed
development provides an opportunity to
fill a gap in the market.
- Proposal provides increased consumer
choice, so they do not need to find
appropriate venues outside the region.
Traffic A number of submissions acknowledge that
the proposal will improve road safety due to
The proposal involves upgrades to Louis
the proposed road works for the new access.
Bazzo Rd and as such improves the level of
safety for all road users.
Noosa Brand A number of submissions acknowledge the
proposal’s positive contribution to the “Noosa
Promotes Noosa Brand
Brand” which is outlined in Council’s
Enhances Noosa reputation as a premiere Economic Development Strategy 2021-2030.
tourist destination.
5. HUMAN RIGHTS COMPATIBILITY STATEMENT
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in
a manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.
6. CONCLUSION & REASONS FOR DECISION
This application is for a material change of use of premises for a function facility for the purpose of
holding functions, weddings and events.
The site is zoned Rural and is currently operating as a macadamia farm. The existing macadamia
farm will continue to operate in conjunction with the proposed use.
The proposal involves establishing a permanent marquee, with a canapes terrace and cocktails
terrace with associated car parking and manoeuvring areas adjacent to an existing waterbody.
The application meets the relevant provisions, Overall Outcomes and Purposes of the applicable
codes.
The application was referred to and approved by the State Assessment Referral Agency (SARA)
for State controlled road matters. Conditions for upgrades and sight distance are required by SARA
to ensure the safety and efficiency of Louis Bazzo Drive.
In support of the proposed development specialist reports have addressed matters relating to
noise, environmental protection, bushfire risk, stormwater management, traffic impacts and
engineering services.
The application underwent Public Notification, where 60 properly made submissions were
received. These submissions have been reviewed and the assessment manager has considered
the matters raised in their assessment.
Page 34 of 68
Page 35
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 10 DECEMBER 2024
The development has been externally reviewed from a noise management perspective and
generally been assessed internally by Council’s specialist engineering and environmental officers.
From an economic perspective, Council’s Manager, Economic Development supports the
proposal.
The application is recommended for approval.
Departments consulted:
Office of the CEO, Mayor & Community Services Corporate Services
Councillors
Mayor & Councillors Director Director
Chief Executive Officer Community Development Financial Services
Executive Officers Sport & Active Lifestyles Fleet
Community Engagement Arts & Culture Revenue Services
People & Culture Community Connection ICT
Governance Customer Experience Commercial Property
Strategy & Environment & Development & Regulation Infrastructure Services
Sustainable Development
Director X Director Director
Strategic Land Use Planning X Development Assessment Infrastructure Planning, Design
and Delivery
X Economic Development & Local Laws Civil and Asset operations
Destination Management
Environmental Services Environmental Health Asset Management
Innovation & Digital Hub Building & Plumbing Building & Facilities
Property / Permits Disaster Management
X Waste
Page 35 of 68
Page 36
ATTACHMENT 3 - (MCU24/0084) - PROPOSAL PLANS
PROPOSAL SUMMARY
LOT 4 ON RP160124
LOCAL AUTHORITY : NOOSA SHIRE COUNCIL
LOCALITY : RINGTAIL CREEK
SITE AREA : 99.9HA
PROJECT USAGE BREAKDOWN :
WEDDING VENUE :
150 pax FUNCTION MARQUEE = 300m2
CANAPES TERRACE = 221m2
COCKTAILS TERRACE = 287m2
JETTY = 41m2
AMENITIES = 20m2
CATERING = 18m2
STORAGE CONTAINER = 30m2
REFUSE = 13m2
TOTAL = 930m2
ON-SITE PARKING PROVISIONS
CAR PARKING : PROPOSED
WEDDING VENUE : STAFF CAR PARKS = 04
PATRON CAR PARKS = 46
COACH PARKS = 02
SUBJECT SITE TOTAL WEDDING VENUE PARKING PROVIDED: = 50
SERVICE VEHICLE PROVISIONS
SERVICE VEHICLES : PROPOSED
VAN = 01
NOTES :
- ALL CAR PARKING IN ACCORDANCE WITH AS2890.1
- ALL BICYCLE PARKS IN ACCORDANCE WITH AS 2890.3
- BICYCLE STORAGE AS SHOWN
- MINIMUM TYPICAL DIMENSIONS
01 SITE LOCATION
1:5000
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:5000 @A1 1:10000@A3
issue : 05 date : 29-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK LOCATION PLAN & SUMMARY 5785-DA01
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Monday, 29 July 2024 4:04 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1584.0.64.0
Document Set ID: 23364411
23153895
Page 36 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 37
7°4930
720|242
PP
PP
PP
A
PP
225|871
97°4340
GATE
L
O
U
GATE
IS
18.0m OF ROAD AT
B
MIN. 6.0m WIDE
A
Z Z
*
O
D R I
V E
81|839
97°4350
* *
GATE
293° |401
1115
2040
* *
97°5120
350|36
MASTERPLAN LEGEND
D A EXISTING MACHINERY SHED
C
PP
B
B EXISTING DAM
C 10m x 30m WEDDING MARQUEE
D 15m x 20m LEVEL AREA & OVER WATER DECK
* EXISTING PROPERTY ACCESS TO BE RETAINED
NOTE: 18.0m LENGTH FROM ENTRY TO BE min 6.0m WIDE
* APPROACHES TO BEND min. 6.0m WIDE
INTERNAL ROAD - TYP 5.5m WIDE
351|416
97°5145
INTERNAL MAINTENANCE ROAD - TYP 3.5m WIDE
NOTE: PASSING LANES TO BE PROVIDED AT APPROX. 30.0m SPACINGS
PROPOSED SERVICE ROAD - TYP 3.0m WIDE
1019|017
187°4730
FIRE EGRESS ROAD - TYP 3.5m WIDE
POTABLE WATER SUPPLY 2 x 2300L
01 SITE MASTER PLAN 01
1:2500
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:2500 @A1 1:5000 @A3
issue : 06 date : 30-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK SITE MASTER PLAN 5785-DA02
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 30 July 2024 12:06 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1585.0.64.0
Document Set ID: 23364411
23153895
Page 37 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 38
22
95.0
54
00
21
00
AL
67
25
00
P IC 0
TY
0
25
00
25
00
25
54
00
15
2 x 1100L BINS EXISTING ORCHARD
93.5
S
A RK
38 P L
CAR AVE 2
6 R G m 40FT STORAGE CONTAINER
4 10 C1 C2
39 12
