10/0812 SUPERSEDED Negotiated Decision Notice [As Published] · 132010.812
Officer: Jack Lewis
Direct Telephone: (07) 5449 5183
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2010/812
Your Reference: GIR:NR:8976/10
27 October 2010
Altum Constructions
CARE Rigby Lawyers
Suite 8 Noosa Professional Centre
1 Lanyana Way
NOOSA HEADS QLD 4567
Dear Sir
Negotiated Decision Notice
Sustainable Planning Act 2009
I refer to your application and the representations you made in respect to the Decision Notice. On
25 October 2010 Council decided your representations.
Details of the negotiated decision are as follows:
1 APPLICATION DETAILS
Application No: 2010/812
Street address: 20 Tristania Drive MARCUS BEACH
Real property description: Lot 85 M11112
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 12 July 2010 decided to issue the following type of approval:-
Development Permit for Material Change of Use - Multiple Housing Type 2 - Duplex
In relation to representations, Council decided to:
A. Agree to amend Conditions 6 and 15.
B. Issue a Negotiated Decision Notice.
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this development approval is identified in the Assessment Manager
conditions.
Page 1 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
2010/812
4 ASSESSMENT MANAGER CONDITIONS
Planning Assessment
General
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and as
amended by these conditions.
Plan / Document No. Issue. Plan / Document Name Date
0912 - CD 1.01 P6 Site Plan Ground Floor – Middap Ditchfield 2 June 2010
Pty Ltd
0912 - CD 0.04 P2 Easements – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 2.01 P5 Site 20 Ground Floor Plan – Middap 2 June 2010
Ditchfield Pty Ltd
0912 - CD 2.02 P5 Site 20 First Floor Plan – Middap Ditchfield 2 June 2010
Pty Ltd
0912 - CD 2.03 P3 Site 20 Roof Plan – Middap Ditchfield Pty 2 June 2010
Ltd
0912 - CD 4.01 P3 East Elevation – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 4.02 P3 West Elevation – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 4.03 P3 South & North Elevation – Middap Ditchfield 2 June 2010
Pty Ltd
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
4. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
5. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
6. The Development Permit for a material change of use lapses if the use has not happened by
25 October 2014, unless an application to extend the currency is approved by Council.
Building Design
7. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height of 8.0 metres, measures from existing and finished ground level.
8. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
thus remaining as open structures.
9. External colours and finishes of the building shall comprise muted/environmental tones that
blend with the natural environment.
10. Mechanical plant and equipment including pool and spa pumps, pool heaters, air conditioning
units and refrigeration units shall be screened by fencing or with dense vegetation 1.5 metres
Page 2 of 17
Page 3
2010/812
in height. These shall be visually integrated into the line of the building and roof design and do
not project beyond the height or width of the building when viewed from the street or other
properties.
Landscaping
11. The open space and setback areas are to be landscaped in accordance with Council’s
Planning Policy 3 - Landscaping Plants & Guidelines using suitable coastal species and a
properly prepared landscape plan prepared by a suitably qualified Landscape Architect or
Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and
maintained at all times thereafter.
12. The landscape plans required to be submitted are to denote areas of existing vegetation or
existing trees proposed or required to be retained and shall include:
12.1. Native screening vegetation provided within garden beds with a minimum of 500mm
width along the side and rear boundaries;
2
12.2. Exclusive clothes drying areas with minimum dimensions of 25m ;
12.3. Native landscaping to be provided (including the use of large trees equivalent to 60% of
the height of the building on maturity) to screen the southern boundaries of the site with
the adjoining building;
12.4. A minimum of 2 x 45 Litre native street trees shall be established on the frontage within
the road reserve and include the following species:
SMALL STREET TREES IN COASTAL AREAS UNDER POWER LINES
Acronychia imperforata Fraser Island apple
Alectryon coriaceus Beach birds eye
Acmena hemilampra Broad leafed lilly pilly
Banksia aemula Wallum banksia
Banksia integrifolia
Casuarina glauca Swamp sheaok
Elaeocarpus reticulatus Blue berry ash
Eucalyptus bancrofftii Tumbledown gum
Grevillea banksii Red flowering silky oak
Petalostigma pubescens Quinine berry
13. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use.
14. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
14.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
14.2. Disposal for firewood.
14.3. Disposal for landscaping purposes.
14.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
14.5. The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are submitted.
Page 3 of 17
Page 4
2010/812
The Applicant is advised that burning off is an unacceptable method of disposal.
Fencing
15. Front fences and walls are to be setback an average of 1 metre, which is articulated to provide
visual interest by stepping the design at maximum 5m intervals. The area of land between the
fence and the front property boundary shall be densely landscaped to screen any fencing from
the street.
Noise Nuisance
16. Noise emission from mechanical equipment shall comply with the following requirements:
16.1. Air-conditioning and Refrigeration:
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
16.2. Pumps:
7am to 7pm: Maximum background + 5dB(A)
7pm to 10pm: Maximum background + 3dB(A)
10pm to 7am: No audible noise.
17. Submission of written certification shall be provided from a suitably qualified person confirming
that the noise levels from all mechanical equipment comply when measured at either the
residential boundary or outside the most exposed part of an affected building, whichever is the
closest to the equipment.
The assessment and certification is required immediately after installation of the equipment
and prior to any occupation of the building, and in a format approved by Council. All
equipment should be operating at the same time to test the overall noise level created.
Advice: It is highly recommended that the person you engage to certify the installation is
involved at the plan development stage so they can recommend where this equipment is best
located. They can also advise about noise enclosures and can make other suggestions to
avoid noise problems. It is a lot more costly to try and deal with noise problems after
everything is built.
18. Noise from residential building works shall comply with the following –
18.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
18.2. All reasonable measures are taken to minimise noise emissions.
18.3. Not permitted on Sunday or public holidays.
Infrastructure Contributions
19. The applicant must pay contributions towards trunk infrastructure in accordance with the
following Planning Scheme Policies and Council Policies:
(a) Planning Scheme Policy 12 – Public Open Space Contributions;
(b) Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking;
(c) Planning Scheme Policy 16 – Sewerage Headworks Contributions;
(d) Planning Scheme Policy 17 – Water Supply Headworks Contributions;
(e) Planning Scheme Policy 20 – Pathway Trunk Network Contributions;
(f) Council Policy – Rural Roadworks Contributions;
(g) Council Policy – Master Drainage Contributions.
For material change of use of premises approvals the contributions must be paid prior to the
commencement of use, for reconfiguring a lot approval contributions must be paid prior to
Council approval of the plan of subdivision.
Page 4 of 17
Page 5
2010/812
The actual amount of the contribution must be calculated and paid in accordance with the
Planning Scheme Policies and variations due to indexation current at the time of payment.
Operational Works Assessment
Vehicle Access
20. A vehicular access driveway to serve the development on Lots 84 and 85 M11112 (Numbers
22 & 20 Tristania Drive respectively) shall be constructed from the Tristania Drive frontage of
the site generally as shown on drawing number Drawing No CD 1.01 P6 Project No 0912
dated 2 June 2010 by Middap Ditchfield Pty. The first 6m of the driveway measured from the
kerb line in Tristania Drive shall be 5.5m wide to allow for car passing opportunities.
21. The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways be
constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
the driveway be removed and reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
Vehicle Access Easement
22. A reciprocal vehicle access easement shall be created on Lots 84 and 85 M 11112 to
encompass all the proposed driveway and vehicle turning areas generally as shown on
Drawing No CD 0.04 P2 project No 0912 dated 2 June 2010 by Middap Ditchfield Pty Ltd.
In this regard, plans submitted for Operational Works approval shall accurately show the
location of the easement. In addition, the Applicant’s Solicitor shall give Council’s Solicitor an
appropriate undertaking in writing that the Title Deed and the easement documents will be
lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring
the consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing. Any changes required by Council’s Solicitor must be corrected immediately.
All legal and administration costs shall be paid by the developer.
Car Parking
23. Carparking shall be provided within the site generally as shown on drawing number Drawing
No CD 1.01 P6 Project No 0912 dated 2 June 2010 by Middap Ditchfield Pty Ltd, except as
modified by these conditions.
24. The driveway, garages and carparking areas shall be designed to comply with the provisions
of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the
site in a forward gear in three movements, with a minimum head clearance (headroom) at any
point of 2.3m.
