ORDINARY MEETING                                                               17 SEPTEMBER 2026


12.1        STRATEGIC OFFSET POLICY AND BIODIVERSITY OFFSET GUIDELINES


Author            Coordinator Conservation and Environment, Rachel Lyons
                  Environmental Services | Strategy and Environment
Index             41.05 - Environment and Biodiversity Policy
Attachments        1.   Attachment 1 - Strategic Offsets Policy - (Biodiversity) Final
                   2.   Attachment 2 - Noosa Biodiversity Offset Guideline Final


EXECUTIVE SUMMARY
Environmental Services has developed a Biodiversity Offsets Framework comprising a Strategic
Offsets Policy and accompanying Biodiversity Offset Guideline to provide a consistent, transparent
and best-practice approach to the assessment, management and delivery of biodiversity offsets
across the Shire. The framework responds to increasing legislative requirements, community
expectations and Council's commitment to achieving nature positive outcomes through
implementation of the Corporate Plan and Environment Strategy.

The proposed framework establishes clear principles for biodiversity offsetting, including application
of:
- the mitigation hierarchy,
- additionality,
- permanence,
- net gain outcomes, and
- the prioritisation of locally delivered offsets.

It provides governance arrangements, financial management requirements, offset delivery
mechanisms, monitoring obligations and long-term reporting requirements for both Council-
generated and third-party offsets.

The framework aligns Council's environmental stewardship objectives with Commonwealth and
State offset requirements while strengthening Council's approach to managing impacts on matters
of local environmental significance. It also creates a transparent process for assessing requests from
external agencies to utilise Council land for offset delivery and provides a mechanism for securing
long-term conservation outcomes through strategic and coordinated offset programs.

Council endorsement of the Strategic Offsets Policy and adoption of the Biodiversity Offset Guideline
will establish a clear governance framework for future offset proposals and provide certainty for
Council projects and third-party proponents seeking to deliver biodiversity offsets within Noosa Shire.

RECOMMENDATION
That Council
A. Note the report by the Coordinator Conservation and Environment to the Ordinary Meeting dated
   17 September 2026 regarding Strategic Offsets Policy and Biodiversity Offset Guideline; and
B. Adopt the Strategic Offsets Policy as provided in Attachment 1; and
C. Authorise the CEO to make minor administrative and editorial amendments to the Strategic
   Offsets Policy and Biodiversity Offset Guideline that do not alter the intent of the documents; and
D. Request the CEO to report back in 12 months with a quantification of scale and cost for the
   inclusion of voluntary Matters of Local Environmental Significance offsets as noted in the report.
Log in to download the original file

Report.pdf · 146 KB (small file)

Full text of the other 10 pages

Page 2

ORDINARY MEETING                                                             17 SEPTEMBER 2026



REPORT
Developments and maintenance upgrade projects may sometimes have an impact to the
environment that may include vegetation removal, impact to threatened species habitat, impact to
marine or protected plants, or impacts to fish and aquatic passage.

Over the last two decades, legislation has been developed by State and Commonwealth
Governments that required offsets to be identified and delivered for impacts against matters of State
or Commonwealth significance. This includes:
•   Matters of National Significance listed under the Environment Protection and Biodiversity
    Conservation Act 1999 (C’wealth) – including but not limited to World Heritage Sites, Threatened
    Ecological Communities, and listed plants and animals.
•   Prescribed environmental matters under the State’s Environmental Offsets Regulation 2014
    (Qld) and related legislation, including but not limited to some listed animals and plants under
    the Nature Conservation Act 1992, prescribed regional ecosystem under the Vegetation
    Management Act 1999, section 8(b) and fish habitat area declared under the Fisheries Act 1994.
Noosa Council has developed a Biodiversity Offsets Framework comprising a Strategic Offsets
Policy and an accompanying Biodiversity Offset Guideline. Together, these documents establish a
consistent, best-practice approach to managing and addressing unavoidable impacts on biodiversity
and biodiversity offsets arising from Council operations, infrastructure delivery, and third-party
development.

