Council archive · source document
Development Application Part 2 of 3 Report MCU13/0106
Very large file (27.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
SCC CORRESPONDENCE
Place Barcode here 1111111111111111111111111
80676573
THIS IS THE FIRST PART OF A~
MULTIPLE PART RECORD
Ccekllst \ Part -
~f 3 -
(Please Circle)
Application number: nL0, \ 2:./ (’)lolo
T U&AM\BCS IAM\INFORMATION MANAGEMENTlRECORDS MANAGEMEN1\Control of
RecordslEDRMS\Multi Pan Record Co,’cr Sheet FIRST PART.do
Gox: ,Q?.(({(.) 0:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 53 pages
Page 2
Town Planning Report for Development Application
.--
Development Permit for Material Change of Use for "Detac ed ge\8Ie
-
nmen t C
J...
ounter
Andrew and Jennifer Aitken
1 Z JUN 2013
Lot 9 on MCH5387 -18 Tropicana Rise, Castaways Beach
Tew~ntin
1. Overview
Proposed Development: Establish a detached house on vacant land
Type of Approval Sought: Development Permit Material Change of Use for "Detached House"
-
Real Property Description: Lot 9 on MCH5387
Address: 18 Tropicana Rise, Castaways Beach
Site Area: 718 sq m
Plannin Scheme: The Noosa Plan
Locali : Eastern Beaches
Zone: Dejached Housing Zone
Overla s: Natural Hazards Overlay Code Slope, Bushfire Hazard, Eastern Beaches
-
Level of Assessment: Code Assessment
Applicable Codes: Dwelling House Code
Natural Hazards Overla Code
I State Planning Instruments: I South East Queensland Regional Plan
2. Development Summary
The proposed development is to construct a detached house on vacant land at 18 Tropicana Rise, Castaways
Beach to meet the requirements of the Noosa Plan and associated Noosa planning requirement overlays.
3. Proposal
The proposed development is a two storey dwelling on a vacant lot within a residential area.
The materials and finish of the development, including barrier fencing and garage, are consistent with dwellings
in the area and contribute to the beach character of the locality. Further, landscaping is provided on-site to
contribute to streetscape and residential amenity.
The location and setting of the house, including boundary setbacks, are adequate to ensure an appropriate level
of privacy of the subject site and adjoining land owners.
The maximum height above natural ground level of 7.9m, ensures the dwelling is consistent with the locality and
is not visually intrusive. Refer to Section Photos which show photos of houses in the locality, consistent with
...
the proposal in attachment ... .
Page 3
2
The detached dwelling will be designed and located on the subject site to minimise risk of landslide, consistent
with reporting prepared by a qualified Geotechnical Engineer (Refer to Attachment ...).
One(1) garage is proposed to accommodate two vehicles, adequate for the use.
4. Site Details
The subject site is located at the northern end of Tropicana Rise.
The subject site:
is vacant;
has an area 718 sq m;
has 16.5 m frontage to Tropicana Rise (west);and
is cleared of vegetation;
slopes down from Tropicana Rise towards David Low Way
The site slopes down from Tropicana Rise.
Adjoining the subject site is vacant land (north)and a detached dwelling (south). East of the subject site is David
Low Way. Tropicana Rise and the surrounding locality is characterised by detached houses, as shown in Figure
2 below.
Figure 1 -
Aerial Image of the Subject Site and adjoining land
Subject Site
,
.. I
-..’
..,t,
’
J!/
~ Ili"
(Al..
.
r~.
I
Page 4
3
Figure 2 Aerial image of the subject site and surrounding area
-
~J
’\tS
’:,’~"-/~\-
,
,
~.
,
_",
,
’’’;.
,
~", \ I
fT’
(f1~J’;_P I.
;1
t,
’"
r
1"
~
:
,
The following images show other houses built on Tropicana Rise in close proximity to the proposed development
site,
e
r-l
_#
Page 5
4
I 1
,
5. Planning Assessment: Planning Scheme
5.1 Detached House Code
Refer to Attachment A for a detailed assessment against the Detached House Code to demonstrate the proposal
meets all relevant provisions.
5.2 Natural Hazards Overlay Code
Refer to Attachment B for a detailed assessment against the Natural Hazards Overlay Code to demonstrate the
proposal meets all relevant provisions.
Page 6
5
AnACHMENTS attached below are:
ATTACHMENT A Assessment Against Detached House Code
-
ATTACHMENT B Assessment Against Natural Hazards Overlay Code
-
ATTACHMENT C -
Geotechnical Report
ATTACHMENT D -
Architectural Drawings
Page 7
6
Attachment A -
Assessment Against Detached House Code
14.51.2 The overall outcomes sought by the Detached House Code are to ensure that detached houses-
a) only occur on land that is suited for the intended form ofdevelopment and the occupation and use of the building and site by the residents.
b) are only developed on land which is not located in the vicinity of land uses-
which would adversely impact the occupation and use of buildings and the site by the residents; or
ii which would result in the residential development preventing or inhibiting the conduct of existing land uses.
c) are attractive and consistent with the developed character of the particular neighbourhood;
d) retain the natural landscape character and visual quality of hill slopes and ridgelines;
e) offer high levels of amenity, safety and security for the occupants;
Q have an adequate supply of water;
g) where not in a sewerage service area, effluent disposal systems are designed and sited to minimise adverse effects on the environment; and
h) avoid adverse impacts on environmental values including environmentally sensitive areas
The proposed detached dwelling achieves the overall outcomes sought by the Detached House Code in that:
the subject site is located within the Detached Housing Zone which is intended for the proposed use;
the subject site is located in an established residential area and will not adversely impact on any adjoining sites;
the proposed dwelling is consistent with the character of the locality;
the visual quality of the site will be maintained;
will be located and designed to minimise any risk of landslide;
the site will be connected to Council’s reticulated water supply and effluent disposal system in accordance with relevant standards; and
the development will not have any adverse impacts on environmental values.
Specific Outcomes Probable Solutions Assessment Compliance
14.54 Siting & Effects of Development
Setbacks S1.1 The minimum setback of the Detached The proposed building setbacks are: 01
01 Build ngs and other structures are appropriately house or dwellng unft and associated buildings and -
1.5 m from southern side boundary (single
des gned and sfted to- structures from boundaries is not less than the minimum storey section) and 2.8 m (double storey
a) prov de amenity for users of the prem ses as well specified in Schedule 1. section)
as preserve the v sual and acoust c privacy of -
2.4 m from northern side boundary;
adjo n ng and nearby land uses; Alternative provision to QDe Parts MP1.1 - 10.0 m from rear boundary; and
b) preserve any ex st ng vegetat on that will buffer and MP1.2, A1, A2 and A7 -
6.0 m from Tropicana Rise frontage (detached
the proposed bu d ng from adjo n ng uses; house)
Page 8
7
c) allow for landscaping to be provided between Schedule 1 Table 1-1-Standard minimum setbacks for
- - 6.5 m 4.1 m from Tropicana Rise Frontage
-
buildings; Zones (proposed garage).
d) maintain the visual continuity and pattem of Zone Minimum Setback
buildings and landscape elements within the Detached Housing Zone Frontage-6m The building setbacks of the detached house accord
street; Ofher boundaries- with S1.1 (confirm with reference to schedule 1 -
e) for class 10a structures, do not visually dominate a) 1.5m setback up to 4.5m table 1-1).
the street; height;
Q avoid any significant adverse impacts on the b) 2m setback between The setback of the northwest comer garage from the
natural values of waterways and their foreshores, 4.5m 7.5m height; and
-
Tropicana Rise frontage is less than the 6m
including those of the Noosa River and its lakes; c) 2m plus 0.5m for every requirement of S1.1, Schedule 1 Table 1-1. Due to
-
and 3m or part thereof above the angle of the Tropicana Rise frontage the setback
g) do not interrupt the natural cycles of erosion and 7.5mheight. of the garage ranges from 6.5 m to 4.1 m from the
accretion of waterways and foreshore areas. front boundary.
It is considered the proposed development achieves
Specific Outcome 01,despite the reduced setback of
the garage (01astructure), in that:
-
the garage (01a structure) will not visually
dominate the street;
-
the reduced boundary setback will not adversely
impact visual privacy of adjoining uses;
-
the reduced boundary setback is consistent with
existing building setbacks on Tropicana Rise, as
shown in Section 3 of this report. It follows, the
proposed detached dwelling and garage (01a
structure) maintains the visual continuity and
pattem of the buildings within the street.
Flooding, drainage and earthworks16
02 relates to flood and therefore is not S2.1 2.3 relate to flood and are therefore not applicable
- Not applicable. The subject site is not affected by NA
applicable to the proposed development to the proposed development flood.
03 Finished surface levels ensure land is free S3.1 No solution provided The finished surface levels slope down eastwards 03
draining. with free draining.
Advisory note
Council encourages building methods that avoid the use of fill
such as suspended floor construction and stepping down
slopes rather than cutting and filling.
Page 9
8
04 Filling or excavation does not adversely affect 54.1 Fill material placed over services does not impose any Sewer and water utility infrastructure is not located
sewer, stormwater or water utility infrastructure. additional surcharge loading on the service. within the subject site (confirm this is true). It follows,
filling or excavation will not adversely affect sewer,
54.2 Where excavation is carried out storrnwater or water utility infrastructure.
a) a minimum cover of 600mm is maintained around all
utility infrastructure (to top, sides and base of services);
or
b) a retaining wall is provided to support the soil
surrounding the service;
AND
54.3 Compaction with a vibrating roller is not carried out
within 600mm of any utility infrastructure.
05Development does not adversely impact S5.1 Buildings or other structures within the Not applicable. The subject site is not located within NA
on the Lake Macdonald water supply. Lake Macdonald catchment (indicated on Figure the Lake Macdonald Catchment.
14.7) are located above the 98.5m AHD level.
Electricity supply infrastructure
06 Uses and works maintain adequate safe
an S6.1 Buildings and structures (including swimming pools, The proposed buildings and structures are not 56.1
distance from electrical infrastructure
including sheds, tennis courts or outbuildings) are not constructed located under overhead electricity transmission lines.
substations, overhead powertines, power poles and under overhead electricity transmission lines, or wfthin
transfonners. electricfty easements. The subject site does not contain, and is not located
nearby any electricity easements.
Steep Slopes and Landslide hazard areas
07 Detached houses, Ancillary dwelling units, S7.1 If on premises iden ed as a Landslide Hazard Area on Refer to Attachment C for a geotechnical report, S7.2 and 7.3
Multiple housing Type 1 and associated uses are Overtay Maps OM1.3-9.3, or on steep slopes the use does prepared by Morrison Geotech which identifies the
sfted or constructed to maintain the safety of people not- site slippage risk and recommendations to mitigate
and properly from the risk oflandslide. a) involve the removal of vegetation other than grass from soil slippage during and after construction.
use areas; or
b) involveexcavating or filling of more than 50m3 of The recommendations in the geotechnical report will
material (other than placement of topsoil not exceeding be implemented.