93.0 STAFF CAR PARKS
08 53m2
GRAVEL ACCESS ROAD
C3 C4
REFUSE
92.5
300 m2
07 02 WEDDING MARQUEE
46
ACH 221 m2
CO CANAPES TERRACE
RL 92.100
92.0 GEN
92.050
I NG
01 RK 01
A CH
P 91.5
CH C OA UP UP
A
CO
287 m2
COCKTAILS TERRACE
91.0 RL 91.200
RL 91.200
90.5
90.0
89.5
JETTY
RL 89.550
EXISTING DAM
RL 88.750 ON
20/12/2023
01 SITE PLAN WEDDING VENUE
1:200
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:200 @A1 1:400@A3
issue : 06 date : 30-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK SITE PLAN - WEDDING VENUE 5785-DA03
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 30 July 2024 12:06 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1585.0.64.0
Document Set ID: 23364411
23153895
Page 38 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 39
93.5
A
DA06
DOUBLE TRAILER
WITH 2 x SEWER
CONNECT TOILETS
DOUBLE TRAILER
C1 40FT STORAGE CONTAINER C2
2100
WITH 2 x SEWER
CONNECT TOILETS
6300 6300
93.0 1:2 BATTER
STAFF CAR PARKS
3000
53m2
GRAVEL ACCESS ROAD
5000
30000 C3 C4
2100
6300 6300
PE
DE ATH
ST
P
92.5
RI
AN
REFUSE
CATERING
WEDDING MARQUEE
10000
RL 92.100
CANAPES TERRACE
92.0 DECO GRANITE
92.050 GENERATOR
1 :2 0
WAY
WALK
RL 91.625 RL 92.050
GARDEN GARDEN
91.5 UP UP
W
1: KWA
AL
20 Y
800H TIMBER SLEEPER 800H TIMBER SLEEPER
RETAINING WALL RETAINING WALL
1:3 BATTER
COCKTAILS TERRACE
DECO GRANITE
RL 91.200
91.0
RL 91.200
90.5
RL 90.250
1:3 BATTER
90.0
1:20
WALKWAY
RL 89.750
89.5
01 FLOOR PLAN WEDDING VENUE
1:100
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:100 @A1 1:200 @A3
issue : 06 date : 30-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK FLOOR PLAN - WEDDING VENUE 5785-DA04
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 30 July 2024 12:07 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1585.0.64.0
Document Set ID: 23364411
23153895
Page 39 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 40
8.0m HEIGHT LIMIT
GENERATOR
MARQUEE APEX
RL 96.745
1445
MARQUEE PITCH
RL 95.300
3200
EXISTING GROUND LINE
RECEPTION LEVEL
RL 92.100
PROPOSED GROUND LINE
01 NORTH-WEST ELEVATION
1:100
8.0m HEIG
HT LIMIT
HEIGHT LIMIT
8.0m
EXISTING GROUND LINE
EXISTING GROUND LINE
MARQUEE APEX
RL 96.745
1645
MARQUEE PITCH
RL 95.100
ACCESS ACCESS
PROPOSED GROUND LINE
3000
ROAD PROPOSED GROUND LINE ROAD
CANAPE TERRACE
RECEPTION LEVEL
RL 92.100
GENERATOR CONTAINER
02 SOUTH-WEST ELEVATION 03 NORTH-EAST ELEVATION
1:100 1:100
8.0m HEIGHT LIMIT
MARQUEE APEX
RL 96.745
1445
PROPOSED GROUND LINE GENERATOR
MARQUEE PITCH
RL 95.300
3200
RECEPTION LEVEL
RL 92.100
8.0m HIGH TIMBER SLEEPER RETAINING WALL
8.0m HIGH TIMBER SLEEPER RETAINING WALL
04 SOUTH-EAST ELEVATION
1:100
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:100 @A1 1:200 @A3
issue : 05 date : 29-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK ELEVATIONS 5785-DA05
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Monday, 29 July 2024 4:04 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1584.0.64.0
Document Set ID: 23364411
23153895
Page 40 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 41
8.0m HEIG
HT LIMIT
EXISTING GROUND LINE
MARQUEE APEX MARQUEE APEX
RL 96.745 RL 96.745
MARQUEE PITCH MARQUEE PITCH
RL 95.300 RL 95.300
ACCESS PROPOSED GROUND LINE
ROAD WEDDING MARQUEE
COCKTAILS TERRACE
RECEPTION LEVEL RECEPTION LEVEL
RL 92.100 RL 92.100
DAM RL 88.750
01 [ DA ] SECTION
1:100
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:100 @A1 1:200 @A3
issue : 05 date : 29-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK SECTION 5785-DA06
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Monday, 29 July 2024 4:04 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1584.0.64.0
Document Set ID: 23364411
23153895
Page 41 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 42
ADDITIONAL FLOOD HAZARD AREA
DAM
WATERWAYS
ROAD
WEDDING MARQUEE
Source: Noosa Shire Council Online Mapping
01 FLOOD HAZARD OVERLAY
1:2500
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:2500 @A1 1:5000 @A3
issue : 05 date : 29-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK FLOODING HAZARD OVERLAY 5785-DA10
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Monday, 29 July 2024 4:04 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1584.0.64.0
Document Set ID: 23364411
23153895
Page 42 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 43
AREA OF BIODIVERSITY SIGNIFICANCE
MSES ENVIRONMENTAL VALUES
RIPARIAN BUFFER AREA
MSES REGULATION VEGETATION AREA
DAM
WATERWAYS
ROAD
WEDDING MARQUEE
Source: Noosa Shire Council Online Mapping
01 BIODIVERSITY OVERLAY
1:2500
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:2500 @A1 1:5000 @A3
issue : 05 date : 29-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK BIODIVERSITY OVERLAY 5785-DA11
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Monday, 29 July 2024 4:04 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1584.0.64.0
Document Set ID: 23364411
23153895
Page 43 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 44
KOALA PRIORITY AREA
DAM
WATERWAYS
ROAD
WEDDING MARQUEE
Source: Noosa Shire Council Online Mapping
01 KOALA OVERLAY
1:2500
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:2500 @A1 1:5000 @A3
issue : 05 date : 29-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK KOALA OVERLAY 5785-DA12
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Monday, 29 July 2024 4:04 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1584.0.64.0
Document Set ID: 23364411
23153895
Page 44 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 45
HIGH POTENTIAL BUSHFIRE INTENSITY
POTENTIAL IMPACT BUFFER
DAM
WATERWAYS
ROAD
WEDDING MARQUEE
Source: Noosa Shire Council Online Mapping
01 BUSHFIRE OVERLAY
1:2500
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:2500 @A1 1:5000 @A3
issue : 05 date : 29-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK BUSHFIRE OVERLAY 5785-DA13
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Monday, 29 July 2024 4:04 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1584.0.64.0
Document Set ID: 23364411
23153895
Page 45 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 46
