Skip to the record
Search everything, all in one place.

Original source · versioned page text

RFI - 20210153 Maple St SWMP

of 71

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 15, section 1. The text section number identifies this passage in the reader.

 STORMWATER QUALITY
The following sections discuss the stormwater quality considerations for the construction and
operational phase of the development.


     4.1. Construction Phase

          4.1.1 Erosion and Sediment Control Measures
During construction, it is necessary to manage stormwater run-off to avoid potential contamination
of downstream waterways from sediments and other pollutants from the site. A range of best practice
sediment and erosion controls should be implemented on the development to ensure negative
impacts to the downstream receiving environment are mitigated.

As the area being developed is below 2,500m², the development’s construction will be managed
using best practice erosion and sediment control principles in line with the desired outcomes of
Appendix 2 of the SPP (DERM, July 2017), which are shown below in Figure 4.1.




           Figure 4.1 SPP 2017 Construction Phase Stormwater Management Design Objectives

A site-specific erosion and sediment control plan shall be prepared as part of a future submission for
Operational Works approval. Suitable erosion and sediment controls for the site may include:

     1. Provision of an on-site sedimentation basin to reduce sediment concentrations from site
        discharge.


Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31                                 Page 15 of 27
Revision 1

P +61 7 5211 1003                A 75 Noosa Drive, Noosa Heads Qld 4567           E [email protected]   recorconsulting.com

Log in to download the original (RFI - 20210153 Maple St SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.