100mm in depth relative to natural ground level; or
c) involve cut or fill with a depth of more than 2m relative to
natural ground level; or
d) redirect or impede water flows in an existing watercourse
or stormwater drain; or
e) involve construction of an on-site effluent disposal
Page 10
9
system;
OR
S7.2 A site specific goo-technical report prepared by a
registered professional engineer either-
a) certifies that the site is not at risk from landslide
emanating from the site or from other land; or
b) identifies methods of stabilising all buildings,
accessways and use areas;
AND
S7.3 If the geo-technical report identifies methods of
stabilising buildings, accessways and use areas, those
methods are implemented.
Height S8.1 The maximum building height in metres and storeys The subject site is located in the Eastern Beaches S8.1(e)
08 Buildings and other structures- is- Locality Detached Housing Zone.
-
a) are low rise and present a building height a) if in the Visitor Mixed Use Zone 12m (butnot exceeding
-
consistent with structures on adjoining and 3storeys); or The detached house meets S8.1 in that the maximum
surrounding land; b) ifin the Noosa Heads Locality, Attached Housing Zone -
height above natural ground level is 7.9 m and it is
b) have a maximum building height of- i) Lot 4 on SP 100064 in Serenity Close Noosa Heads two storeys.
I) for Visitor Mixed Use Zone- 3storeys; or -
15m (butnot exceeding 4 storeys);
ii) if in the Noosa Heads Locality Attached ii) Otherwise 12m (butnot exceeding 3storeys);
-
Housing Zone- c) if in the Noosaville Locality and the Attached Housing
-
Lot 4 on SP10OO64 in Serenity Close Zone and with frontage to the following streets: Russell
-
Noosa Heads- 4 storeys Sf, William Sf and Howard Sf, or Weyba Rd, James Sf
-
Otherwise- 3storeys and Albert Sf north of their intersections with Elizabeth Sf
iii) if in the Noosaville Locality and the Attached (as well as properties fronting Gympie Terrace or Noosa
Housing Zone with frontage to the following Parade between Weyba Road andRussell Street)-12m
streets: Russell Sf, William Sf and Howard
-
(butnot exceeding 3storeys);
St, or Weyba Rd, James Sf and Albert Sf d) if in the Rural Zone or Rural Settlement Zone 8m or 9m
-
north of their intersections with Elizabeth St where the pitched roof, but no other part of the building or
(as well asproperties fronting Gympie structure, exceeds 8m (butnot exceeding 2storeys either
Terrace or Noosa Parade between Weyba way); or
Road and Russell Street)- 3storeys; e) otherwise -8m (butnot exceeding 2storeys).
iv) otherwise- 2storeys;
c) do not visually dominate the street, surrounding
Page 11
10
spaces or the existing skyline;
d) preserve the amenity of surrounding land
including privacy, views and access to sunlight;
e) respect the scale ofsurrounding vegetation; and
~ respond to the topography of the site by stepping
down the slope or sitting above the ground level
on stumps, for sloping sites.
Site cover
09 The site cover of buildings and other roofed S9.1 Wrlh the exception ofAncillary Dwelling Units and The site cover of the proposed detached dwelling is:
structures- Multiple housing Type 1, the s e cover of class 1 and class -
14 % for the lower level; and
a) is of a scale that is compatible with surrounding 10 buildings or structure does not exceed- -
32 %for the upper level.
development; a) for a single storey building 50%;or
-
OR
b) does not present an appearance of bulk to b) for a building of 2 or more storeys 50% on the ground
-
adjacent properties, roads or other areas in the floor and 30% for the upper storey(s), or 40% for all - 32 %for all storeys
vicinity ofthe site; storeys;
c) maximises the retention of existing vegetation The proposed development meets S9.1.
and allows for soft landscaping between Altemative provision to QDC Parts MP1.1 and MP1.2,A3
buildings; Soft landscaping is provided over 20% of the site,
d) allows for adequate area at ground level for AND generally as shown on the first floor plan, in
outdoor recreation, entertainment, clothes drying Attachemnt D.
and other site facilities; and S9.2 If in the Eastern Beaches, Noosaville, Noosa Heads or
e) facilitates on-site stormwater management and Noosa North Shore Locality and in the Detached Housing or
vehicular access. Semi-Attached Housing Zonfrsoft landscaping is provided
Alternative provision to QDe Parts MP1.1 and and retained over a minimum of 20% ofthe site area.
MP1.2, P3
010 011 are not applicable to the proposed
-
S10.1 and S11.1 are not applicable to the proposed Not applicable. NA
development given the site is located within the development given the site is located within the Eastern
Eastern Beaches District. Beaches District.
Materials and finishes-Eastem Beaches
012 Where development does not comply w h the S13.1 Dense landscaping, comprising a mix of native species Landscaping will be provided along the Tropicana
built form acceptable solutions S1.1, S1.2, S1.3, of ground cover, shrubs and trees, is provided for a width of Rise frontage, side boundaries and rear boundary,
S6.1 S8.1, S8.2 or S8.3- 5m from the property boundary adjoining the foreshore to generally as shown on the plan in Attachment 0 -
a) buildings and other structures use materials and provide adequate landscape buffering to the foreshore. First Floor Plan.
finishes thatcomplement the beachside
character and integrate with the surrounding The finish of the buildings and structure, being
natural landscape and skyline vegetation; and neutral colour painted rendered cement block walls
b) views of building or structures from the beach complement the beach side character of the locality.
are framed or filtered through vegetation (see
Figure 14.6).
Page 12
11
Figure 14-6-Filtered views of buildings from
the beach
Roof form
014 Roof forms- S14.1 Wlfh the exception of removal houses, the roof of the The roof form is shallow pitched colourbond kliplock
a) contribute positively to the local skyline; Detached house, Anciffary dwelling unit or Multiple metal roof and contributes positively to the local
b) complement the low density character of the housing Type 1 has- skyline and complements the low density character of
locality; a) a roofpitch no less than- the locality.
c) do not present an appearance of excessive bulk i if in Kin Kin village or Boreen Point village 12 degrees;
-
to side neighbours (eg. avoid low pitched roofs or jj otherwise 5degrees; and
- Refer to Attachment D for North South East and West
box profiles/parapets); b) if not in Precinct C or D of Noosa Springs- minimum building elevations of the detached house to show
d) use simple traditional roof designs; 800mm eaves to at least 75% of the perimeter of the the roof form.
e) offer shading to the walls and windows of the dwelling unit.
dwelling unit;
Q do not create opportunities for residents to Advisory note
overlook the private open space areas of Note that 450mm eaves will achieve this solution provided
neighbouring properties. there is a 150mm wide gutter that brings the total width to
800mm.
AND
S14.2 Buildings and structures do not include roof top terrace
areas.
015 016 are not applicable to the proposed
- S15.1 and S16.1-S16.2 are not applicable to the proposed Not Applicable. NA
development given the subject site is located development given the subject site is located within the
within the Eastern Beaches District Eastern Beaches District.
Garages, catports and other class 10a structures
017 Within the Detached Housing, Semi- Attached S17.1 Wlfhin the Detached Housing, Semi-Attached Housing, The proposed garage, is setback between 6.5 m and
Housing, Attached Housing and Visitor Mixed Use Attached Housing and Visitor Mixed Use Zones, garages, 4.1 m from the Tropicana Rise frontage.
Zones, garages, carports and other class 10a and carports and other class 10a structures-
structures are designed and sited to visually a) have a front boundary setback ofat least 8m;and It is considered the proposed development achieves
integrate with the dwelling unit and avoid dominating b) garage doors that face the street and are visible from the Specific Outcome 01,despite the reduced setback of
the street by- road frontage have a maximum width of 8m within any the garage (10a structure), in that
a) minimising the width of the structure; and one plane, with additional garage doors setback an -
the garage (10a structure) will not visually
b) minimising projection of the structure forward of additional 1m from the frontage to break up the width of dominate the street;
the main face of dwelling unit. the garage fa de. -
the reduced boundary setback will not adversely
impact visual privacy of adjoining uses;
-
the reduced boundary setback is consistent with
existing building setbacks on Tropicana Rise, as
Page 13
12
shown in Section 3 of this report. It follows, the
proposed detached dwelling and garage (10a
structure) maintains the visual continuity and
pattern of the buildings within the street.
Refer to the elevations included in Attachment D.
Water conservation and storage
018 On-site water storage is provided, designed and S18.11f not in a water service area each Detached house is The subject site, located within Council’s water 018 and 019
operated to support the efficient use of water and is to be serviced with a rainwater tank of the following minimum service area, will be connected to the reticulated
adequate for occupants every day use. storage capacity:- water supply system. This supply will be adequate for
a) For Detached houses with no more than 3 bedrooms -
firefighting purposes.
AND 45,000 litres; or
b) For Detached houses of more than 3 bedrooms or
019 Detached houses, Ancillary dwelling units where including a 2nd dwelling unit on the same premises
and Multiple housing Type 1 within Bushfire -
60,000 litres;
Hazard Areas have sufficient water supply for fire
fighting purposes. AND
S19.1 If not in a reticulated water service area- there is, on
the lot, a dam, swimming pool or water tank accessible for
use by the fire brigade, that contains at least 5,000 litres of
water.
Advisory note
The 5,000 litres required in S23.1 can be included within the
water required in S22.1 providing it is accessible for the
purpose of fire fighting at all times and not used for other
domestic purposes.
Effluent Disposal
020 Effluent disposal does not have a significant No solution provided (no requirement for selfassessable The subject site is located within Council’s effluent 020 and 021
adverse effect on biodiversity, natural vegetation or development) treatment and disposal area, and will be connected to
water quality18. Advisory note the system. It follows, the development will not have
021 Treatment and disposal of wastewater does not PSP24 -
Effluent Disposal details requirements for the any adverse impacts on biodiversity, natural
have any detrimental impact on Noosa’s major water design and siting of effluent disposal systems where located vegetation or water quality.
storage and supply -
Lake Macdonald. outside a sewerage service area. Compliance with PSP24
will be considered as part of Council’s assessment of the
plumbina and drainaae application.
Environmental Protection
Page 14
13
022 The design, siting and construction of buildings S22.1 Where there is an existing building envelope on the lot The subject site does not contain protected 022
and structures minimise the clearing of vegetation that contains vegetation protection measures, clearing of vegetation and is already cleared.
and where there is an existing preliminary approval native vegetation and building works do not extend beyond
that includes vegetation protection measures for the the building envelope, except for the purposes of a driveway
property, the proposal is consistent wffh those access;
measures.