HIGH HAZARD AREAD
MODERATE HAZARD AREA
DAM
WATERWAYS
ROAD
WEDDING MARQUEE
Source: Noosa Shire Council Online Mapping
01 LANDSLIDE OVERLAY
1:2500
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:2500 @A1 1:5000 @A3
issue : 05 date : 29-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK LANDSLIDE OVERLAY 5785-DA14
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Monday, 29 July 2024 4:04 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1584.0.64.0
Document Set ID: 23364411
23153895
Page 46 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 47
TOILETS
20 m2 STORAGE CONTAINER
30 m2
13 m2
FUNCTION MARQUEE
300 m2
CANAPES TERRACE
221 m2 REFUSE - 13m2
CATERING - 18m2
COCKTAILS TERRACE
287 m2
AREAS
CATERING = 18m2
REFUSE = 13m2
STORAGE CONTAINER = 30m2
AMENITIES = 20m2
COCKTAILS TERRACE = 287m2
JETTY
41 m2
CANAPES TERRACE = 221m2
FUNCTION MARQUEE = 300m2
JETTY = 41m2
01 GENERAL AREAS
1:200
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:200 @A1 1:400 @A3
issue : 04 date : 30-07-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK GROSS FLOOR AREA 5785-DA17
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 30 July 2024 12:06 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1585.0.64.0
Document Set ID: 23364411
23153895
Page 47 of 68
Version: 1, Version Date: 21/11/2024
02/08/2024
Page 48
ATTACHMENT 4 - (MCU24/0084) - OPERATIONAL
MANAGEMENT PLAN
LOUIS BAZZO PTY LTD
Operational Management Plan
Date: June 2024
Document Set ID: 23085661
Page 48 of 68
Version: 1, Version Date: 01/07/2024
Page 49
1. Introduction
Louis Bazzo Pty Ltd, located at 658 Louis Bazzo Dr, Ringtail Creek 4565 is looking to cater for weddings and events on its
private property.
The Venue Owners are seeking to create a wedding / event space that includes the erection of a 10x30m permanent
marquee and plan to operate in a manner which respects and maintains the peaceful natural environment. This
Operation Plan sets out the operational requirements that will be complied with for any wedding or function carried
out at Louis Bazzo Pty Ltd.
The responsibility for events will always be maintained by the land-owner/s to ensure its use is consistent with any
development approval conditions and activities outlined in this Operational Management Plan.
2. Management
The venue will be managed by Simon Skerrett and his highly experienced team. Simon started in the weddings and
events industry as a side project in 2019 after a background in finance where he launched and ran a successful finance
business for the agriculture industry.
Simon established wedding & events venue Rosewood Estate Pty Ltd at Beechmont in the Scenic Rim region of SEQ as a
greenfield project after viewing the land and realising its potential. The property is rurally zoned and an MCU for a
wedding and events venue was applied for and granted. The first two years of operation were extremely challenging
with covid hitting as Rosewood Estate was launching. Rosewood has since gone from strength to strength and is now
one of the top venues in SEQ hosting 80-90 wedding per year, with busy months booked nearly 2 years in advance.
As testament to its attractiveness, the Scenic Rim Council recently held their launch event in Rosewoods 10x30m
permanent marquee, celebrating 10 years of the Scenic Rim Eat Local month. Local Mayor Greg Christianson praised
Rosewood Estate for its representation of the Scenic Rim and all its beauty.
The local town of Beechmont can’t speak highly enough of the venue as it provides much needed visitors to the area on
a weekly basis, filling local accommodation and cafes with paying guests and customers. Simon and the team at
Rosewood work closely with neighbours and have never had any issues with noise, which is monitored closely at each
event. The venue directly and indirectly employs many locals and people from the region.
Rosewoods google reviews provide some insight to the experience couples have when hosting their weddings at
Rosewood, with many proclaiming their time at Rosewood Estate with family and friends to be one of the most
memorable.
Simon is currently in the process of setting up a sister venue to Rosewood called Sarabah Estate Weddings based near
Canungra in the Scenic Rim.
Simon’s management team that assist him operate under the business The White Stag and manage a further 5 wedding
and events venues, providing invaluable experience, data and insights into the industry.
3. Use
The venue will predominantly be marketed as a wedding venue though will host other events such as long lunches,
wellness / nature retreats & corporate retreats.
Event Schedule
Guests J F M A M J J A S O N D Total
Weddings / Function up to 150 2 2 6 6 6 6 6 8 8 8 8 6 72
Weddings / Function - Micro / Elopement up to 20 1 1 1 1 1 1 1 1 1 1 1 1 12
Long Lunches up tp 100 0 0 1 0 1 0 1 0 0 0 0 0 3
Wellness / Nature Retreat up to 20 0 0 0 1 1 1 1 0 0 0 0 0 4
Corporate Retreat up to 50 0 0 1 1 1 1 1 0 0 0 0 0 5
Event Size
Car Parking
Guests Traffic Targets
Spaces
Bus (20 or Taxi (4) /
Own (4) Required Available
50) Maxi (6)
Weddings / Function up to 150 70% 10% 20% 50 55
Weddings / Function - Micro / Elopement up to 20 0% 10% 90% 5 55
Long Lunches up to 100 80% 10% 10% 20 55
Wellness / Nature Retreat up to 20 100% 0% 0% 5 55
Corporate Retreat up to 50 50% 10% 40% 25 55
Document Set ID: 23085661
Page 49 of 68
Version: 1, Version Date: 01/07/2024
Page 50
4. Use Area
Wedding and other event guests are permitted to congregate in designated areas to the front and side of the Marquee.
Wedding ceremonies will be conducted on the grassed area between the Marquee and dam, weather permitting.
The rear of the marquee will house a shipping container for furniture storage, refuse bins, a generator for back up
power and an area for catering.
Parking for cars and buses will be provided in designated areas adjacent to the Marquee.
Bridal/Wedding Party photography will take place throughout the property and will be supervised at all times.
Service vehicles and suppliers will have access to the rear of the Marquee.