Frontage Works
25. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Tristania Drive frontage of the site in accordance with Planning Scheme Policy PSP03
Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
26. A new 1.5m wide concrete path shall be constructed along the Tristania frontage of the site in
accordance with Council’s design standards and to an alignment that protects any significant
vegetation or any underground services and to smoothly join any existing pathway.
27. All paths, driveways and parking areas associated with this development shall be designed
and constructed to ensure pedestrian safety using non-slip materials, to produce an evenly
graded surface finish, and to be in accordance with the Disability Discrimination Act 1992 and
Australian Standard 1428.1 - Design for Access & Mobility.
Page 5 of 17
Page 6
2010/812
28. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
29. Roof runoff from any new building shall be directed to a rainwater storage system or tank that
is installed within the property to ensure water from the rainwater storage system or tank is
used for external uses (such as watering gardens, irrigation, ornamental ponds, water
features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use
in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
installed in accordance with the Queensland Development Code (QDC) current at the time of
building approval, and shall be part of the plumbing application for approval. The location and
capacity of the tanks shall be clearly shown on the plans submitted for Building Works and
Operational Works approvals and any overflow shall be discharged into the existing
stormwater system (stormwater structure or kerb & channel) at Tristania Drive.
30. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s:
existing drainage system (kerb & channel or/and stormwater structures) in Tristania Drive
generally as shown on drawing No 10031 -2 A dated 20 May 2010 by Ian Bradford. Detailed
plans of the drainage design for operational works shall be prepared by a suitably qualified
and experienced person and submitted to Council prior to obtaining a Development Permit for
Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
drainage system at any one location is 25 litres/second.
31. The applicant shall modify the existing kerb inlet pit on the frontage of the site to a grated inlet
pit.
32. The applicant shall construct a new grated kerb inlet pit upstream of the proposed access
driveway and link to the existing pit by a 375mm RCP pipe.
33. The driveway construction shall cater for a stormwater secondary flowpath over the driveway
and a gap 4m wide and at least 120mm high shall be provided under the rear fence in
accordance with the recommendations of the stormwater drainage investigation report dated
24 May 2010 Ref 0812 by Covington Engineers.
34. The development shall not cause diversion of stormwater or adversely impact on the existing
drainage conditions on adjoining properties or the road reserve.
35. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking areas and the driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
provided on site prior to being permitted to discharge into Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor/gross pollutant trap.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
obtaining a Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council’s records prior to
commencement of the approved use.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
36. All site stormwater drainage shall be by means of a gravity system.
Page 6 of 17
Page 7
2010/812
37. The existing 300mm stormwater drainage pipeline on the site shall be inspected by closed
circuit television (CCTV) prior to the commencement of the civil works on the site, any existing
damage or blockage shall be rectified by the developer prior to the construction of the
driveway. Also, following satisfactory completion of the construction works all new stormwater
pipelines that will be a Council’s asset and stormwater inter-allotment drainage shall be
inspected by CCTV.
CCTV inspections will be carried out by Council's CCTV contractor and arranged by Council.
The developer will be responsible for the full cost of CCTV inspections, including any
additional inspection necessary following defect identification and rectification. This charge is
payable prior to the issue of Operational Works approval and will be determined on the unit
rate basis current at the time of approval.
Service Easements on Lot 85 M11112 (Stormwater)
38. A registered easement shall be required over any stormwater drainage pipes or overland flow
paths within the site that convey stormwater from a Council road. The easement shall be in
favour of Council, be a minimum of 3 metres wide within the site and be located adjacent to
the northern boundary of the subject site.
The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that
the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to
promptly. A duly executed copy of the easement shall be submitted to Council for perusal prior
to the use commencing. Any changes required by Council’s Solicitor must be corrected
immediately.
39. No building or other structure shall be constructed or encroach over an easement.
Earthworks
40. All earthworks (filling or excavation) required on site shall be carried out in accordance with
Council’s Planning Scheme Policy PSP5 – Engineering Design Standards. Filling on the site
shall not cause any additional ponding of water on any adjoining lands or the blockage of, or
interference with, any natural watercourses.
41. Any imported fill to the site may only be from a site licensed with The Environmental Protection
Agency or from a site for which a Development Permit for Operational Works has been issued
approving the export of fill.
42. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
Erosion and Sediment Control
43. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General Engineering Requirements
44. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
submitted in conjunction with any application for Operational Works.