AND
S22.2 Where there is no building envelope existing on the lot,
clearing of native vegetation, other than for a driveway
access does not extend beyond-
a) 30m of a building or 10m of a structure onlots greater
than 10ha;or
b) 10m of a building or structure on lots 10ha or less but
more than O.3ha in area; or
c) 3m of a building or structure on lots O.3ha or less.
Carparlcing spaces
023 Sufficient carparking is provided to S23.1 A minimum of 1 carparking space per dwelling unit is One garage is proposed (dimensions)to contain two S23.1
accommodate the number of vehicles likely to use provided on-sffe. vehicles. The development meets S23.1.
the site.
Alternative provisions to QDC Paris MP1.1
Alternative provision to QDC Parts MP1.1 and MP1.2, A8
and MP1.2, P8
Amenity
024 Detached houses, Ancillary dwelling units S24.1 No solution provided (no requirement for self- The proposed development is for a detached house
and Multiple housing Type 1 are located, designed assessable development). within an established residential area. The detached
and operated to avoid significant adverse changes to dwelling is located, designed and operated so as to
the light, air qualffy, noise, accessibility or other S25.1 A 1.5m landscaped buffer separates any private tennis ensure it does not adversely impact adjoining or
conditions enjoyed by users of associated, adjoining court or half court from side property boundaries; nearby residents as a result of light, air quality, noise
or nearby premises; or accessibility.
AND
AND
S25.2 Courts are fenced wffh fencing of 3.6m in height for a
025Lighting and noise associated with the use of full sized court or 2.4m in height for a half court;
the Detached house, Ancillary dwelling unit and
Multiple housing Type 1 or ancillary recreation uses AND
such as outdoor tennis courts and half courts, do not
have an adverse impact upon the amenity enjoyed S25.3 Any lit tennis court or sports court is located at least
by users ofadjoining or nearby premises nor cause 60m from the extemal wall of an existina or approved
Page 15
14
unreasonable disturbance to local fauna. residential dwelling on an adjacent or nearby lot (as
measured from the centre line ofthe court);
AND
S25.4 For lighting-
a) the vertical illumination resulting from direct, reflected or
other incidental lighting emanating from the site does not
exceed 8 lux when measured at any point 1.5m outside
the boundary and at any level from ground level upward;
b) all flood lighting is hooded or baffled to direct lighting
downward or is of a type that gives no upward
component of light when mounted horizontally;
c) all flood lighting is setback a minimum of:
i 6m from the boundary to any frontage;and
ii 2m to any other boundary; and
d) lighting structures are not more than 8m in height
One Household Only 527.1 The Detached House contains no more than 1 The proposed detached house contains: S27.1
027 Wdh the exception of approved Multiple kitchen; - 1 kitchen; and S27.2
1 laundry; and S27.4
Housing Type 1 or approved Ancillary Dwelling -
Units associated with Agricultural Uses, only one AND
dwelling unit is located on the premises and Class 1 The house does not include any habitable rooms that
buildings accommodate 1 household only. 527.2 The Detached House contains no more than 1 exceed 25m from another part of the detached
laundry; house.
AND
527.3 5tudios, pavilions or other habitable outbuildings have
a gross floor area of 50m2 or less;
AND
527.4 No part of the Detached house containing habitable
rooms is more than 25m from another part of the Detached
house.
028 Where located on existing lots within proximity 528.1 Where located within an extractive resource area on Not applicable. The subiect site is not located within NA
Page 16
15
of protected extractive resources, the detached Overlay Maps OM1.5-- OM9.5, the Detached house- proximity of protected extractive resources.
house incorporates design, orientation, and a) is located at least 200m from the extractive resource/
construction measures that mitigate the effects of processing area; or
noise, dust, ground vibration, or air blast b) achieves a minimum Sound Transmission Class rating of
overpressure from the extractive industry. 30 for all windows or glass doors on the wall closest to
the extractive resource/processing area.
Page 17
16
Attachment B -
Assessment Against Natural Hazards Overlay Code
13.30.2 The overall outcomes sought from the Natural Hazards Overlays Code are-
a) development in areas at risk from natural hazards is compatible with the nature of the natural hazard;
b) the risk to people, property and the natural environment from natural hazards is minimised;
c)development does not result in a material increase in the extent or severity ofnatural hazards; and
d) for acid sulfate areas-the generation or release of acid and associated metal contaminants into the environment is avoided
13.31 Specific outcomes for the Natural Hazards Overlay Code
The specific outcomes sought for the Natural Hazards Overlay Code are included in column 1 of Tables 13.8-13.12. Acceptable solutions for self-assessable development and probable
solutions for code assessable development are included in column 2 of Table 13.8-13.12.
Table 13.8 Landslide hazard areas
Specific Outcomes Probable Solutions Assessment Compliance
13.32 Effects of use
General
01 Development is located to ensure it does not S1.1 The proposed development is not located in a landslide The site is well vegetated and there is no evidence of
compromise the safety of people, property or hazard area as indicated on Overlay Maps OM1.3-0M9.335; any land slippage (Refer geotechnical report
hazardous materials manufactured or stored in bulk OR Attachment C).
by increasing risk oflandslide; S1.2 The development site is not subject to landslide, either
intemally or from sloping land above the site (ego slopes are During construction of the lower level, a maximum cut
AND less than 1 in 10"(10%) depth of 1.5 m is estimated to the westem edge of
AND the lower pad at which point an engineer certified
02 Development, including accessways is designed S1.3 Development, including necessary earthworks within block retaining wall will form part of the westem wall
and constructed to- Precinct F of the Noosa Springs site, improves the stability of of the lower building level. The excavated cut will be
a) minimise impacts on the natural landform; any non-natural landform so it is not at risk from landslide back filled to the engineer’s recommended level.
b) minimise risk to people and property from either on the site or from sloping land above the site.
landslide; A proposed buffer zone between the neighbouring
c) avoid any potential instability and associated S2.1 No solution provided dwelling to the south of the ground floor
problems, including long term stability of the site
and long term stability ofthe development.
Protection of Infrastructure and Community Uses
03Community Uses and Infrastructure Uses, S3.1 Community Uses and Infrastructure Uses are not
including that identified below, are able to function located in a landslide hazard area as indicated on Overlay
effectively during and immediately after landslide Maps OM1.3- OM9.3;
Page 18
17
events-
a) Emergency service facilities; OR
b) Hospitals;
c) Education Type 4 uses, including stores for S3.2 The community infrastructure development-
valuable records or items of historic or cuftural a) does not resuft in any new building work other than an
significance; and addition to an existing building;
d) Service and utility uses, including electricity b) does not involve vegetation clearing; and
substations, major electrical depots and water c) does not after ground levels or stormwater conditions;
treatment plants.
OR
S3.3 The development includes measures that ensure-
a) the long term stability of the site;
b) access to the site will not be impeded by a landslide
event; and
c) the community infrastructure will not be adversely
affected by landslides originating on sloping land above
the site.
Table 13.9 Bushfire hazard areas37
Specific Outcomes Probable Solutions Assessment Compliance
13.33 Effects of use and works
New Uses
04 The proposed use does not compromise the 54.1 The use is sited on land that is not in a Medium or High The site is determined as low bushfire risk as
safety ofpeople or property from bushfire. Bushfire Hazard Area38; determined by
OR
S4.2 The use is sited on land that is determined as low
bushfire risk by a site specific bushfire hazard assessment.39
Protection of Infrastructure and Community Uses
05 Community Uses and Infrastructure Uses, S5.1 Community Uses and Infrastructure Uses are not
including that identified below, are able to function located in a High or Medium Bushfire Hazard Area identified
effectively during and immediately after bushfire on Overlay Maps OM1.4 to OM9.4;
events-
a) Emergency service facilities; OR
b) Hospitals;
c) Education Type 4 uses, including stores for S5.2 Building work will not involve more than an additional
valuable records or items of historic or cuftural 20m2of gross floor area to an existinq buildinq;
Page 19
18
significance; and OR
d) Service and utility uses, including electricity S5.3 Where located in a High or Medium Bushfire Hazard
substations, major electrical depots and water Area identified on Overlay Maps OM1.4 to OM9.4, uses are
treatment plants. designed to function effectively during and immediately after
bushfire eventS40.
Hazardous materials S6.1 Hazardous materials are not manufactured and stored
06Public safety and the environment are not on the site.
adversely affected by the detrimental impacts of
bushfire on hazardous materials manufactured or
stored in bulk.
13.34 Siting, design and construction
07 Uses and works including building works are S7.1 Uses and works including building works are sited-
sited, designed and constructed to- a) on lots greater than 2500m2;
a) minimise the number of people and property i) in locations of lowest hazard within the lot (Figure
subject to bushfire risk; and 13.5 provides guidance); and
b) maximise the protection of people and property ii) to achieve setbacks from hazardous vegetation of 1.5
during the passage ofa fire front. times the predominant mature canopy tree height or
10m whichever is the greater; and
iii) 10m from any retained vegetation strips or small
areas of vegetation; and
ivy so that the elements of the development least
susceptible to fire are sited closest to the bushfire
hazard;
b) on lots 2500m2 or less -
to maximise setbacks from
hazardous vegetation37
13.35 Water supply_ for fire fighting
08An adequate and accessible water supply is S8.1 For premises not in a water service area-each lot has The site has adequate reticulated water supplies for
provided for fire fighting purposes. an accessible dam, swimming pool or water tank accessible fire fighting activities.
by the fire brigade that contains at least 5000 litres of water.
13.36 Vehicle access and fire trails
Firebreaks and fire access tracks S9.1 Firebreaks are provided by- The site is located in a developed residenital street
09Firebreaks or fire access tracks proVide- a) a cleared road reserve not less than 20m wide located with sufficient access for emergency vehicles.
a) adequate access for fire fighting and other around the perimeter ofthe development;
emergency vehicles; and OR
bl adequate width to minimise the risk of fire b) fire access tracks between the development and
Page 20
19
crossover. surrounding vegetated lands that-
i. are a minimum cleared width of 6m;
ii. have a maximum grade of 1 in 8(12.5%);
iii. have a formed pavement;
iv. have access at each end and in other locations
where necessary;
v. have passing areas and turning areas;
vi. have clearly identified access points for emergency
vehicles; and
vii. are located on public land or wffhin access
easements that are granted in favour of the Sunshine
Coast Regional Council and the Queensland Fire and
Rescue SeNice.41
13.42.2 The overall outcomes sought for the Natural Resources Overlay Code are-
a) for agricultural/and conservation areas-
i the use ofgood quality agricultural land for agriculture is not adversely affected by other forms of development; and
ii uses that are able to be located elsewhere do not locate within agricultural/and conservation areas;
b) for extractive resource areas-
i development does not adversely affect the ongoing use of existing extractive or mining industries or the development of extractive resources;
ii development does not constrain the transportation of the extracted material to markets; and
iii a high level of amenity for residents and land uses in the vicinity of extractive resources, extractive industry operations and transportation routes is maintained;
for
c) water supply catchment areas-
i Lake Macdonald and Cedar Pocket dam water supplies are not adversely affected by development or the effects of development;
ii costs of water treatment and infrastructure maintenance are minimised;
Hi the expected life of dam infrastructure is maximised; and
iv the visual amenity of Lake Macdonald is not adversely affected by development; and
d) for areas in proximity to gas pipelines-
i development does not compromise the safety ofpeople or property and is located to avoid dangers associated with gas pipelines; and
ii development does not adversely affect the operation of gas pipelines and the supply ofgas; and
e)for Coastal Protection Areas, development-
i does not adversely impact upon natural coastal processes; and
ii is designed and sited to protect the natural beach experience and visual amenity enjoyed by residents and others.