The framework is grounded in the Noosa Corporate Plan and Environment Strategy, which set a
clear direction for achieving nature-positive outcomes, strengthening ecological resilience, and
supporting a low-carbon future. Council’s Environment Strategy 2019 includes targets for which
offsets are an important mechanism for achieving biodiversity and water quality outcomes:
•   By 2030 there is no net loss of ecosystem values across the shire;
•   By 2030 half of all land in Noosa Shire is managed for its environmental values;
•   By 2030 populations of key threatened indicator species remain viable;
•   By 2030 the Noosa River and Mary River catchments achieve an A rating for their environmental
    health.
Biodiversity offsets are recognised as an important tool within this broader environmental agenda,
particularly where impacts cannot be avoided or sufficiently mitigated.

The development of strong policy and guidelines reflects both local priorities and increasing global
scrutiny of offsetting practices, with a strong emphasis on ensuring offsets are credible, measurable
and deliver genuine conservation outcomes over time.

The development of the Draft Offsets Policy and Biodiversity Offsets Guideline is also a resolution
of a prior Ordinary Meeting – 15th September 2022 – Item 4, Pg 8 to: Bring forward a report on
Council’s Environment Offset Policy and associated guideline, after initial consultation has
concluded.

ISSUE
Biodiversity offsets are already required under a range of Commonwealth and State legislative
frameworks and are increasingly associated with Council infrastructure projects and third-party
development proposals. While Council currently is involved in biodiversity offset arrangements
where required, there is no overarching policy or governance framework that establishes consistent
principles, decision-making criteria and delivery expectations for offset proposals.

In the absence of a formal framework, offset opportunities have historically been considered on a

Page 3

ORDINARY MEETING                                                                  17 SEPTEMBER 2026


case-by-case basis, resulting in an ad hoc approach to assessment, negotiation and implementation.
While this approach has enabled Council to respond to individual proposals, it does not provide clear
or transparent guidance on how offsets should align with Council's broader environmental objectives,
nor does it ensure consistent outcomes for the community.

The proposed Framework establishes a transparent and consistent approach to offset management
across the organisation. It provides clear principles for decision-making, defines governance and
accountability arrangements, and ensures biodiversity offsets contribute to broader strategic
outcomes, including Council's commitment to achieving no net loss of ecosystem values and
improving ecological resilience across the Shire.

There is significant benefit of getting this policy in place promptly as there are several current projects
and proposed offsets and requests from 3rd party agencies (e.g. Beckmans Road Offsets with the
Department of Transport and Main Roads), to use Council sites for offsets. We need a clear
framework and policy for these.

SUMMARY OF PROPOSED INCLUSIONS
The Strategic Offsets Policy establishes overarching principles to guide all offset activities. Central
to this is the application of the mitigation hierarchy, ensuring that impacts are first avoided, then
minimised, and only offset as a last resort. The policy also embeds key concepts such as
additionality, permanence and a requirement to achieve net gain outcomes, ensuring that offsets
contribute to measurable improvements in biodiversity rather than simply compensating for loss.

The Biodiversity Offset Guideline provides the operational framework for implementing the policy. It
outlines when offsets are required, how they are assessed, and the mechanisms through which they
can be delivered, including Council-led offsets and those undertaken in partnership with third parties.
It further establishes requirements for offset delivery plans, financial arrangements, monitoring and
reporting.

The framework applies broadly to impacts on Matters of National and State Environmental
Significance, ensuring alignment with Commonwealth and State legislation while strengthening
Council’s approach to local environmental values.

Collectively, the policy and guideline promote a shift from ad hoc offset management to a
coordinated, programmatic approach that prioritises long-term ecological outcomes, local delivery
where possible, and integration with broader conservation strategies.


POTENTIAL COMMUNITY IMPACTS / BENEFITS
The Framework has been developed to ensure that Offsets are delivered in a strategic, coordinated
and ecologically effective way within Noosa Shire.

The proposed Biodiversity Offsets Framework is expected to have a generally positive impact on the
Noosa community by ensuring biodiversity offset delivery is directed toward environmental outcomes
within the Shire wherever practicable. This approach supports the protection and enhancement of
local biodiversity values, contributes to the achievement of Council's environmental objectives, and
helps maintain the natural assets that underpin Noosa's lifestyle, visitor economy and community
wellbeing.

A key community benefit is the retention of offset funding within the local government area during
the time when the impact is actually made. Where offsets are delivered locally, investment can
support habitat restoration, revegetation works, conservation land management, ecological
monitoring and other environmental improvement projects. This in turn will provide opportunities for
local employment and support environmental contractors, consultants and community conservation
initiatives.