4.1. Use Area Controls
Guests will be prevented from venturing outside the approved use area via the following methods:
• String lights and guide fencing will be erected along the edges of the use area as a barrier to prevent
guests accidentally wandering into prohibited areas;
• The MC of the ceremony will notify and remind guests where they are allowed to go during the function;
• All guests will also be pre-advised by the wedding coordinator/MC where the prohibited and non-
prohibited areas are located;
• Signage will be erected permanently to guide guests towards non-prohibited areas; and
• Venue personnel will assist coordinators in directing guests towards non-prohibited areas.
5. Hours of Operation
The available hours of operation will be from 11am until 11pm Monday to Sunday.
It is generally expected that standard weddings and events will be held on Friday-Sunday, with weekdays generally
hosting micro/pop-up weddings (for example small elopements).
5.1. Bump-in
‘Bump-in’ or ‘set-up’ occurs during 9am to 5pm either on the day of the event, or the day before the event
(depending on the size and requirements for each individual wedding/function). “Bump-in’ will be coordinated
through venue personnel to ensure safety and efficiency.
5.2. Event day
Access on the event day will be from 11am to 11pm with all guests encouraged to arrive by no later than 5pm. All
events will conclude by 10:30pm, with all guests commencing departure at 10:30pm. All guests, vehicles and buses
are required to have departed by 11pm.
5.3. Bump-out
Access one (1) day after the event for pack-down between 9am and 5pm. Bump-out will be coordinated by venue
personnel to ensure safety and efficiency.
6. Food & Beverage
All food will be cooked and prepared by catering companies offsite and transported to the venue prior to service.
Caterers will have a designated space at the rear of the marquee for food service.
The venue will be BYO with a requirement that all alcoholic beverages be served at functions by RSA accredited staff.
7. Staff Numbers
A minimum of one (1) Event Manager will be onsite for all weddings/functions.
A minimum of one (1) On-Day Coordinator will be onsite for the duration of all weddings/functions.
One (1) RSA Licensed Bar staff member is required per 50 guests.
Other staff, such as caterers, photographers, florists, stylists and celebrant are also permitted on-site during the event.
8. Guest Numbers
The Owners will adhere to a maximum of 150 guests on-site for any one event or as dictated by the development
permit. The average size of weddings is expected to be 80-120 guests, only a handful of events each year will exceed
this.
9. Bookings
Clients will be required to sign a booking contract for all confirmed events. Should at any time the contract be in
breach, the event can be shut down and guests will be evacuated immediately.
Clients will also be required to engage an approved event on-day coordinator to ensure the events run to plan as per
run sheet.
The approved on-day coordinator will also be required to assist with all ‘Bump-in’, ‘set-up’ ‘Bump-out’. The approved
on-day coordinator will also be required to be onsite for the full duration of the event.
In addition, all event organisers, suppliers and vendors must hold appropriate public liability insurance cover and be
willing to provide this to the venue upon request.
Document Set ID: 23085661
Page 50 of 68
Version: 1, Version Date: 01/07/2024
Page 51
10. Travel & Transport
10.1. Access
Vehicle access will be strictly via the main driveway entrance.
10.2. Travel arrangements
Approximately 70-80% of guests will be chauffeured to and from the venue via private bus/coach for larger events
such as weddings. This equates to approximately 1-2 bus ‘runs’ per wedding (for an average size wedding of 80-100
guests).
The remaining 20-30% of guests will arrive via private transport including personal vehicle, taxi or Uber. All guests
and suppliers will be encouraged to arrive no later than 5pm.
Suppliers and other staff will arrive and depart via personal transport; however car- sharing is encouraged in order
to reduce the demand for parking on-site.
Following the conclusion of the event, departure will commence by 10:30pm, with all vehicles and buses required
to have departed by 11pm.
10.3. Off-site bus service procedures
Buses/Coaches will be encouraged to chauffeur guests to and from each wedding event.
Experienced private bus companies will be contracted for services. Guests will be collected and dropped off at pre-
determined pick-up/drop-off locations on the Sunshine Coast.
10.4. Onsite parking and drop-off areas
On-site car parking is located adjacent to the marquee and is expected to consist of 55 x standard and 1 x PWD car
parking bay, plus 2 bus parking bays.
Buses will collect/drop guests off at the bus bay/loading zone located adjacent to car parking bays. Buses will be
required to return to their depot or vacate site between transfers or park on-site in the allocated bus parking bays.
The Uber and taxi drop-off/pick-up zone will also be located on the main driveway adjacent to the parking bays.
Suppliers will also have access to the rear of the marquee for drop-offs and parking. The rear of the marquee will
be accessible via a service rd.
Permanent signage and lighting where required will be erected to direct drivers towards the carpark and to direct
guests from the car parking area or drop-off zone towards the venue area.
Parking of personal vehicles, taxis, Ubers, buses or other supplier vehicles will not be permitted on the existing
main road, being Louis Bazzo Dr.
11. Adverse weather
No weddings will be held during a natural disaster. Weather reviews will be made 7 days, 72 hours, 8 hours and 4 hours
prior to all events. In the event of a natural disaster the event will be postponed or cancelled and moved to an alternate
date based on weather forecasts.
In terms of adverse weather not including a natural disaster (such as light rain), wedding ceremonies will be held
indoors (in the Marquee used for receptions) or a separate marquee will be erected.
12. Noise requirements and restrictions
Noise restrictions will apply to the venue in accordance with the recommendations of the Acoustic Report. Noise
restrictions will apply to the venue, with amplified music limited to being played within the enclosed Marquee and at
an expected level not higher than 90 decibels. Any music played outside during outdoor ceremonies or events will be
limited to an expected level not higher than 70 decibels and be acoustic only.
All music will move indoors after 7pm. No music will be played past 10:30pm.
In addition, noise levels will be monitored and recorded throughout each event by the Event Manager. A decibel meter
reader will be used to measure noise levels with a record kept of measurements. If noise continually exceeds
acceptable levels, the event will be shut down and guests asked to leave.
13. Bump-in and bump-out procedures
A run sheet will be prepared by the Event Planner to ensure all suppliers are met personally and are correctly guided to
complete install and pack-down activities.
Clients will have access to ‘bump-in’ either the day before or the day of the event.
All suppliers will be required to hold current Public Liability Insurance and applicable qualifications according to their
service.
All safety equipment required on-site will be the responsibility of the supplier.
Access times for suppliers to conduct ‘bump-in’ and ‘bump-out’ activities will be restricted as follows:
• ‘Bump-in’ the day prior to the event - 9am until 5pm
• Event day - 9am until 5 pm
• ‘Bump-out’ the day after the event - 9am until 5pm
• The delivery and pick up of larger items will be limited Monday to Friday 8am-3pm.