Table 13.17 Coastal Protection Areas
Page 21
20
13.48 Coastal Protection Areas
016 The smng and design of development and S16.1 A mix of native landscaping, such as ground covers, It is proposed to leave at least 5 m of ground on
materials used within the Coastal Protection Area, as shrubs and trees, is provided for a width of 5m from the the seaward boundary undisturbed during and
identified on the Natural Resources Overlay Maps, seaward or rear boundary of the site to provide adequate after construction so as to maintain natural
do not cause any significant adverse impacts on the landscape buffering to protect the coastal dune system52. landscaping as the rear and seaward boundary
coastal resources of the location nor interrupt the S17.1 A mix of native landscaping, such as ground covers,
buffer zone.
natural cycles of erosion and accretion of foreshore shrubs and trees, is provided for a width of 5m from the
areas and beaches. seaward or rear boundary of the site to provide adequate
AND landscape buffering to protect the character of the
017Buildings, structures and works within the beachfront.53
Coastal Protection Area that are visible from the
beach-
a) are designed to protect the character ofthe
beachfront when viewed from the water and
integrate with the sUffounding natural landscape and
skyline vegetation (see Figure 13.6); and
b) are finished predominately in colours and hues of
the surrounding natural landscape.
018 Buildings and other structures including S18.1 No solution provided. The setback from the seaward boundary is
swimming pools and retaining walls do not extend greater than 6m and the building will not extend
seaward of the coastal building fine51 except- greater than 3m of the existing building line.
a) uncovered and unenclosed cantilevered balconies
that do not extend greater than 3m seaward of the
coastal building fine;
and
b) are setback a minimum of 6m from the seaward
boundary (SeeFigure 13.7).
AND
019 Where a coastal building line does not exist on
properties fronting the beachfronf or a reserve
adjoining the beachfront- buildings, other structures
and retaining walls are setback a minimum of 6m
from the seaward boundary of the site
AND
020 Rear fences adjacent to the beachfront within
the Coastal Protection Area are designed and sited
to be sympathetic with the visual amenity ofthe
beachfront and do not degrade the natural
Page 22
21 I beachfront character. [OCR of page images] 21 | beachfront character.
Page 23
22
ATTACHMENT C -
Geotechnical Report
[OCR of page images]
ATTACHMENT C — Geotechnical Report
22
Page 24
MR ANDREW AITKEN
Slope Stability Assessment
Lot 9 (#18)Troplcana Rise, Castaways Beach
Job: ME13-018 Date: May 2013
MORRISON
GEOTECHNIC
Page 25
.BRISBANE .GOLD COAST .CABOOLTURE .SUNSHINE COAST
Unit 1 / 35 Limestone Street Unit 5/ 36 Lawrence Drive Unit 3/42 Aerodrome Road Unit 4/81 ’Msas Road
Darra Old 4076 Nerang Old 4211 Caboolture Old 4510 MaroocllydOre Old 4558
PO Box 3063 PO Box 2011
Darra Old 4076 Nerang Old 4211 MORRISON
P: 07 3279 0900 P: 07 5596 1599 P: 07 5499 0755 P: 07 5443 9522 GEOTECHNIC
F: 07 32790955 F: 07 5527 2027 F: 07 5428 2498 F: 07 5479 1633
ABN 51 009 878 899
brlsbanelab(!lmorrlsongeo.com.au [email protected] [email protected] [email protected]
RPEU02241
www.morrlsongeo.com.au
Maroochydore Office
Email: [email protected]
Job No: ME13-018
Ref No: 01273
Author: M Rubinic and 0Riley
27th May 2013
Mr Andrew Aitken
8 Coconut Grove,
Castaways Beach, QLD 4567
ATTENTION MR ANDREW AITKEN
Email: [email protected]
Dear Sir
RE: REVISION OF EXISTING SLOPE STABILITY ASSESSMENT TO REFLECT CURRENT
BUILDING DESIGN
LOT 9 No. is TROPICANA RISE, CASTAWAYS BEACH
1.0 INTRODUCTION
This report has been prepared to address the suitability of Lot 9 NO.18 Tropicana Rise,
Castaways Beach (the Site) for a proposed residential development with respect to slope
stability. The aim of this investigation is to assess the stability of the site in its present
condition and provide advice for the planning and design of the proposed residential
development. The assessment also includes the impact that the proposed development will
have on the stability of the site and nearby premises and provides maintenance and other
management practices to assist with ensuring the long term stability of the subject site.
The slope stability assessment methodology adopted for this study generally follows the
guidelines presented in the Australian Geomechanics Society "Landslide Risk management
Concept and Guidelines" Vol 35 No 1 March 2000 pp 51-92 which is in accordance with the
Queensland Government’s State Planning Policy 1/03.
Site borehole information was obtained from the supplied Geotechnical Soil Investigation
Report carried out by Design Engineers Queensland pty Ltd (DEQ). Their report (Job No.
12.2452 dated 07/09/2012 refers). It should be noted that Morrison Geotechnic assumes no
responsibility for the accuracy of the subsurface conditions described in the DEQ report.
Page 26
2
Job No. ME13/018
This assessment was requested and authorized by Mr Andrew Aitken (herein referred to as
the Client) by email dated 14th May, 12013.
2.0 METHODOLOGY
A desktop study involving perusal of the supplied soil test report (DEQJob No. 12.2452 dated
07/09/2012), published geological data, Client supplied contour plans and preliminary concept
plans of the development was initially carried out. This was followed by a walkover survey of
the Site by a Geoscientist from our Maroochydore Office on 10th January 2013. This involved
mapping and measuring features of significance to slope stability such as existing slope
gradients, slope direction, erosion features, surface and subsurface drainage, vegetation
density and the presence of irregular surface features which may be associated with
instability.
From the results of the walkover survey and information obtained from the existing Soil Test
Report, assessments were made of the stability of the steepest sloping ground surface at the
site, (central eastern portion). This assessment does not take into account the presence of
vegetation, which would be having a significant positive effect on the stability of the slopes.
The Site Survey plan is attached in Appendix A.
The Preliminary Design Concept of the dwelling is attached in Appendix B.
The DEQ Soil Test Report is attached in Appendix C.
Examples of Good and Poor Hillside Practice and Guidelines for Hillside Engineering are
presented in Appendix D.
3.0 RESULTS
3.1 Desktop Study (Regional Geology and Soil Profile)
Published data from "Department of Mines and Energy, Gympie Special Sheet 9445, Part
9545 First edition 1999" describes the basement geology of the location as Quaternary
Dunes, mainly parabolic and comprising windblown (aeolian)quartz sand.
Borehole data contained in DEQ Soil Test Report describes the subsurface geology at two
borehole locations (BH1 and BH2) to the borehole termination depths of 3.0m and 1.5m
respectively as follows:-
BH1:
00 3000
- NATURAL
SILTY SAND
LT-GREY,
J/MOIST, LOOSE TO MEDIUM DENSE
BH2:
000 -
1000 NATURAL
SILTY SAND
LT-GREY,
J/MOIST, LOOSE.
1000 -1500 SILTY SAND
LT-GREY
J/MOIST, LOOSE TO M-DENSE
Ref 01273 -
Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 27
3
Job No. ME13/018
The subsurface soils encountered in the boreholes drilled at this site by QST are considered
to reflect the published geology data with loose and loose to medium dense silty sand being
observed in both boreholes to the termination depths.
3.2 Site Observations
Located on the eastern side of Tropicana Rise, the site is orientated in an east to west
lineation and is characterised by sloping topography which slopes down to the east at varying
grades of between 10 degrees and 15 degrees on the western portion of the site, steepening
in grade to approximately 20 degrees to 25 degrees for the remainder of the site. Locally
steeper portions of the site, approaching 30 degrees, exist near the central eastern portion of
the site (Photo 3.2A refers). Total relief across the site is approximately 10.0m (RL 24.5m to
RL 14.5m) with a relief across the proposed building footprint of approximately 5.5m (RL
24.1 m to RL 23.5m).
At the time of the investigation the ground surface was generally well vegetated by a dense
covering of knee to waist high grasses and shrubs that provide considerable additional
stability to the sloping terrain. Several typical coastal heath type mature trees and bushes up
to a maximum estimated height of 6.0m were also present at the site with evidence of past
clearing activities in the form of several short tree stumps with a maximum diameter of
approximately 200mm also evident across the site. The ground surface was for the most part
completely covered across the entire site with the exception of few narrow bare earth tracks
traversing the site as ungazetted walking tracks (Photo 3.28 refers).
Ref 01273 Mr Andrew Aitken
-
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 28
4
Job No. ME13/018
Photo 3.28: Looking east-southeast from the central western portion of the site.
The Site is assessed to be well drained with a planar to concave drainage profile directing
surface water towards the eastern boundary of the Site and David Low Way with no obvious
erosion features noted. Drainage of the limited upslope rainfall catchment outside the
boundaries of this site is managed by kerb and channel drainage associated with Tropicana
Rise which aligns generally north south along the ridgeline of the parent sand dune. Locally,
there is no evidence of existing or recent land instability with regard to landslip or significant
erosion and construction of residential dwellings adjacent to the Site on similar land have
proceeded with no signs of existing or recent slope instability (Photo 3.2 C and 3.2 D refers).
Ref 01273 -
Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 29
5
Job No. ME13/018
site.
Ref 01273 -
Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 30
6
Job No. ME131018
4.0 BROAD ASSESSMENT OF EXISTING STABILITY AND LANDSLIDE HAZARD
RISK RATINGS
At the time of the investigation there were no significant erosion features noted and there was
no evidence of existing or recent past slope instability involving large movements of
significant quantities of soil in a short duration event such as a landslip or landslide at this
site. There is however the potential for some minor to moderate instability in the form or
erosion and slumping particularly during heavy rainfall events or high wind conditions if the
ground surface is stripped of the dense vegetation, particularly on the steeper central eastern
portion of the site.