Page 4

ORDINARY MEETING                                                             17 SEPTEMBER 2026


The framework also provides greater transparency and alignment in how biodiversity offsets are
developed, approved (by State and Commonwealth) and managed by Council. This is expected to
improve community confidence that unavoidable environmental impacts are being addressed
through a clear governance framework that prioritises avoidance and mitigation before offsetting is
considered.


Overall, the Biodiversity Offsets Framework is expected to deliver a net positive community outcome
by keeping and delivering biodiversity offset investment within Noosa where Council has generated
the offset, supporting local conservation outcomes, and providing a transparent and accountable
framework for managing unavoidable environmental impacts, while recognising there may be some
costs and community concerns associated with the implementation of biodiversity offset programs.

Below is a summary table of key benefits and challenges:
Potential Benefits (Pros)                        Comment
Greater retention of funding and                 The policy prioritises delivery of offsets locally,
environmental investment within Noosa            meaning offset funding can be directed into
Shire.                                           habitat restoration, environmental management
                                                 and conservation projects within Noosa rather
                                                 than outside the local government area.
Retention and enhancement of biodiversity        Local delivery ensures offset outcomes directly
values within the shire.                         contribute to Noosa's biodiversity, ecological
                                                 connectivity and environmental resilience rather
                                                 than benefiting other regions.
Supports Council's Environment Strategy          Includes no net loss of ecosystem values,
targets.                                         improved habitat connectivity and protection of
                                                 threatened species.
Creates local employment opportunities.          Retention of Council’s funds in the Shire and the
                                                 attraction of third party offset funding into the
                                                 Shire for restoration, revegetation, ecological
                                                 monitoring, bush regeneration and environmental
                                                 consulting work is likely to support local
                                                 contractors and environmental service providers.
Provides a transparent and consistent            Council Departments, Project Officers,
decision-making framework.                       Community members and stakeholders can
                                                 better understand how offset decisions are made
                                                 within Council and how funds are managed.
Increases Council's ability to attract third-    State agencies and approved proponents may
party offset investment.                         invest in local conservation projects through
                                                 Council-managed offset sites due to clear and
                                                 consistent policy.
Supports future conservation land                Land-use compensation payments associated
acquisition.                                     with third-party offsets may contribute to
                                                 acquisition and protection of strategically
                                                 important conservation land.
Strengthens Noosa's reputation as an             The framework reflects emerging best practice
environmental leader.                            and demonstrates a commitment to measurable
                                                 biodiversity outcomes and nature-positive
                                                 principles.

Page 5

ORDINARY MEETING                                                              17 SEPTEMBER 2026


Potential Challenges (Cons)                       Comment
Potential variance in Offset costs compared       While costs are expected to be broadly
to State calculated Financial Contributions       comparable, some projects may incur additional
Offsetting options.                               or reduced costs comparable to the State Offset
                                                  Cost Calculator. This will depend on site
                                                  conditions, the availability of land and the offset
                                                  requirements. The draft Policy addresses any
                                                  untenable cost variances through extenuating
                                                  circumstance exemptions that may allow for the
                                                  use of State Financial Contributions Offsetting
                                                  option, enabling the offset funds to be made and
                                                  delivered outside the shire by the State instead
                                                  of Council.
Requirements for consideration                    Where offsets are required, additional planning,
in infrastructure budgets.                        monitoring and management costs must be
                                                  incorporated into project budgets from the outset.
                                                  This requirement already exists.
                                                  What this framework requires is that
                                                  Environment Services as the delivery agent for
                                                  Offsets within Council, to be involved during
                                                  project design to ensure that offset requirements
                                                  produce the highest environmental outcomes,
                                                  are delivered in the best location and that
                                                  Offsetting does not hold the delivery of capital
                                                  works projects up.
Land availability constraints.                    Suitable offset receiving sites within Noosa may
                                                  become increasingly limited over time, creating
                                                  challenges for future offset delivery. The draft
                                                  Policy addresses this through assessment of
                                                  extenuating circumstances that may cause an
                                                  offset to be delivered outside the shire.
Potential perception that offsetting              Some community members may oppose offsets
legitimises environmental impacts.                on principle and prefer all impacts be avoided,
                                                  regardless of offset outcomes. This is a common
                                                  concern associated with offset programs.
                                                  Offsets will continue to be legislatively required
                                                  of Council projects and this Framework will
                                                  provide greater confidence in their careful and
                                                  considered delivery.
Time lag between impact and ecological            While impacts occur immediately, newly
benefit.                                          established offset sites may take years to deliver
                                                  equivalent habitat values. This is an inherent
                                                  characteristic with biodiversity offsets globally.
                                                  As such it is imperative that ES is involved in
                                                  Offset design to enable the best investment with
                                                  quickest and most effective outcomes is selected
                                                  and developed.
Additional administrative responsibilities for Ongoing monitoring, reporting, governance and
Council.                                       management of offset sites will require staff
                                               resources and oversight. Our Framework
                                               proposes that these costs are factored into the
                                               project budget that generates the offset initially,
                                               or is factored into the contract costs for Third