Document Set ID: 23085661
Page 51 of 68
Version: 1, Version Date: 01/07/2024
Page 52
14. Waste Management
Event managers and Owners will ensure that all waste is removed off-site in accordance with this Operational
Management Plan.
The site will include a waste storage point which is located immediately behind the marquee.
Clients and suppliers will be required to place rubbish in following provided waste bins following each event:
• 2 x industrial general waste bins
• 2 x industrial recycle bins
The bins storage area will be screened and accessed by local contractors when required.
Bottles and cans will be collected and donated to local schools as a source of income. All other recyclable material will
be put out for collection in appropriate wheelie bins.
Clients will be advised that if all waste is not put in bins provided following the event a cleaning fee will be charge from
the bond.
Designated smoking areas will be identified with appropriate smoking signage and aides for cigarette butt disposal to
prevent cigarettes being littered around the property.
15. Toilet Facilities
Fully serviceable portable powder rooms (portaloos) are provided. Each event will be provided with one (2) female and
(2) male portaloos, with wheelchair accessible portaloos available upon request. Portaloo holding tanks will be pumped
out onsite by local service providers as required.
16. Environmental Protection
In order to protect the environment and surrounding ecosystem of the property a number of restrictions and
requirements will apply.
Guests and suppliers must ensure that all rubbish is placed in appropriate bins at the conclusion of the event.
Any confetti used at the event must be biodegradable or eco-friendly, dried flowers and petals are permitted.
Dogs are allowed to be included in events following written approval of Event Manager and are required to be on a
leash and monitored at all times.
The use of the Fire-pit is subject to a “no fire ban” put in place by the local Rural Fire Brigade.
Appropriate firewood will be provided by Louis Bazzo Pty Ltd (no burning of native vegetation will occur). In addition,
no fireworks that make a noise are permitted on Louis Bazzo Pty Ltd.
17. On-site control and enforcement procedures
A minimum of one (1) Event Manager or (1) On-Day Coordinator (Event Managers) will be onsite for the duration of an
event. The Event Manager/ Coordinator will ensure the event is executed within the parameters of the permit and in
accordance with this Operational Management Plan. Regular venue and event operation checks will be completed
throughout the duration of the event to ensure the requirements of this Operational Management Plan are adhered to.
The Event Managers and owners will not tolerate any unruly, disruptive or inappropriate behaviour and will ensure the
appropriate authorities are contacted should these circumstances occur.
Clients will be required to nominate a communications contact person (preferably a non-drinker or parent) to liaise
with the Event Manager in the event of any unacceptable behaviour, rule breaking or other incidents concerning
guests. In such an event, the Event Manager will take appropriate steps to deal with the situation such as restricting
further alcohol intake, the quiet removal of persons found to be displaying unacceptable behaviour from the event, or
contacting appropriate authorities such as the Police.
In addition, clients will be required to provide contact numbers for all suppliers to ensure the Event Managers can call
them directly with any concerns or issues for the duration of the event.
18. Complaint Procedures
All complaints will be logged in a complaint register. Once a complaint is received, the Event Manager will respond by
addressing the core component of the complaint immediately after it is received. Further action will be taken if the
complaint is not rectified. Depending upon the nature of the complaint, the Event Manager will contact the appropriate
authorities for further action if required.
19. Review
This Operational Management Plan will be reviewed after each event to ensure that Louis Bazzo Pty Ltd can continually
meet the Client’s requirements whilst maintaining Council permit guidelines.
Document Set ID: 23085661
Page 52 of 68
Version: 1, Version Date: 01/07/2024
Page 53
ATTACHMENT 5 - (MCU24/0084) - EMERGENCY
MANAGEMENT PLAN
LOUIS BAZZO PTY LTD
Emergency Action Plan
Date: June 2024
Document Set ID: 23085663
Page 53 of 68
Version: 1, Version Date: 01/07/2024
Page 54
Emergency contacts
Organisation Name Contact Title Phone number
ALL - - 000
State Emergency - - 13 25 00
Services (SES) -
Nambour
Police – Noosa - - (07) 5440 8111
Police – Pomona - - (07) 5480 1733
Fire – Noosa - - (07) 5473 8484
Rural Fire – 000
Verrierdale
Rural Fire - Valdora 000
Ambulance – Coolum - - 000
Beach
Event Manager TBC
Event Coordinator TBC
Owner / s TBC
Document Set ID: 23085663
Page 54 of 68
Version: 1, Version Date: 01/07/2024
Page 55
Pre-Event Monitoring
Organisation Action Emergency Reporting Event
Name Notice
/ Updates
Fire Monitor Fire Danger during week leading up to event. Make Refer Emergency Notify
organiser aware of any extreme / high fire danger warnings. Contacts List Venue hirer
/ event
Make organisers aware of any bans or restrictions relating to the
organiser
lighting of fires and smoking of cigarettes.
Flood Monitor Flood Danger during week leading up to event. Make
Refer Emergency Notify
organiser aware of any extreme / high flooding danger warnings.
Contacts List Venue hirer
Make organisers aware of any potential access restrictions and / event
evacuation flood height measurements which may trigger an organiser
evacuation during an event or cancellation of event.
Ongoing monitoring of flood water height measure at
creek location each hour leading up to event and during
event if flood warning has been issued by emergency
services.
Storm Monitor Severe Storm Danger - BOM and Emergency Services
websites during week leading up to event. Make organiser aware of Refer Emergency Notify
any potential severe storm danger warnings. Contacts List Venue hirer
/ event
organiser
Assault / Make organisers aware that under no circumstances will bad
Refer Emergency Notify
Gate language, over boisterous behaviour and assault on another guest
Contacts List Venue hirer
Crashers be acceptable and that Police will be called in an event of this
/ event
nature.
organiser
In the case of gate crashers / un invited guests they will be
turned away by the nominated security officer or on site manager.
Guests will only be allowed to enter site with a valid invitation or
gate pass.
Police will be called to intervene in an event of this nature.
Health Should there be a First Aid requirement in relation to an accident
or sudden health issue (e.g. heart attack, overdose, fainting, cut Refer Emergency Notify
or broken limb) Contacts List Venue hirer
/ event
Contact the on-site first aid officer and commence First Aid organiser
treatment accordingly. First Aid officer or responsible person to
contact Emergency Services if required.