Adopting the approximation FOS (Factor of Safety)= tan$/tane,where $ is the friction angle of
the surficial soils and e is the angle of the slope, the typical FOS values for shallow sliding of
the surface soils over the steeper slopes in the central eastern portion of the site where e is
typically 200 to 250 generally, but approaches 30 degrees locally, are assessed to be typically
1.2 to 1.5, but locally about 1.1, corresponding to near limiting equilibrium and being less than
1.5, which is usually considered to be the minimum design target value. The dense vegetation
provides additional support for the steeper sections, whereby removal of this vegetation will
most probably result in instability within the loose surficial sands in the form of erosion, slips,
creep or slumping, especially after rainfall. On this basis, the long term stability for the site is
contingent upon the recommendations presented in this report and the Guidelines for Hillside
Engineering being strictly followed. On the western parts of the Site, where slopes are flatter,
generally ranging between 10 degrees and 15 degrees, the FOS values are in excess of 2,
which reflects stable conditions.
On this basis and governed by the steeper eastern portions of this site, the likelihood of
instability in the form of minor to moderate erosion, creep and/or slumping after the removal of
vegetation, is considered to be "Likely" meaning that an event will probably occur under
adverse conditions over the design life of the project with an indicative annual probability of
10-2.
The consequence of this instability at the site is assessed to be "Minor" meaning that in the
event of soil instability, limited damage to part of a structure, or part of the site requiring some
reinstatement stabilization works.
On this basis, the risk to property can be assessed as "Moderate" under present conditions.
This level of risk is Tolerable and usually accepted provided a treatment plan is implemented
to maintain or reduce the risk to "Low". If the recommendations outlined in Section 5.0 to
Section 7.0 of this report are followed, the risk level to property reduces to Low which is
usually accepted.
5.0 IMPACTS OF PROPOSED DEVELOPMENT ON SITE AND NEARBY PROPERTIES
5.1 General
On the basis of Client supplied data, it is understood that the proposed development is to
consist of a two storey split level, residential dwelling and garage. It is understood that the
building will be supported on screw piles as per the recommendations given in the DEQ Soil
Test Report or on stiffened rafts with edge and internal ground beams. Cut and fill earthworks
will be required to manage the relief across the building envelope for on grade construction of
the entry level floor, first floor and ground floor.
Ref 01273 -
Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 31
7
Job No. ME13/018
Cuts supported by retaining walls will range up to about 2.0m beneath the house to form the
ground floor level at about RL 19.0m and about 1.0m for the front entry floor at approximately
RL22.6m.
Establishing adequately designed, constructed and maintained surface and subsurface
drainage as well as adopting suitable footing systems founding in competent subsurface
materials at depth is critical to the long term performance of the site in terms of slope stability.
Disturbance or removal of the dense vegetation from the steeper portions of this site can
cause instability in the form of slips, slumping, erosion and creep movements as this
vegetation provides additional support to the slopes. Where appropriate, natural vegetation
must be retained and cleared areas must be kept small and immediately revegetated after
construction where appropriate, to minimize the potential for instability and future erosion.
Suitable footing systems, founding within medium dense sandy soil at depth, will also
minimize the potential for stability problems within and around the building footprint. The
proposed development is not expected to impact on the stability of the Site or neighboring
property and infrastructure if the recommendations presented within this report are followed.
5.2 Excavations
An entry floor pad level of RL 22.6m is proposed which will require a maximum cut of
approximately 1.0m in the south west corner of the building pad.
Cut earthworks will also be required for construction of the ground floor pad at RL 19.0m.
Maximum cut depth is estimated at about 2.0m. Supplied design drawings indicate support of
the cuts using reinforced masonry walls. Batter angles approaching 30 degrees in
unvegetated sandy soils for cuts and fills at this site are considered inappropriate as a long
Battered slopes, particularly unvegetated battered slopes at this
term soil stability solution.
site, should be no steeper than 22 degrees or 2.5(H): 1 (V) and revegetated or protected
against erosion (eg erosion protection matting) as soon as practical to provide long term
slope stability.
Limited information was made available regarding the existing development to the south of
the site which comprises a concrete split level residence. With the proposed buffer zone
between the neighboring dwelling and proposed excavation for the ground floor on this site
approaching 2.0m, the southern face of the excavation may require the construction of a
retaining structure to prevent potential undermining of neighboring structures, including the
boundary walls, or neighboring soil loss in the event of a landslip. The adopted system may
require consideration of the loads from the footings and walls of adjacent structures, which
are immediately adjacent to or on the south boundary. The footing types, founding depths
and loads of footings supporting the adjacent buildings are not known. A suitable temporary
retaining system for the ground floor slab should be configured to enable the ground surface
behind the temporary structure to be left undisturbed whilst construction of the permanent
retaining system takes place in front of the wall. After construction, the void space between
the two walls is filled using engineered fill compacted to 95% SMDD or not less than 70%
Density Index and revegetated as soon as possible. The temporary retaining wall is then
removed or it can remain in place.
A suitable temporary retaining structure may comprise:
. Post and panel wall construction
. Driven sheet piles
The neighboring site to the north is undeveloped. Cut excavations to approximately 1.0m for
the proposed new development will encroach within 0.5m to 1.0m of the neighboring
boundary. Due to short buffer distance between the excavation face and the neighboring
boundary, temporary soil retention using a physical structure is encouraged to prevent
potential soil loss on the neighboring property, alternatively the construction of the proposed
permanent retaining wall using a "hit and miss" sequence could be considered whereby:
Ref 01273 - Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 32
8
Job No. ME13/018
.
post holes are drilled at appropriate centers along the alignment of the wall to socket
below the proposed excavation base (in accordance with detailed design)
. Install and secure (concrete) the post into the drilled holes extending up to final
ground surface.
. Excavate vertically between posts in a "hit and miss" sequence, installing panels
between posts before moving on to the next section.
The buffer zone between the proposed development and the east and west boundaries of the
site are considered adequate to provide minimal risk to upslope and downslope infrastructure
in the event of a short duration event such as a surficial landslip. Here excavations can
proceed unsupported at a maximum slope of 30 degrees with erosion matting being fixed
over the cut surface for the duration of construction. Some minor surficial instability can be
expected, particularly after rainfall but this will be contained within the development envelope
and be of nuisance value rather than a risk to personnel and equipment. Rapid construction
of the retaining walls after cutting and staggering of the construction Le. where a sensible
portion of the cut is excavated (eg. 5m section) and wall installed prior to moving on to the
next section of cut is encouraged. Any fill placed behind retaining walls must be engineered
structural fill compacted to 95% SMDD or not less than 70% Density index.
6.0 RECOMMENDATIONS TO REDUCE HAZARD RATING
The following risk reduction strategies, in conjunction with the general Guidelines for
Development described in Section 7.0 below, must be followed to reduce the risk level
implication posed to the residential development to a Low level of risk level:
Natural vegetation must be retained wherever practicable and cleared areas must
be kept small and immediately revegetated to minimize the potential for instability
and future erosion.
. All excavations exceeding 1.0m or greater than 20 degrees must be supported by
adequately engineered retaining walls or battered at appropriate angles. Retaining
walls must be designed for a long term factor of safety of at least 1.5 and
constructed as soon as possible after cut or fill operation. Any fill placed behind
retaining walls must be engineered structural fill compacted to 95% SMDD or not
less than 70% Density index. Drainage must also be incorporated into the wall
design as well as behind the crest to intercept surface and subsurface water flows.
This surface water must be redirected into dedicated drainage areas.
.
Filling should be benched into the sloping ground surface and supported by
engineered retaining walls as needed. Fill batter slopes if appropriate should be no
steeper than 22 degrees or 2.5(H): 1 (V)and be over constructed and trimmed back
to ensure adequate compaction in the outer zones. Any placed fill should be
compacted to 95% SMDD or not less than 70% Density index and revegetated if
appropriate or protected against erosion immediately after construction. Fill heights
should be limited to less than 1.0m.
A surface drain system must be installed upslope of the proposed residence to
collect surface water flows from upslope areas. This water must then be discharged
into the stormwater system.
All lot runoff and roof water must be discharged into stormwater systems, not over
the ground surface. Alternatively roof water can be discharged into water tanks for
storage.
.
Slope sensitive residential design for the building must be adopted. Slope sensitive
residential design includes split level on-grade raft slabs, pole houses or framed
houses with suspended floors. It is understood that the house w be supported by
screw piers as recommended in the attached DEQ Soil Test Report.
Ref 01273 - Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 33
9
Job No. ME13/018
All footings should found within medium dense sand, beneath the loose surficial
sand and below the expected zone of erosion by wind, rainfall and surface runoff.
Structural design should ensure stiffness in the down slope direction e.g. Strip
footings and internal beams aligned up and down the slope.
No structural development is to found within loose surficial soils, or shallower than
1.0m or on non structural or uncontrolled fill material.
6.0 GENERAL GUIDELINES FOR DEVELOPMENT
Sound hillside engineering practice is essential to the long term performance of the
development.
The proposed residential development must be designed, constructed and maintained in
accordance with the attached Guidelines for Hillside Construction and the development
examples shown on the attached Illustrations of Good and Poor Hillside practice. The more
significant requirements are summarized below:
. No cut or fill should be carried out unless approved by a suitably qualified
geotechnical engineer or engineering geologist. All fill should be constructed under
Level One Supervision as defined in AS 3798 2007 (Guidelines on Earthworks For
-
Commercial and Residential Developments)
. All storage tank overflow water must be piped to the nearest gully well down slope of
the proposed houses or into the stormwater system. Uncontrolled discharge to the
hill slope is not permitted.
. Storage tanks should be located down slope or to the side of the proposed house.
. No development should take place within any surface irregularities such as possible
slumped areas, washouts or erosion features. If development is to occur in these
areas, surface irregularities must be removed prior to development and drainage
improved.
If the recommendations outlined in Sections 5.0 to 7.0 are followed and implemented the risk
level implications for the risk posed to the property can be reduced to Low which is a tolerable
level of risk.
Ref 01273 - Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 34
10
Job No. ME13/018
7.0 LIMITS OF INVESTIGATION
This Report has been prepared by Morrison Geotechnic pty Ltd (Morrison Geotechnic), and
may include contributions from Morrison Geotechnic’s officers and employees, sub-
contractors, sub-consultants or agents (Contributors).
This Report is for the sole benefit and use of Andrew Aitken (Client)for the sole purpose of
providing geotechnical advice and recommendations in respect of the proposed residential
development at Lot 9 No. 19 Tropicana Rise, Castaways beach.
The Report is only intended to addresses those issues expressly described in the scope of
work in the Proposal Letter and this Report.
This Report should not be used or relied upon for any other purpose without Morrison
Geotechnic’s prior written consent. Morrison Geotechnic and the Contributors do not accept
any responsibility or liability in any way whatsoever for the use or reliance of this Report by
has
anyone other than the Client or by anyone for any purpose other than that for which it
been prepared.