Page 6

ORDINARY MEETING                                                             17 SEPTEMBER 2026


                                                  Party offsets delivered on Council land. As such
                                                  the administration burden is low.
Long-term land commitments.                       The lands included for Offsetting will be wholly
                                                  encompassed within Council’s reserve network,
                                                  land specifically acquired and deemed highest
                                                  use for offsets and/or land within Protected
                                                  tenure such as Nature Refuges and Voluntary
                                                  Conservation Agreement areas.
Delivery risk.                                    As with any ecological restoration program, there
                                                  is a risk some offset sites may not initially
                                                  perform as expected and require adaptive
                                                  management or additional investment. As noted
                                                  above, this is an inherent risk regardless of
                                                  where/how the offsets are being delivered. The
                                                  risks are lower when specialist ecological advice
                                                  provided by the ES team is considered early in
                                                  Offset design and site selection.

POLICY NEED WITHIN AN EXISTING COMPLIANCE FRAMEWORK
Biodiversity offsets are already required under a range of Commonwealth and State legislative
frameworks and are increasingly associated with Council infrastructure projects and third-party
development proposals. While Council currently is involved in biodiversity offset arrangements
where required, there is no overarching policy or governance framework that establishes consistent
principles, decision-making criteria and delivery expectations for offset proposals.

In the absence of a formal framework, offset opportunities have historically been considered on a
case-by-case basis, resulting in an ad hoc approach to assessment, negotiation and implementation.
While this approach has enabled Council to respond to individual proposals, it does not provide clear
guidance on how offsets should align with Council's broader environmental objectives, nor does it
ensure consistent outcomes for the community.
The proposed Biodiversity Offsets Framework establishes a transparent and consistent approach to
offset management across the organisation. It provides clear principles for decision-making, defines
governance and accountability arrangements, and ensures biodiversity offsets contribute to broader
strategic outcomes, including Council's commitment to achieving no net loss of ecosystem values
and improving ecological resilience across the Shire.

Importantly, the framework creates an opportunity to maximise community benefit from offset
investments. Without a policy, offset funding and environmental investment may be directed outside
the Shire or toward isolated projects that do not contribute to broader conservation priorities. The
proposed framework provides a mechanism to strategically direct offset investment toward locally
identified environmental priorities, helping retain environmental, economic and community benefits
within Noosa wherever practicable.

The framework also reduces legal, financial and reputational risks by ensuring offsets are managed
consistently, transparently and in accordance with contemporary best practice. This provides greater
certainty for Council, the community, and external agencies seeking to partner with Council in the
delivery of biodiversity offsets.

INCLUSION STATEMENT
The Biodiversity Offsets Framework applies to biodiversity offset requirements generated by Noosa
Council activities and to offset proposals from third-party agencies seeking to deliver biodiversity
offsets within Noosa Shire. This includes agencies undertaking projects within the Shire that
generate offset obligations, as well as agencies undertaking projects outside Noosa that are seeking
to compensate for biodiversity impacts through offset delivery within the Shire

Page 7

ORDINARY MEETING                                                                17 SEPTEMBER 2026



The framework applies to biodiversity offset requirements arising under existing Commonwealth and
State legislation where a project results in a significant residual impact on biodiversity values. The
specific triggers, exemptions and assessment thresholds are established through the relevant
legislative frameworks and associated policies and are therefore not reproduced in detail within this
report.

These legislative requirements principally relate to impacts on Matters of National Environmental
Significance (MNES) protected under the Environment Protection and Biodiversity Conservation Act
1999 and Matters of State Environmental Significance (MSES) protected under Queensland
legislation, including the Environmental Offsets Act 2014, Nature Conservation Act 1992 and
associated regulatory frameworks.

