Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

RFI - 20210153 Maple St SWMP

of 71

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

The stormwater query raised during SARA referral (Ref 2301-33112 SRA) has also been
addressed within this report.

     1. To ensure compliance with PO8-PO114 of State code 1, provide an amended
        stormwater management plan, or other material, that demonstrates how stormwater will
        be managed, including any external catchments, to achieve a no material worsening
        impact onto the State-controlled road.




Project number 20210153
File RECOR Preliminary Stormwater Management Report - 20210153.docx, 2022-03-31                                 Page 6 of 27
Revision 1

P +61 7 5211 1003                A 75 Noosa Drive, Noosa Heads Qld 4567           E [email protected]   recorconsulting.com

Log in to download the original (RFI - 20210153 Maple St SWMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.