Except with Morrison Geotechnic’s prior written consent, this Report may not be:
(a) released to any other party, whether in whole or in part (other than to the Client’s
officers, employees and advisers);
(b) used or relied upon by any other party; or
(c) filed with any Governmental agency or other person or quoted or referred to in any
public document.
Morrison Geotechnic and the Contributors, do not accept any liability or responsibility
whatsoever for, or in respect of, any use or reliance upon this Report by any third party.
Morrison Geotechnic is not obliged to enter into discussions with any third party in respect of
this Report.
The information (including technical information and information obtained through
discussions) on which this report is based has been provided by the Client and third parties.
Morrison Geotechnic and the Contributors:
(a) have relied upon and presumed the accuracy of this information;
(b) have not verified the accuracy or reliability of this information (other than as expressly
stated in this Report);
(c) have not made any independent investigations or enquiries in respect of those
matters of which it has no actual knowledge at the time of giving this Report to the
Client; and
(d) make no warranty or guarantee, expressed or implied, as to the accuracy or reliability
of this information.
Morrison Geotechnic and the Contributors do not accept responsibility or liability for any
incorrect assumptions related to this Report. For the avoidance of doubt, this Report:
(a) cannot predict the ground conditions encountered at any untested location because
the ground conditions surrounding a test sampling location (or between any two test
sampling locations) may be different from the test samples we have obtained;
(b) is not an environmental, contamination or hazardous materials assessment; may be
invalid, incomplete or inaccurate (including errors in the scope of work, investigation
methodology, observations, opinions and advice) where the information provided to
Morrison Geotechnic was invalid, incomplete or inaccurate;
Ref 01273 - Mr Andrew Aitken
Lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 35
11
Job No. ME13/018
(c) is limited to observations of those parts of the site that were accessible at the time of
the field investigation and is not based on observations about areas of the site which
were inaccessible to the investigation equipment (including slopes, heavily vegetated
areas or service corridors);
(d) is not a comprehensive representation of the actual site conditions and may only
show a reasonable interpretation of conditions encountered at discrete test locations
along with general site observations; and
No warranty or guarantee, whether express or implied, is made in respect of the geotechnical
data, information, advice, opinions and recommendations present in this Report.
In recognition of the limited use to be made by the Client of this Report, the Client agrees that,
to the maximum extent permitted by law, Morrison Geotechnic and the Contributors shall not
be liable for losses, claims, costs, expenses, damages (whether in statute, in contract or
any
tort for negligence or otherwise) suffered or incurred by the Client or any third party as a result
of or in connection with the information, findings, opinions, estimates, recommendations and
conclusions provided in the course of this Report.
If further information becomes available, or additional assumptions need to be made,
Morrison Geotechnic reserves its right to amend this Report
Yours faithfully
M D RILEY (RPEQ5641)
for and on behalf of
MORRISON GEOTECHNIC PTY LIMITED
Encl. Appendix A Site Survey plan
-
Appendix B Design Concept
-
Appendix C DEQ Soil Test Report
-
Appendix D Examples of Good and Poor Hillside Practice and Guidelines for Hillside
-
Engineering
Ref 01273 -
Mr Andrew Aitken
lot 9 No. 18 Tropicana Rise, Castaways Beach. MORRISON GEOTECHNIC
Page 36
APPENDIX A Site Survey [OCR of page images] APPENDIX A Site Survey
Page 37
10
MCH5387
I ~I
CL CL.
:r:: :r::
Vacant Lot o 0 rl~~Dn
r
VJ
... Sewer
Teltnl and Underground ectricol (J)
9001 (J)
Lid RL
Plotted from Records CL
Screw in kerb / PROJECT
. :r::
RL24-493
0 Proposed New Residence
~
+
~11\
~O
a..
:r::
0 0
CL
:r::
CASTAWAYS BEACH
CLIENT
Mr & Mrs Aitken
18 Tropicana Rise,
TITLE
, Site Plan
l.
l
CL DATE
:r:
0 April, 2013
DRAWN
a.. a..
::r: ::r: SlR
0 0 Overhead Electricity
SCALE
"\’It Sa9 levels
’0 "-’ +.ee9-
r!;
’It ~ o(
~ DRWGNo.
X
._._’1,; 13AJA01
ISSUE
Preliminary
;’1’1/)" P;on- 1’,"" ~
" V. .a
i
’lX’ Contractor to verify all
V)
~l;’t~ .J\’
t. Fe ~
((/~ 1>-
~
t
Je, ’"
~ ~
\
.~ ~ dimensions on site prior to
Commencing work
"
l
"
f)<’ ~
\’)~, I
! ’\ (co
’1-:>’l:?J)
"
..
"3k’t
~L
r’rv’,125:’()
0(\ +fl 21.8 1’2~-S6 277"44’10"
~ Use fIgUred dimensions in
preference to scaling
--~~Of
,
;’8,16 J1.2/l
I
-_
- 0, cr.,
,;n!’
-
;’ ~ These drawings to be read
In conjooction with the
Engineering details
-
~I
-
’"
o 0) >-~_v_, -
E’
--f ,~:_, ’))
.:;/ ’1 o
~ if? rt%-)
’1
I
I--
....,
Copyright Designright
~
~ ’~ Concrete Split Level
~ I~
Residence
-I
.?818 8 ~
O~ MCH5387 0::0 S
~ .:z::::r::r
\J"t:rt)
I , I
~
Page 38
APPENDIX B Preliminary Design Concept [OCR of page images] APPENDIX B Preliminary Design Concept
Page 39
II~~D~
.
PROPOSED NEW RESIDENCE
MR & MRS AITKEN
(LOT9)18 TROPICANA RISE
CASTAWAYS BEACH OLD 4567
I ’
,_
;, ’
.J
;f
../
_
,.~
J
,_’.~..l
:7tI~r
,
,’.. ~ .
1-" .f;~
i" ,1’).’. ~.
_
,/,lY
’
r
-\;...,noo;
~_
"
_O
~
""--. ’~’:’ 4"
1,.......V"1",
..
[OCR of page images]
PROPOSED NEW RESIDENCE
MR & MRS AITKEN
(LOT 9) 18 TROPICANA RISE
CASTAWAYS BEACH QLD 4567
riaaon
Page 40
.fiK"’7r~~
~ ~
r--
-1
I
I
I TITLE
,
l---
~et:: ,
,--I
I I
’.e>Jp
I DATE
~--_j
ApriI,2013
DRAWN
SLR
~
SCALE
_j ~,
~ +.<I
DRWGNo,
~ 13AJA02
INI~
I I I’t\..U..’ ~ 1:7 II ISSUE
Preliminary
-7
’-1’"
I \ /
I I’’’:’,’00’ "I
,:
. .
:,’,’, ’:
.
,,;’:.
I
~,~~
\/:~- ,:’. I
/\ I
I ~ ’7rWr"/’1Y ’: ’,’,’ ~~~~
1~_j~tAPr~ ---’~~
Copyrig I Oesn ghl
~
~~....~
II-
I
11
Page 41
.~~~
on
PROJECT
Residenoe
^1 CLIENT
r
I
TITLE
DATE
ApriI,2013
I DRAWN
I SlR
~ I SCALE
~~
~\.- 1’S’1~ ~
I
DRWGNo.
I 13AJA03
11
~
I ISSUE
II~ I II Preliminary
~’’’6’
-,-
R
L-IHE:- Of"~
~ I ~
I
J Copyrig Designright
S~<z.
Page 42
~~-{- FI~ C~y
~~?
.
~~LE.VA1t/’N
rl~~D.n
.
PROJECT
~*P
Proposed New Residence
CLIENT
t..-MN<PA.-- -2Z~_
’fi:.l, 2.1 ~G:.~ Fa>!.--- 1"~
.c,,1r; ~ Mr & Mrs Aitken
18 Tropicana Rise,
~~N~""’~
CASTAWAYS BEACH
.?~ ~~r;{%...
TITLE
---l- -+
~D~--
Elevations
\..E.-’-"eI" Rl- 14.q95
~~Pl~ DATE
CAI-m~~~.~ ApriI,2013
DRAWN
~~~
SLR
SCALE
.
~E-t.-e.VATl ~
~
~<Uj.,~ DRWGNo.
13AJA04
ISSUE
~~ Preliminary
u. Contractor to verify all
dimensions on sHe prior to
Commencing work
a-mz_y Use figured dimensions in
~’- Zz_. preference to scaling
1?7S
These drawings to be read
~vta-lE.Etz-. In conjunction with the
~~ Engineering deta s
r
Copyright Designright
~~et"<’~"’-XP .......--"l.v
C4l-lT1~ ~-c.~
~.
}
Page 43
.w~t=V6V~
11~~Dn
~~ ~~
~t:H!E-(~
PROJECT
Proposed New Residence
~1Zt>eJ\..--
CLIENT
Mr & Mrs Aitken
18 Tropicana Rise,
CASTAWAYS BEACH
t-It-re. Pf" !-1~
~6lN~ TITLE
t--I J_ ’..:_,
-11
Elevations
~~
r-7PF ~
-4- - __j;b.
1.-t~~~wAI..V
~.~
r....t-’EI-- \...1M" ~17~
DATE
~ ~t...NN l"N... ApriI,2013
l-I pP ~~ ’eNno/ ~
DRAWN
SLR
SCALE
.
EA-7\ t:LEV^TJ::::7N
~
~~aaz.w
~ 7~~’iED~.~~$ DRWGNo.
~ 13AJA05
ISSUE
Preliminary
L,__ 4- 4- T~Q~~
Contractor to verify aU
dimensions on site prior to
’..:’
. Commencing work
’. ~
. ’. ~"i
. :... ...:..;. ..
.’
Use figured dimensions in
preference to scaling
,t.__
These drawings to be read
In conjunction with the
Engineering details
Copyright Deslgnright
~t... ~-I-~
~~
~1~~~I’2--
~c+~~
Page 44
~ ~~~~~~
~ --===== ~
.
~.{.::::::N A -
A ~. l
rl~~Dn
~ ~
~
PROJECT
Proposed New Residence
CLIENT
l’4-
2’Z..I~ Mr & Mrs Aitken
18 Tropicana Rise.
CASTAWAYS BEACH
~t-l<!>-+UN"’1o<.
~t:I!W ~1:? Q-l?I~ TITLE
tet",6.l1",
Sections
~
~RL.
19."’}P.7 w~~ ~ DATE
.", 1z:> f"v.Ntaz..
R’’’’’’’~4-F-’Wt1~~~~ ~ April,2013
DRAWN
~"’16-
.
~(a.l -{7 ~’.’1!~..:’f1!" !:>I.P~~
..-
l"I-Y" ~1..1/’l1N&- ~~r~/<&r=f’" ~~ SLR
-
SCALE
8h,~ I-
l-~ -He&
-
DRWGNo.