Document Set ID: 23085663
Page 55 of 68
Version: 1, Version Date: 01/07/2024
Page 56
Emergency procedures
Procedures Brief outline of procedures Evacuation Supporting
point/ documentation
address
Fire 1. Alarm raised and relevant emergency services authorities Emergency Site Plan – Emergency
Evacuation contacted. Evacuation Point – Evacuation point
Procedure located at the top
2. Wait for evacuation signal. of the carpark
Refer to Bushfire
3. Follow fire warden instructions. Emergency Response
4. Assemble at emergency evacuation point. Plan prepared by NCES
5. Calmly evacuate the premises from nearest emergency exit.
6. Arrive at evacuation location.
7. Locate and account for all staff and guests.
Flood 1. Alarm raised and relevant emergency services authorities Emergency Site Plan – Emergency
Evacuation contacted. Evacuation Point – Evacuation point
Procedure located at the top
2. Wait for evacuation signal. of the carpark
3. Follow flood warden instructions.
4. Calmly evacuate the premises from nearest emergency exit.
5. Arrive at evacuation location.
6. Locate and account for all staff and guests
Severe Storm 1. Alarm raised and relevant emergency services authorities
Evacuation contacted. Emergency Site Plan – Emergency
Procedure Evacuation Point – Evacuation point
2. Wait for evacuation signal. located at the top
of the carpark
3. Follow Event Emergency warden instructions.
4. Calmly evacuate the premises from nearest emergency exit.
5. Arrive at evacuation location.
6. Locate and account for all staff.
Guest Assault 1. Alarm raised and relevant emergency services authorities
contacted. Emergency Site Plan – Emergency
/ Gate
Evacuation Point – Evacuation point
Crashers
2. Wait for evacuation signal. located at the top
Procedure
of the carpark
3. Follow Security Officer / Police Officer instructions.
4. Calmly evacuate the premises from nearest emergency
exit.
5. Arrive at evacuation location.
6. Locate and account for all staff and guests
Fallen Power 1. In South East Queensland call Energex on 13 62 62
Lines Emergency Site Plan – Emergency
2. Keep all guests clear of any fallen power lines and Evacuation Point – Evacuation point
wait until Energex has shut off the power supply.
located at the top
3. Activate the emergency power generator to supply of the carpark
flood lighting for gusts and for evacuation from the
site in the dark.
Document Set ID: 23085663
Page 56 of 68
Version: 1, Version Date: 01/07/2024
Page 57
Emergency Evacuation Point
Document Set ID: 23085663
Page 57 of 68
Version: 1, Version Date: 01/07/2024
Page 58
Evacuation drill schedule
Evacuation procedure Drill frequency Staff Induction Position/persons responsible
type
Fire annually Pre each event Simon & Event Manager
Flood, severe storm
annually Pre each event Simon & Event Manager
Assault, gate crasher
annually Pre each event Simon & Event Manager
Health emergency
annually Pre each event Simon & Event Manager
Document Set ID: 23085663
Page 58 of 68
Version: 1, Version Date: 01/07/2024
Page 59
Emergency kit
Location - Kit will be located at the rear of the marquee in the catering area (next to First Aid Kit). Marked
Emergency Kit
Contents
Object Checked/Reviewed Date Person responsible
Emergency management plan (Month) 2024 Simon Skerrett
Emergency and recovery contacts
(Month) 2024 Simon Skerrett
Insurance documents
(Month) 2024 Simon Skerrett
Financial documents
(Month) 2024 Simon Skerrett
Torch
(Month) 2024 Simon Skerrett
First-aid kit
(Month) 2024 Simon Skerrett
Portable radio
(Month) 2024 Simon Skerrett
Plastic bags
(Month) 2024 Simon Skerrett
Spare batteries
(Month) 2024 Simon Skerrett
Adhesive tape
(Month) 2024 Simon Skerrett
Pen/pencil and notepad
(Month) 2024 Simon Skerrett
Document Set ID: 23085663
Page 59 of 68
Version: 1, Version Date: 01/07/2024
Page 60
Emergency team roles & responsibilities
Role Details of responsibilities Person Email Phone/Mobile numbers
responsible
Simon Skerrett &
First Aid Attend regular first aid training courses. [email protected] 0438782627
Officer Venue management
Administer first aid support in an team
emergency situation.
Contact ambulance services when
necessary.
Simon Skerrett &
Chief Fire Attend relevant training courses. [email protected] 0438782627
Warden Venue management
Communicate procedures to all staff. team
Supervise and action emergency
evacuation procedures (including
contacting emergency services,
accounting for staff and guests).
Conduct regular drills. Update procedures
regularly.
Attend relevant training courses. Simon Skerrett & [email protected] 0438782627
Chief
Flood Venue management
and Communicate procedures to all staff. team
Storm
Supervise and action emergency
Warden
evacuation procedures (including
contacting emergency services,
accounting for staff and guests).
Conduct regular drills. Update procedures
regularly.
Document Set ID: 23085663
Page 60 of 68
Version: 1, Version Date: 01/07/2024
Page 61
PLANNING & ENVIRONMENT COMMITTEE MEETING 10 DECEMBER 2024
7.2 PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY - OCTOBER 2024
Author Development Assessment Manager, Patrick Murphy
Development & Regulation Department
Index ECM/Subject/All Applications
Attachments 1. ATTACHMENT 1 - PLANNING APPLICATIONS DECIDED BY
DELEGATED AUTHORITY - OCTOBER 2024
EXECUTIVE SUMMARY
RECOMMENDATION
That Council note the report by the Development Assessment Manager to the Planning &
Environment Committee Meeting 10 December 2024 regarding applications that have been decided
by delegated authority as per Attachment 1.
REPORT
The Local Government Act 2009 allows, by resolution, a local government to delegate its powers to
the Mayor, CEO, a standing committee or a joint standing committee and the CEO to delegate those
powers to another employee of Council.
Under the current delegations for the Planning Act 2016 the ability to manage, assess and decide a
range of development applications are delegated to officers with the exception of the following which
are reported to Council for a decision:
a. An application for a variation request mentioned in section 61 of the Planning Act 2016 to
vary the effect of the Planning Scheme;
b. An application which is for an inconsistent use as defined in the Planning Scheme;
c. An application for a proposed development where more than 30 submissions have been
received during the notification part objecting to the proposed development;
d. An extension of an approval that was made under a superseded Planning Scheme (i.e. pre-
Noosa Plan 2020) and/or where there is a resolution of Council to amend the Planning
Scheme in a way that is relevant to the approval;
e. An impact assessable application involving the clearing of vegetation which is mapped as
being in a area of biodiversity significance on the Biodiversity, Waterways and Wetlands
Overlay Map and containing an endangered regional ecosystem, except in circumstances
where the clearing is exempt clearing:
f. The removal or demolition of a structure or place identified within the Planning Scheme’s
Heritage and Character Overlay Map;
g. A development where Council is the applicant requiring impact assessment.
