                   SOME GUIDEUNES FOR HILLSIDE CONSTRUcrION


                   GOOD ENGINEERING PRACTICE                                                          POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL       Obtain advice from a qualified, experienced geotechn al practitimer at early       Prepare detailed plan and start site works before
ASSE’>SMENT            e of I ann
                                 .


                                   and before site works.                                                 technical advice.

PLANNING
SITE PLANNING                                                                                         Plan development withoot regard for the Risk.




                   Use flexible structures wlch incorponte properly designed brickwork, timber        Floor plans which require extensive cutting and
                   or sted frames.timber er    panel cladding.                                        fling.
 HOUSE DESIGN
                   Cmsider use ofsplit levels.                                                        Movement Bolerant structures.
                   Use decks for recreational areas where appropriate.
SITE CLEARING      Retail natural velletatim wherever practicable.                                    Indiscriminatelv clear the site.
   ACCESS &.       SatisfY requirements below for cuts. fiUs. retaining walls and drainage.           Excavate and fill fer site access before
  DRIVEWAYS        CoonciJ specificatims for grades may need to be modified.                          geotechnical advice.
                   Driveways and paJiting areas may need to be fully suppated m piers.
EARTHWORKS         Retail nalUra! contoors wherever possible.                                         IndiscriminatttY bulk earthworks.
                   M   imise depth.                                                                   Large scale cuts and benching.
                   Suppcrt with engineered retaining walls or batter to sppropriate slope.
      CUTs
                   Provide ~~measures and eT05im control.                                             unsu,;~~’
                                                                                                      l.Iln<ie-   .

                                                                                                              reauiremenl3
                                                                                                                      e

                   Minimise height                                                                    Loose or poaiy compacted fill. wlch if it fals.
                   Strip vegetatim and topsoil and key into natural slopes prier to fining.           may flow    a   considerable distance      including
                   Use clean fill materials and compact to engineering standards.                     mto property below.
     FlLI          Batter to appropriate slope or suppcrt with engineered retaining wall.             Block natural drainage tines.
                   Provide surface drainage and appropriate subsurl’acc dranage.                      Fill over existing vegetation and topsoil
                                                                                                      Include   slUmps, trees. vegetation, topsoil,
                                                                                                      boolders. buildinll rubble etc in fiU.
 ROCK OUTCROPS     Remove or stabilise boulders wlch may have unacceptable risk.                      Distwb or       undercut   detached   blocks     or

   &.BoUWERS       SuPpcrt rock faces where necess      .
                                                                                                      boolders.

                   Engineer design to resist applied soil and water forces.                           Construct a structurally inadequate wall such as
                   Found m rock where practicable.                                                    sandstme flagging. brick or unreinforced
   RETAINING
                   Provide subsurface drainage within wall backfill and surface drallBe on slope      blockwork.
    WAILS                                                                                             Lack ofsubsurface dra and weep holes.
                   above.
                   Cmstruct wall as som as possible after cut/fill operatim.
                   Found within rock where practicable.                                               Fomd m topsoi~ loose fill. detached boulders
                   Use I’OWB ofpicrs or strip footings oriented up and down slope.                    or undercut cliffs.
   FOOTINGS
                   Design for lateral creep pressures ifnecesS8l)’.
                   Backfill foOl excavations to exclude ingress of surface water.
                   Engineer designed.
                   Suppcrt on piers to rock where practable.
SWIMMING POOLS     Provide with mder-drainage and gravity dran ootlct where practicable.
                   Design for high soil pressures wlch may develop on uphill side wllst there
                   may be little <X’ no lateral suoocrt m downhi1lside.

   DRAINAGE
                   Provide at tops of cut and fill slopes.                                            Discharge at top offills and cuts.
                   Discharge to street draagc or natural water coorses.                               Anow water to pond m benh areas.
    SURFACE        Provide general falls to prevent blockage by s tatim and incorporate silt traps.
                   Line to minimise infiltration and make flexible where possible.
                   Soccial structures to dissiDate energy at changes of slope and/or dircctim.
                   Provide filter aroond subsurface drain.                                            Discharge roofrunoff into absOIJItim trenches.
                   Provide dran behind retaining walls.
   SUBSURFACE
                   Use flexible pipelines with access for maintenance.
                    Prevent inflow of surface water.
                    Usually requires pump-out or mains sewer systems; absorptim trenches may          Discharge sullage directly onto and into slopes.
    SEPTIC &.
                    be possible il some areas ifrisk is acceptable.                                   Use absorption trenches without cmsideratim
    SU"U.oAGE
                    Storaae tanks shoold be water-tillht and adequately founded.                      oflandslide risk.
    EROSION         Cmtrol erosim as this may lead to instability.                                    Failure to observe earthworkI and           drae
   CONTROL&.        Revegctate cleared area.                                                          recommcndatims when landscaping.
 LANDSCAPING




    OWNER’S         Clean drainllBe systems; rep8 broken joints in drains and leaks in supply
 RESPONSffiIIlTY    pipes.
                    Where structural distress is evident scc advice.
                    Ifseepaae observed, determine causes <X’ seek advice on cmsequences.

Used in these records

About this file

File size
27.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 3 Report MCU13_0106.pdf · 27.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.