13AJAOO
~
ISSUE
3>lSOo
Preliminary
Contractor to verify all
dimensions on site prior to
LJV\~ FL~ -Z2 Commencing work
t.e,.e._,. "’" .u.
tP7’> ~
Use figured dimensions in
~ preference to scaling
f’.._~.~-+~ These drawirrgs to be read
-I<<>~~~\,... In conjunction with the
~l"’L.<:z:fl.-~ Errgineering details
~L IS.",~
Copyright Oesignright
/"
I __.....-
__.....-
...-
./
~~""UHI!"~
I
/........-~~~ t.-ll-S
t ,..
Page 45
APPENDIXC DEQ Soil Test Report [OCR of page images] APPENDIX C DEQ Soil Test Report
Page 46
[J1)(l
Design Engineers Queensland
Consulting Engineers
Civil, Structural and Soil Testing
DEO. Consulting Ply Lid Va ABN 53 065 711 248
Job No- 12.2452
Address- LOT 9 (#18 TROPICANA RISE, CASTAWAYS BEACH
The following information is required by our office for the completion of foundation design under the
revised BSA policies. We will hold this job until information is received or advice otherwise is received.
Please return this sheet in addition to all required info, or reason why the info is not applicable to us.
Info received Not applicable
Y N (reason)
SOIL TESTING REQUIREMENTS
The property description and site address- .,/ 0
Contours survey- o .,/
Location of trees on-site and surrounds- .,/ 0
The footprint location of proposed building
with platform levels- o .,/
Location of proposed cut/fill o .,/
FOOTING DESIGN REQUIREMENTS
Proposed building Plan- o 0
Photographs of site- o 0
Location and identification of overland flow- o 0
Land search results (e.g underground service,
flood, easements, subdivisional fill,
vegetation protection)- o 0
Preferred footing system o 0
Means ofdiverting surface
water away from slab o 0
Location of articulation joint in masonry o 0
Site specific details (pool,Zero lot, ect.) o 0
If you have any questions about the revised policies and insurance arrangements that this information is
regarding to please contact the BSA directly. It is our understanding that under the new policy you may
not the covered by BSA insurance if the above information is not provided. It is the responsibility of the
builder to ensure all necessary information is provided to our office as well as to all relevant contractors.
NO.5 Parkview Street, Milton Qld 4064 Phone: (07)33670211 Fax: (07)33670205
ETnai/: soiltestin .
com.au
Page 47
Page 1
OUR REF: 12.2452
DATE: 7/09/2012 mO[!l
TO: CIVIC STEEL HOMES Design Engineers Queensland’
ORDERED BY: KIRSTEN Consulting Engineers
FROM: ROXANNE Civil, Structural and Soil Testing
DEQ Consultlng Ply Ltd Va ABH 53065 711248
ADDRESS: LOT 9(#18)TROPICANA RISE,
FOR CIVIC STEEL USE ONLY
CASTAWAYS BEACH
1. SITE CLASSIFICATION
S- Ys <20
Slightly Reactive 0 H2- Ys60-75
Vel)’ Highly Reactive D
M- Ys 20-40
Moderately Reactive D E- Ys>75
xframely Reactive D
H1- Ys 40- 60
Highly React/ve D P - Problem Site
(ReferBelow) 0
COMMENTS
. P:Due to the presence of low bearing strength in natural dune sands.
. Screw piers are recommended. 75kN working load for single storey, 100kN
working load for double storey.
. Trees within limits outlined in AS2870 were noted at the time ofthis soil test.
No influence to foundations likely.
. Note: Sewer service may exist on this lot.
--------------------------------------------------------------------------------------------------------------------
1. TIllS IS A PRELIMINARY SOIL INVESTIGATION COMMISSIONED BY CIVIC STEEL HOMES FOR TIffiIR
INTERNAL USE ONLY.TIllS REPORT IS FOR TIffiIR COSTING PURPOSES ONLY (NOTFOR DESIGN
PURPOSES).
2. ALLOWANCES SHOULD BE MADE FOR FLEXIBLE CONNECTIONS AND STAINLESS STEEL STRAPS
FOR H,E & P SITES TO COMPLY wrrn ARTICULATED PLUMBING REQUIREMENTS PARTICULARY IN
THE IPSWICH CITY COUNCIL AREA REFER PLUMBER FOR SCOPE OF WORK.
3. 1HE FOLLOWING FOOTING & SLAB PIERING REQUIREMENTS APPLY WHEN ALL NEW FILL PLACED
TO CREATE A LEVEL BUILDING PLATFORM IS COMPACTED IN ACCORDANCE Willi AS.3798 2007
TYPE 2 SMALL SCALE OPERATIONS TABEL 8.1 AND TESTED IN ACCORDANCE Willi AS.1289
4. ALLOWANCES SHOULD BE MADE FOR PIERS TO FOOTINGS ADJACENT TO FILLED RETAINING
WALLS,CANAL EMBANKMENfS,UNDERGROUND SERVICES,POOLS ETC.
No.5 Parkview Street, Milton Qld 4064 Phone: (07)3367 0211 Fax: (07)33670205
Emai/: soiltestin
Page 48
Page 2
OUR REF:
ADDRESS:
12.2452
LOT 9(#18)TROPICANA
RISE, CASTAWAYS BEACH
ml)C!l
Design Engineers Queensland
Consulting Engineers
Civil, Structural and Soil Testing
DEC Coosuttlno Ply LId Va ABN 53065 711 248
2. IS EXISTING FILL PRESENT ? DYes 0No
IS EXISTING FILL> 400mm IN DEPTH DYes oNo Refer Comments above
-
to
DOES FILL APPEAR SUITABLE FOR DYes oNo Refer Pier Requirements below
-
RE-COMPACTION
3. ARE FOOTING PIERS REQUIRED? 0Yes DNo
oSCREW P RS ARE REQUIRED (SEECOMMENTS)
oP RS ARE REQUIRED THROUGH PAD FILL INTO FIRM EXISTING FILL.
oP RS ARE REQUIRED THROUGH ALL FILL AND NATURAL SOILS INTO WEATHERED ROCK.
4. ARE SLAB PIERS REQUIRED? oYes DNo
oSCREWP RS ARE REQUIRED (SEECOMMENTS)
oP RS ARE REQUIRED THROUGH PAD FILL INTO FIRM EXISTING FILL.
D P RS ARE REQUIRED THROUGH ALL FILL AND NATURAL SOILS INTO WEATHERED ROCK.
s. TREES OF POTENTIAL FOUNDATION INFLUENCE -
See Comments
DN/A oNOTED ON SITE G NOTED ON ADJACENT SITE
TO REMAIN, AN EXPERT ARBORIST SHOULD BE COMMISIONED TO
D IF EXISTING TREES AREROOT BARRRS OR OTHER PHYSICAL METHODS ARE REQUIRED
ASCERTAIN WHETHER
6. WIND CLASSIFICATION
DN2(W33N) 0N3(W41N) DN4(WsON)
No.5 Parkview Street, Milton Qld 4064 Phone: (07)33670211 Fax: (07)33670205
Email: soiltestin.com.au
Page 49
Page 1
SITE PHOTOGRAPHS
OUR REF: 12.2452
DATE: 6/09/2012
mom
Consulting Engineers
ADDRESS: LOT 9(#18)TROPlCANA
Civil, Structural and Soil Testing
RISE, CASTAWAYS BEACH MKR Ply Lid Va ABN 53065 711 248
NO.5 Parkview Street, Milton Qld 4064 Phone: (07)33670211 Fax: (07)33670205
Email: soiltestine.com.au
Page 50
BORE LOGS
PENETROMETER (O.c.P) OO~r:;.;
oO~r.r; :t: .o:~:
’,.,..
"
No. OF BLOWS HOLE 1 HOLE 2 .:~
"
’;il~,.f
[’:" .,’ ~y :’-j:
00 200 1 1
- .
:’;l
::~ .’\
SITE SKETCH (N.T.S’)
200 400 2 2
.
,
:.~.I.:;’:
-
;~ ~..., C" .~:.
~! ’,’.
400 - 600 3 2 t: t~’ ....: :’:’
APPROX.
’,:: .,~. MAlllRAL LINE
600 - 800 3
3
2
2
:r~~ ~~ f~ SILTY SAND SE~ER
800 1000 ~t::t LT r ,
t"; ~<’
-
---
;_;. t.; :’: -GREY, --
- -
1000 1200 3 3 ,
-
.:. "0 ~...r,,’ J/MOIST, LOOSE.
." ~. "", .
1200 - 1400 .:’’’c
..:’ ;:’
~s. r. W
1400 - 1600 ’.~ ....:
~’., ...... ’:’ ~: 0 0
1600 - 1800
~~ .\:
’" ’"
1000~~
~"".
\ \2uti. BH 2
1800 2000
;... :.~
~
-
’:~ .~. ._. II
2000 2200 I.~
:.. .
.
,.J ....
-v
SILTY SAND
o
-
~.~ .... ~.
:..;; ’" OCP 3
2200 2400 ~: .:-: LT-GREY,
-
:.~
to’
. .
41 . .
2400 -
2600
’.
~’.~ .:! J/MOIST, LOOSE TO M-DENSE. OCP 2
I
:~:.: HAlllRAL ~~ :olio . >-
2600 -
2800 .~, ~, SILTY SAND ....h.
~:’ ’t\ LT -GREY, 1500L,;J8
2800 - 3000
....
"
"
...
....: J/MOIST, LOOSE TO Ii-DENSE.
BOREHOLE 2
EMQ QE HAND AU~EB 0 J
PENETROMETER ID.C.PJ
...~ .~
~..’: .....:
;~
~~ ...’. .<
,.
t
0/8
0
B~ 2m
V
No. OF BLOWS HOLE 3 HOLE 4 "
,,\r
,,’
00
200
-
200
400
1
2
{,
II
..
.,’ ..’
;.. ::?
"
.
’---
~1 ~.~ Z
7\
-
........":
400 - 600 3 ~~; TROPICANA RISE
600 - 800 2 ~ .:~
., ..
800 - 1000 2 ~." :.;
I~’I :~.
1000 - 1200 3
.’.~ ".
IIlUo. TREES WITHIN LIMITS OUTLINED IN AS2870
"
..
1200 - 1400 .\
.
.
:.
.
i..i ’1 WERE NOTED AT THE TIME OF THIS SOIL TEST.
1400 - 1600
NO INFLUENCE TO FOUNDATIONS LIKELY.
1600 - 1800 ~:.,’ .:.~:
’I
1800 - 2000 ~:;’
;’i:
2000 - 2200 ’4" .:
2200 - 2400
.....:...:
3000"::’ ~ BORE TERMINATED I ESTIMATED Ys (mm) I <20 I
2400 2600
BOREHOLE 1
-
2600 - 2800
SCALE N.T.S DATE
2800 - 3000 5 Parkvlaw Street SOIL TEST RESULTS
D I)[] Milton Qld. 4064
P: (07) 3367 0211
DRAWN RL 06/09/12
F: 107) 3367 0205 LOT 9 (#18) TROPICANA RISE 12.2452 G01
NOTE: Consulting Engineers E: structuralctdeq.com.au
JOB No. DRG. No.