It should be noted though that due to the strict time frames of the Planning Act 2016, officers under
the current delegations have the ability to decide an application where the application has the
potential for 'deemed approval'.
In accordance with the current delegations, a wide range of development applications are decided
by Council officers each month, with a limited number of applications reported to Council for a
decision.
Page 61 of 68
Page 62
PLANNING & ENVIRONMENT COMMITTEE MEETING 10 DECEMBER 2024
Attachment 1 lists applications that are decided by delegated authority during the month of October
2024 (excluding applications seeking to remove a tree(s) adjacent to a building or structure).
Included in attachment 1 is a table providing a snapshot of the total applications determined for the
month of October 2024.
Link to Corporate Plan
Not applicable.
Previous Council Consideration
Nil.
Finance
Nil.
Risk & Opportunities
Nil.
Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Departments consulted:
Office of the CEO, Mayor & Community Services Corporate Services
Councillors
Mayor & Councillors Director Director
Chief Executive Officer Community Development Financial Services
Executive Officers Sport & Active Lifestyles Fleet
Community Engagement Arts & Culture Revenue Services
People & Culture Community Connection ICT
Governance Customer Experience Procurement
Commercial Property
Strategy & Environment Development & Regulation Infrastructure Services
Director Director Director
Strategy & Sustainability X Development Assessment Infrastructure Planning, Design
and Delivery
Page 62 of 68
Page 63
PLANNING & ENVIRONMENT COMMITTEE MEETING 10 DECEMBER 2024
Economic Development & Local Laws Civil and Asset operations
Destination Management
Environmental Services Environmental Health Waste
Innovation & Digital Hub Building & Plumbing Building & Facilities
Property / Permits Disaster Management
Page 63 of 68
Page 64
ATTACHMENT 1
Decision Issued Under Delegated Authority
Development Applications Decided - Month Year October 2024 Approved Refused
Building Work Assessable Against the Planning Scheme 7 0
Material Change of Use 5 0
Minor Change 16 0
Operational Works 13 0
Reconfiguring a Lot 2 0
Referral Agency Response 3 0
Exemption Certificate 4 0
Other Change 0 0
TOTAL - APPLICATIONS DETERMINED UNDER DELEGATION 50 0
TOTAL - APPLICATIONS DETERMINED BY COUNCIL 3 0
Page 64 of 68
Page 65
Primary
Application ID Primary Group Full Details Stage/Decision Decision Made
Category
4 Robin Place Lake Macdonald - Dwelling House (Retaining Wall over 1.5m & Fill
DBW24/0106 NP20DBW Code Approved 2/10/2024
Extending over 3m from House)
49 Shorehaven Drive Noosaville - Dwelling House (Garage Width & Setbacks)
DBW24/0055 NP20DBW Code Approved 8/10/2024
COMBINED WITH RAP24/0016
DBW24/0091 NP20DBW Code 53 Main Street Kin Kin - Adds to Dwelling House (Carport in Local Centre Zone) Approved 10/10/2024
66 Lorikeet Drive Peregian Beach - Adds to Dwelling House (Coastal Protection) &
DBW24/0077 NP20DBW Code Driveway Width Approved 16/10/2024
COMBINED WITH RAP24/0021
DBW24/0109 NP20DBW Code 24 Manorina Lane Cootharaba - Adds to Dwelling House (Ag Land) Approved 18/10/2024
DBW24/0117 NP20DBW Code 442 Lake Cooroibah Road Cooroibah - Shed (Riparian Buffer Overlay) Approved 23/10/2024
DBW24/0126 NP20DBW Code 150 Cootharaba Downs Road Cootharaba - Adds to Dwelling (Ag Land) Approved 31/10/2024
69 Shorehaven Drive, Noosaville - Landing & Jetty
MCU24/0118 NP20MCU Code Approved 4/10/2024
COMBINED WITH OPW24/0140
33 Wyuna Drive NOOSAVILLE
MCU24/0089 NP20MCU Code Approved 10/10/2024
COMBINED APPLICATION WITH OPW24/0099
MCU24/0098 NP20MCU Code 5/6 Swanbourne Way Noosaville - Indoor Sport & Recreation Approved 15/10/2024
MCU24/0103 NP20MCU Code 42 Coral Fern Drive Cooroibah - Dwelling House (Biodiversity) Approved 24/10/2024
MCU24/0036 NP20MCU Code 178 Cooroy Mountain Road Cooroy - Dwelling House (Ag Land) Approved 30/10/2024
TPC 1441 - 3/1 Belmore Terrace Sunshine Beach - Change to DA - Convert Storeroom
51981.4258.02 NP20MCU ChangeMin Approved 2/10/2024
to Reception & Add Bedroom to Unit 3 (MULTIPLE DWELLING 18 UNITS)
16 Serenty Close NOOSA HEADS - Change to DA - Amendment to Stormwater Design
OPW22/0166.01 NP20OPW ChangeMin Approved 3/10/2024
(Drainage work, Stormwater, Earthworks, Clearing vegetation, Landscaping)
5-13 Production Street Noosaville - Change to DA (GFA, Driveways, Bio Retention
MCU23/0155.01 NP20MCU ChangeMin Approved 3/10/2024
Basin, Landscaping) Transport Depot
Page 65 of 68
Page 66
Primary
Application ID Primary Group Full Details Stage/Decision Decision Made
Category
22 Park Crescent Sunshine Beach - Change to DA - Extension to Currency Period
DBW21/0183.01 NP20DBW ChangeMin Approved 9/10/2024
(Dwelling House (Coastal Protection)
TPC 2477 - 19/67 Gibson Road Noosaville - Change to DA - Increase in Deck & Add
51992.539.02 NP20MCU ChangeMin Approved 10/10/2024
Patio unit 19 (GROUP HOUSING DEVELOPMENT (51 UNITS) STAGED)