The framework does not currently apply to Matters of Local Environmental Significance (MLES).
While these values are recognised through Council's planning framework and are important
contributors to the environmental health and ecological connectivity of the Shire, there is currently
no legislative requirement for Council to offset impacts to these values.

The draft policy and guideline do, however, recognise the potential future application of voluntary
offsetting for some locally significant biodiversity impacts. This would enable Council to consider a
broader "no net loss" approach for environmental values that are not currently captured by State or
Commonwealth offset legislation. Examples may include vegetation clearing associated with road
upgrades, infrastructure projects within existing corridors, or impacts to locally significant vegetation
communities and habitat values that do not trigger legislative offset requirements. Any future
expansion of the policy to include voluntary offsetting of MLES would be subject to further Council
consideration, including assessment of financial and operational implications.



Link to Corporate Plan
Theme No 1 - Environment
Objective 1.1 - Maintain and improve water quality and the health of waterways, wetlands, and
catchments.
Objective 1.5 - Deliver expanded vegetation networks, rehabilitation and habitat across the Shire
and advocate to the state and federal governments to assist funding environmental action.
Objective 1.6 - Partner with community to improve the health and water quality management of
Noosa and Mary Rivers and coastal areas through whole of catchment management to protect
environmental values while enabling sustainable public access, recreation, and commercial use.
Objective 1.7 - Deliver and partner with State and Federal Governments to protect threatened and
vulnerable species identified in the Environment Strategy

Key Actions:
• Delivery of annual Capital Infrastructure Program.

Performance Measure:
• There is no net loss of ecosystem values across the shire and the condition of Council’s priority
bushland reserves are enhanced.




Previous Council Consideration
Planning & Environment Committee Meeting Minutes 6 September 2022
TRANSPORT AND MAIN ROADS ENVIRONMENTAL OFFSETS
Committee Recommendation
Moved: Cr Stockwell

Page 8

ORDINARY MEETING                                                                 17 SEPTEMBER 2026


Seconded: Cr Stewart
That Council note the report by the Acting Principal Environment Officer to the Planning &
Environment Committee Meeting dated 6 September 2022 and request the Chief Executive Officer:
A. Continue negotiations with Transport and Main Roads Department about opportunities for use of
suitable land as environmental offset receiving sites and update Council on the outcomes; and
B. Bring forward a report on Council’s Environment Offset Policy and associated guideline, after
initial consultation has concluded.
Carried unanimously.


Finance
Implementation of the framework requires the allocation and management of resources to support
offset delivery over the full lifecycle of projects. This includes planning, establishment, monitoring,
maintenance and long-term management costs. Much of this is incorporated into existing roles.

For Council projects, these costs are incorporated into project budgets at the design stage. For third-
party projects, financial contributions will be secured through agreements and quarantined to ensure
funds are available to deliver the required conservation outcomes.

The costs required for biodiversity offsetting are already required to be included in council project
budgets and no additional resource will be required with the adoption of this policy.

The framework also enables the collection of land-use compensation payments from third parties
where there is a costs associated with Council land being used as an offset receiving site, this cost
is paid by the third party, this contribution can further support future land acquisition and conservation
initiatives.

Inclusion of Additional Council Biodiversity Offsetting
An initial request sought to consider including relevant Council projects involving vegetation clearing,
that are currently exempt from State or Commonwealth legislation, in the Strategic Offsets Policy
and Guideline.
The matter was discussed at the Executive Leadership Team meeting on 17th June 2026, where it
was recommended that inclusion be deferred until the associated costs and implications are better
understood. As no register of these impacts currently exists, the potential cost to Council remains
uncertain.


Risk & Opportunities
The adoption of the Biodiversity Offsets Framework presents a balanced risk profile. On one hand,
it significantly reduces legal, financial and reputational risks by providing a transparent, consistent
and well-governed approach to offsetting. On the other hand, there remain some inherent risks
associated with biodiversity offsets, particularly the potential for delayed ecological outcomes and
the possibility that offsets may not fully replicate impacted values.
These risks are mitigated through strong governance mechanisms, including rigorous planning
requirements, long-term monitoring, adaptive management and the use of advanced offsets to
reduce time lags between impact and ecological benefit. Financial risks are further reduced through
secured and quarantined funding arrangements.
There is also some reputational risk associated with community perceptions of offsetting; however,
this is addressed through the framework’s emphasis on transparency, accountability and a clear
commitment to achieving a net gain in biodiversity outcomes.