ALL DIMENSIONS SHOWN CIvIl, Structural arxI Soil Testing E: c!vilctdeq,com.au CASTAWAYS BEACH
ARE APPROXIWATE ONLY. E: solltestlngctdeq.com.au CHECKED SHEET 1 OF 1
I)(Q C..trt Ply Lid 1/. AlII 53 "5 711 2"
[OCR of page images]
q BYE tvs >
PENETROMETER (D.C.P) BORE LOGS _
No. OF BLOWS| HOLE 1 | HOLE 2
00 - 200 1 1
200 - 400 2 2
400 - 600 3 2
600 - 800 3 2
3 2
3 3
SITE SKETCH _(N.T.S.)
APPROX.
SEWER LINE
800 - 1000
1000 - 1200
1200 - 1400
1400 - 1600
1600 - 1800
1800 - 2000
2000 - 2200
2200 - 2400
2400 - 2600
2600 - 2800
2800 - 3000
PENETROMETER (D.C.P)
No. OF BLOWS] HOLE 3 | HOLE 4
00 - 200 1
200 - 400 2
400 - 600 3
600 - 800 2
2
3
T-GREY,
/ MOIST, LOOSE.
1000}
ESSILTY SAND
4LT-GREY,
/MOIST, LOOSE TO M-DENSE.
egg Lutes
900
BOREHOLE 2
LT-GREY,
J/MOIST, LOOSE TO M-DENSE.
TROPICANA RISE
800 - 1000
1000 - 1200
1200 - 1400
1400 - 1600
1600 - 1800
1800 - 2000
2000 - 2200
2200 - 2400 ety
2400 - 2600 3000~~™ BORE TERMINATED ESTIMATED Ys (mm) <20
BOREHOLE 1
2600 - 2800 ee
WERE NOTED AT THE TIME OF THIS SOIL TEST.
NO INFLUENCE TO FOUNDATIONS LIKELY.
\
c
NOTE: TREES WITHIN LIMITS OUTLINED IN “at
cr
2800 - 3000 arkview Stree SCALE N.T.S DATE
DOGO wee |f sm usrasuis | fete honor
NOTE: Consulting Engineers —_-F (071 3367 0205 LOT 9 (#18) TROPICANA RISE 12.2452 G01
ALL DIMENSIONS SHOWN Civil, Structural and Soil Testing tan CASTAWAYS BEACH JOB No. DRG. No.
DEO Consulting Ply Lid t/e ABN 53 065 7H 248 Es [email protected] | CHECKED SHEET 1 OF 1
~
ARE APPROXIMATE ONLY.
,
Page 51
APPENDIX D
Examples of Good and Poor Hillside
Practice and Guidelines for Hillside
Engineering
Page 52
EXAMPLES OF GOOD HILLSIDE PRACTICE
Sulfate water Interc:.pltOn dralna~. .
,
Watertight adequotely.ftad ondloundlld
100’waler 610tl1g1) I3flk$ ’.....,th due legard f<>t
Impact 01 enl)n!1c.3Moa)
flexible sttUelllle
Roof wnter PIPe 011 ,Ito or siDrod
011.$110 dewnllOIl ranks WIlleltlOn’ Md
adeQ\l8tely rounded POICln~’’oakllga
managed by 5ub-W11 drelns
\
,
,
._ MANTJ..E OF 801L ANII ROCK
\ FRAGM T$ (COLLUVIUMJ
,
\
-
Pler foolings Inlo ro<:k
-Sl,Ibsoildrlllnagamaybe
\ reql.led ’n slop!!
Cllttlllg end m~’19 mfntmiGOO In dOVClOpnWlt
-
Sewage efflUent ed OUl Of (Q!Ineeted 10 sewer
’fOtlks adequatoly foundQd (I,;w..ltcrilghL PotOClIJ3I
Icalge mon{lOd by suWOll dr&\1’I$
IlEDROCK
.Engineered l’lalnlng waUs WIth both surfa and
s\lbSur!bee dralf1age (COIl1truttOd before dw,Ulng)
EXAMPLES OF POOR HILLSIDE PRACTICE
UnstllbtllStil _Ii !oWl"
and Itavllls do...’fIslo~ "\
\’(,~11l mm -,
~rg of _IWnW ,lt SICP UlUupponocl ’
’
/.
l/jW~y I’ItIler l lln I;OI\QIICIJ!d 011
~It~ or 10 Secun> .,Ol1lpt IQr f..u ~
anf’U, -
.l~’’_
~
.
S1ruduIo unable to IOIot"t.
::::’:::d<a ~ \
-1.’.~:
Poodyc
unDV1"nIy I!nd C’J’IIOO pool
. ,- ~.
\ ~\ ~\
___~~
:-F)i
l
loose,.
=-~-"-
lUlitell fhLde5
’i
,’I
’\
\\ ";. ..,..
’
J
;
~~..:<..:::;’;:
""’-
~ r ’ -
, T"1 \. 87"5 "/?’
-’
..-l ~$dcMmtoPt
tnadeqlJlllely wpporIed tutlatls l .), r ..~-.....~’ -.f.:{.""
ROOft’lollOf Inlt lilt.. r.JOpe
I
tt,C’ ~NfUj ... -
’
SalOtltfed
slapefJIIIs \
~
~
OF SOIL" r
ROC/!FRAGMEIITS :\’\. f
~
" t ~ _
(COLLWI!JAlj,_
Vt’odllllQn
~ F../ ~,’1="r- Dwlllin~ l1Ol’OIInded I" !led1’O(:l(
\ ~~ -~_ h~ W>ROCK
’::::’ l’ ~~ -
;/
~ ~.......~L-- ’\ -~..
"__All4enI;eof subtIo. dmlN!Je y"lIvn ’,8
~ _ .....---- \.
’--Ponded WiJtor onlOlll $lond iJt"I3nd’ldll
~ POIislble I~~
.
w"’d\ 1InpaI:W CllMJlI ~
This figure Is an extract from PRACTICE NOTE GUIDELINES FOR LAND SLIDE RISK MANAGEMENT as presented In
Australian Geomechanlcs Journal and News, Volume 42, No 1, March 2007,which discusses the matter more fully.
Page 53
SOME GUIDEUNES FOR HILLSIDE CONSTRUcrION
GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL Obtain advice from a qualified, experienced geotechn al practitimer at early Prepare detailed plan and start site works before
ASSE’>SMENT e of I ann
.
and before site works. technical advice.
PLANNING
SITE PLANNING Plan development withoot regard for the Risk.
Use flexible structures wlch incorponte properly designed brickwork, timber Floor plans which require extensive cutting and
or sted frames.timber er panel cladding. fling.
HOUSE DESIGN
Cmsider use ofsplit levels. Movement Bolerant structures.
Use decks for recreational areas where appropriate.
SITE CLEARING Retail natural velletatim wherever practicable. Indiscriminatelv clear the site.
ACCESS &. SatisfY requirements below for cuts. fiUs. retaining walls and drainage. Excavate and fill fer site access before
DRIVEWAYS CoonciJ specificatims for grades may need to be modified. geotechnical advice.
Driveways and paJiting areas may need to be fully suppated m piers.
EARTHWORKS Retail nalUra! contoors wherever possible. IndiscriminatttY bulk earthworks.
M imise depth. Large scale cuts and benching.
Suppcrt with engineered retaining walls or batter to sppropriate slope.
CUTs
Provide ~~measures and eT05im control. unsu,;~~’
l.Iln<ie- .
reauiremenl3
e
Minimise height Loose or poaiy compacted fill. wlch if it fals.
Strip vegetatim and topsoil and key into natural slopes prier to fining. may flow a considerable distance including
Use clean fill materials and compact to engineering standards. mto property below.
FlLI Batter to appropriate slope or suppcrt with engineered retaining wall. Block natural drainage tines.
Provide surface drainage and appropriate subsurl’acc dranage. Fill over existing vegetation and topsoil
Include slUmps, trees. vegetation, topsoil,
boolders. buildinll rubble etc in fiU.
ROCK OUTCROPS Remove or stabilise boulders wlch may have unacceptable risk. Distwb or undercut detached blocks or
&.BoUWERS SuPpcrt rock faces where necess .
boolders.
Engineer design to resist applied soil and water forces. Construct a structurally inadequate wall such as
Found m rock where practicable. sandstme flagging. brick or unreinforced
RETAINING
Provide subsurface drainage within wall backfill and surface drallBe on slope blockwork.
WAILS Lack ofsubsurface dra and weep holes.
above.
Cmstruct wall as som as possible after cut/fill operatim.
Found within rock where practicable. Fomd m topsoi~ loose fill. detached boulders
Use I’OWB ofpicrs or strip footings oriented up and down slope. or undercut cliffs.
FOOTINGS
Design for lateral creep pressures ifnecesS8l)’.
Backfill foOl excavations to exclude ingress of surface water.
Engineer designed.
Suppcrt on piers to rock where practable.
SWIMMING POOLS Provide with mder-drainage and gravity dran ootlct where practicable.
Design for high soil pressures wlch may develop on uphill side wllst there
may be little <X’ no lateral suoocrt m downhi1lside.
DRAINAGE
Provide at tops of cut and fill slopes. Discharge at top offills and cuts.
Discharge to street draagc or natural water coorses. Anow water to pond m benh areas.
SURFACE Provide general falls to prevent blockage by s tatim and incorporate silt traps.
Line to minimise infiltration and make flexible where possible.
Soccial structures to dissiDate energy at changes of slope and/or dircctim.
Provide filter aroond subsurface drain. Discharge roofrunoff into absOIJItim trenches.
Provide dran behind retaining walls.
SUBSURFACE
Use flexible pipelines with access for maintenance.
Prevent inflow of surface water.
Usually requires pump-out or mains sewer systems; absorptim trenches may Discharge sullage directly onto and into slopes.
SEPTIC &.
be possible il some areas ifrisk is acceptable. Use absorption trenches without cmsideratim
SU"U.oAGE
Storaae tanks shoold be water-tillht and adequately founded. oflandslide risk.
EROSION Cmtrol erosim as this may lead to instability. Failure to observe earthworkI and drae
CONTROL&. Revegctate cleared area. recommcndatims when landscaping.
LANDSCAPING
OWNER’S Clean drainllBe systems; rep8 broken joints in drains and leaks in supply
RESPONSffiIIlTY pipes.
Where structural distress is evident scc advice.
Ifseepaae observed, determine causes <X’ seek advice on cmsequences.
Page 54
./ ,/ [OCR of page images] ATTACHMENT D ~ Architectural Drawings
Used in these records
About this file
- File size
- 27.9 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.