TPC 2477 - 20/67 Gibson Road Noosaville - Change to DA - Increase in Deck & Add
51992.539.03 NP20MCU ChangeMin Approved 10/10/2024
Patio unit 20 (GROUP HOUSING DEVELOPMENT (51 UNITS) STAGED)
TPC 2477 - 21/67 Gibson Road Noosaville - Change to DA - Increase in Deck & Add
51992.539.04 NP20MCU ChangeMin Approved 10/10/2024
Patio unit 21 (GROUP HOUSING DEVELOPMENT (51 UNITS) STAGED)
36 - 40 Hofmann Drive Noosaville - Change to DA - Internal Configuration, Plant
Rooms & Front Façade Material (Commercial Business Type 1 Office, Type 2 Medical
MCU19/0017.06 NP20MCU ChangeMin Approved 11/10/2024
& Ancillary Dwelling Unit)
COMBINED WITH RAL19/0004.06
DNA 136 - 12 Leo Alley Road Noosaville - Generally in Accordance - Changes to
51989.91.01 NP20MCU ChangeMin Approved 18/10/2024
Façade & Internal Alterations (LIGHT INDUSTRY, CLOTHING MANUFACTURE)
38 Plover Street Peregian Beach - Change to DA - Add Pool (Additions to Dwelling
DBW21/0208.01 NP20DBW ChangeMin Approved 18/10/2024
House - Carport (Coastal Protect & Landslide)
2 Skyring Creek Road Federal - Change to DA - Addition of Shade Sail (Playground
DBW22/0106.01 NP20DBW ChangeMin Approved 25/10/2024
Installation - Heritage Place)
178 Eumundi Noosa Rd Noosaville - Extension to Currency Period - (Reconfiguring a
REC14/0005.04 NP20RAL ChangeMin Approved 28/10/2024
Lot - 1 Lot into 2 Lots)
178 Eumundi Noosa Rd Noosaville - Change to DA - Amend conditions to Align with
REC14/0005.05 NP20RAL ChangeMin Approved 28/10/2024
MCU22/0051 (1 Lot into 2 Lots)
TPC 2465 - 74 Mary River Road Cooroy - Change to DA - Addition of Shed (PLACE OF
51992.526.01 NP20MCU ChangeMin Approved 29/10/2024
WORSHIP)
MCU22/0097.01 NP20MCU ChangeMin 14-16 Reserve Street Pomona - Change to DA - Building Design (Food & Drink Outlet) Approved 30/10/2024
TPC 1632 - 22/30 Hastings St Noosa Heads - Change to DA - Alts & Adds to Unit 22
51983.3225.19 NP20MCU ChangeMin Approved 30/10/2024
(MULTIPLE DWELLING 25 UNITS, 8 SHOPS)
Page 66 of 68
Page 67
Primary
Application ID Primary Group Full Details Stage/Decision Decision Made
Category
OPW24/0128 NP20OPW Code 13 Mermaid Quays NOOSAVILLE - Road, Drainage, Earthworks Approved 1/10/2024
OPW24/0153 NP20OPW Code 223 Cooroy Belli Creek Road - Earthworks Approved 2/10/2024
69 Shorehaven Drive, Noosaville - Landing & Jetty
OPW24/0140 NP20OPW Code Approved 4/10/2024
COMBINED WITH MCU24/0118
OPW24/0137 NP20OPW Code 22 Key Court, Noosa Heads - Op Works - Vehicle Crossover Approved 7/10/2024
OPW24/0103 NP20OPW Code 36 & 38 Duke Street SUNSHINE BEACH - Stormwater, Drainage, Roadwork Approved 8/10/2024
65 Elanda St SUNSHINE BEACH - Roadwork, Drainage, Landscaping, Stormwater,
OPW24/0104 NP20OPW Code Approved 8/10/2024
Earthworks, Clearing Veg, Access, Car Parking, Frontage works
OPW24/0141 NP20OPW Code 23 Cloudsley Street, Noosaville - Op Works - Stormwater & Roadworks Approved 8/10/2024
33 Wyuna Drive NOOSAVILLE - Landing & Jetty
OPW24/0099 NP20OPW Code Approved 10/10/2024
COMBINED APPLICATION WITH MCU24/0089
OPW24/0102 NP20OPW Code 60 Crank St TEWANTIN - Vehicle Crossover Approved 15/10/2024
5-13 Production Street Noosaville - OpWorks - Drainage Work, Earthworks,
OPW24/0096 NP20OPW Code Approved 16/10/2024
Landscaping & Stormwater
OPW24/0110 NP20OPW Code 1 Grasstree Crt SUNRISE BEACH - Landscaping Approved 25/10/2024
OPW24/0138 NP20OPW Code 16 Rene Street, Noosaville - OpWorks - Stormwater, Carparking & Landscaping Approved 29/10/2024
OPW24/0172 NP20OPW Code 5 Adams Street, Sunshine Beach - Vehicle Crossover Approved 29/10/2024
RAL24/0005 NP20RAL Code 3 Pottery Street Pomona - Reconfiguring a Lot - 1 Lot into 4 Lots Approved 3/10/2024
218 Cooroy Belli Creek Road & 16 Palm Grove Road Cooroy - Reconfiguring a Lot -
RAL24/0008 NP20RAL Code Approved 23/10/2024
Boundary Realignment (2 Lots into 2)
Referral Agency
49 Shorehaven Drive Noosaville - Dwelling House (Garage Width & Setbacks)
RAP24/0016 NP20RAP Response - Approved 8/10/2024
COMBINED WITH DBW24/0055
Planning
Referral Agency
RAP24/0033 NP20RAP Response - 17 Ridgeway Street Sunrise Beach - Dwelling House (Site Cover & Setback) Approved 14/10/2024
Planning
Page 67 of 68
Page 68
Primary
Application ID Primary Group Full Details Stage/Decision Decision Made
Category
Referral Agency
66 Lorikeet Drive Peregian Beach - Adds to Dwelling House (Setbacks)
RAP24/0021 NP20RAP Response - Approved 16/10/2024
COMBINED WITH DBW24/0077
Planning
171 Wust Road Cooroy - Exemption from Code Assessment for Adds to Dwelling
EXE24/0038 NP20EXC Planning Approved 29/10/2024
House (Secondary Dwelling in Landslide)
22 Cooran Court Noosa Heads - Exemption from Code Assessment for Additions to
EXE24/0037 NP20EXC Planning Approved 9/10/2024
Dwelling House in Flood Overlay
21 Reserve Street Pomona - Exemption from Code Assessment for Internal Work to
EXE24/0029 NP20EXC Planning Approved 11/10/2024
SES Building
223 Cooroy Belli Creek Road Cooroy - Exemption from Code Assessment for Additions
EXE24/0036 NP20EXC Planning Approved 11/10/2024
to Dwelling in Landslide Overlay
Page 68 of 68