The risk assessment below indicates residual risk for the adoption of the Biodiversity Offsets
Framework:

Page 9

ORDINARY MEETING                                                             17 SEPTEMBER 2026


   Risk Category              Risk              Consequence              Control        Residual
                                                                                          Risk
Health and Safety   Limited direct risk       Minimal Direct       Standard           Low
                                              Impact               operational
                                                                   procedures
Legal and           Non-compliance with Incomplete offset Alignment with              Low
Compliance          State/Commonwealth delivery -            legislative
                    offset requirements Regulatory           frameworks and
                                        penalties or project formal
                                        delays               agreements
                                                                   Inclusion of
                                                                   extenuating
                                              Impacts ability to
                                                                   circumstances
                    Land availability         deliver legally
                                                                   clause that          Low
                    constraints               required offsets
                                                                   provides for offset
                                              within the shire
                                                                   delivery outside the
                                                                   shire
Environment         Offsets fail to deliver   Net loss of         Strong policy       Low
                    genuine biodiversity      biodiversity values principles,
                    outcomes                                      monitoring, and
                                                                  adaptive
                                                                  management
                    Time lag between          Delayed ecological Advanced offsets     Low
                    impact and offset         benefit            and long-term
                    maturity                                     management
                                                                 commitments
Cyber Security      Nil                       Nil                  N/a                Low
Financial           Insufficient funding for Incomplete offset     Quarantined        Low
Management          long-term management delivery                  funding and whole-
                                                                   of-life costing
                                                                   developed prior to
                                                                   acceptance with
                                                                   contingencies
                                                                   considered.


Reputation/Public   Perception that offsets Community              Clear mitigation   Medium
Trust               legitimise              concern and            hierarchy and
                    environmental harm      reduced trust          transparent
                                                                   reporting
                    Poor performance of       Loss of confidence Utilising strong     Low
                    offsets                   in Council         expertise in project
                                              environmental      development and
                                              leadership         management.
                                                                 Monitoring,
                                                                 reporting and
                                                                 governance
                                                                 oversight.
                    Inconsistent application Stakeholder           Standardised       Low
                    of offsets               dissatisfaction       framework and
                                                                   processes

Page 10

ORDINARY MEETING                                                                        17 SEPTEMBER 2026


People and Culture Internal capability gaps Implementation                  Defined roles and Low
                                            challenges                      responsibilities,
                                                                            governance
                                                                            structure. Existing
                                                                            Position and
                                                                            Project
                                                                            Management costs
                                                                            built into Project
                                                                            Costs or Third-
                                                                            Party funding
                                                                            agreements.
Assets                      Long-term land         Reduced              Strategic land-use Low
                            commitment for offsets alternative land use planning and
                                                   options              compensation
                                                                        mechanisms. Offset
                                                                        placement in
                                                                        appropriate areas.
Service Delivery            Increased project         Delays to             Early planning and Low
                            complexity                infrastructure        integration into
                                                      delivery              project design
Economy                     Increased cost of         Potential impacts Clear processes               Low
                            development               on project feasibility and shared
                                                                             responsibility with
                                                                             proponents




Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.



Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
Departments consulted:
      Office of the CEO, Mayor &             Community Services                    Corporate Services
              Councillors
  x    Mayor & Councillors             x   Director                         x    Director
  x    Chief Executive Officer             Community Connection                  Financial Services
       Executive Officers                  Sport & Active Lifestyles             Revenue Services
       Community Engagement                Arts & Culture                        ICT
  x    Governance                          Customer Experience                   Procurement

Page 11

ORDINARY MEETING                                                                17 SEPTEMBER 2026


                                                                        People & Culture
     Strategy & Environment              Development & Regulation       Infrastructure Services
 x   Director                        x   Director                   x   Director
 x   Strategy & Sustainability       x   Development Assessment     x   Civil and Asset operations
     Economic Development        &                                      Infrastructure Planning, Design
                                         Local Laws                 x
     Destination Management                                             and Delivery
 x   Environmental Services              Environmental Health       x   Waste
     Innovation & Digital Hub            Building & Plumbing            Building & Facilities
     Commercial Property             x   Property / Permits             Disaster Management

                                                                        Fleet

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.