Page 7 of 17
Page 8
2010/812
45. Digital detailed designs including drawings, calculations, specifications and a schedule of
works shall be submitted with any application for a Development Permit for Operational Works
in respect of roadworks and stormwater drainage works. The design shall be in accordance
with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads,
Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing
and proposed services required by the development shall be shown on the plans.
46. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
47. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
48. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
49. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
50. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
type of all services and structures. All of which shall be submitted to Council for checking and
for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au). Approval of works shall not be granted until all As
Constructed information has been supplied and accepted by Council.
Unity Water
51. Reticulated water supply and sewerage must be provided to the development.
52. Separate 25mm PE water services must be installed to a common lot boundary with
independent meters installed outside the boundary of the lot in accordance with Sunshine
Coast water standard drawing SCW 361. Meters must be “Elster” PSM 50100/39 (dual
check).
53. The sewer inspection opening must be located a minimum of 1.0 metre from any structure and
be raised to the finished surface level of the site. If located within the paved driveway area the
inspection opening must be finished with a brass cap.
54. Storm water retention systems and gross pollutant traps must maintain a minimum clearance
of 1.5 metres from Council water supply and sewerage infrastructure .
55. Landscape planting within 1.5 metres of Council sewerage infrastructure must be Council
approved varieties and low growing when mature.
56. Construction works undertaken in the vicinity of Council water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
Page 8 of 17
Page 9
2010/812
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Reason for Relevant Referral Referral Agency Address
Referral Regulation Type Agency
Material change Sustainable Concurrence DERM Department of Environment
of use - Planning and Resource Management
Contaminated Regulation 2009 - Ecoaccess Customer Service
land (unexploded Schedule 7, table Unit
ordnance) 3, item 11 PO Box 15155
CITY EAST QLD 4002
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following table:
Plan / Document No. Issue. Plan / Document Name Date
0912 - CD 1.01 P6 Site Plan Ground Floor – Middap Ditchfield Pty 2 June 2010
Ltd
0912 - CD 0.04 P2 Easements – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 2.01 P5 Site 20 Ground Floor Plan – Middap Ditchfield 2 June 2010
Pty Ltd
0912 - CD 2.02 P5 Site 20 First Floor Plan – Middap Ditchfield Pty 2 June 2010
Ltd
0912 - CD 2.03 P3 Site 20 Roof Plan – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 4.01 P3 East Elevation – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 4.02 P3 West Elevation – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 4.03 P3 South & North Elevation – Middap Ditchfield Pty 2 June 2010
Ltd
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
General
1. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
2. The development should be undertaken in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
emissions in accordance with the nuisance provisions of the Environmental Protection
Regulation 1998 or Council’s Local Law No. 12 – Control of Nuisances.
Page 9 of 17
Page 10
2010/812
3. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
where it could reasonably be expected to move into a roadside gutter, storm water drain or a
watercourse. On the spot fines apply for such offences.
4. The applicant is advised that a Compliance Permit for all plumbing and drainage works within
the boundaries of the development site shall be obtained from Council’s Plumbing Services
Section prior to obtaining a Development Permit for Building Works.
5. It is recommended that applications for Operational Works for permit 2010/0811 on Lot 84
M11112 and permit 2010/0812 on Lot 85 M 11112 should be combined.
Water & Sewerage
6. Connection to Council live water mains must be undertaken by Council at the applicants cost.
7. Water meters must be located on alternative boundaries to power boxes.
8. Water meters approved for use in the Sunshine Coast region may be purchased direct from
“Elster” and installed by the developer, or Council can provide the meters and undertake the
works. Meters must be “Elster” PSM 50100/39 (dual check). Council's quotation for the works
will be prepared upon request.
Infrastructure Contributions and Infrastructure Charge
9. An advice notice outlining the estimated infrastructure contributions payable and the basis for
their calculation under the current Planning Scheme Policies and Council Policies is attached
with this Development Permit.
10. The applicant is informed that this development permit will trigger an Infrastructure Charge in
accordance with the Coastal Major Road Network Infrastructure Charges Plan for the
estimated amount of $4,174.00 and is subject to variations in the Consumer Price Index, All
Groups Brisbane from March 2010 until the date of payment. An Infrastructure Charge Notice
will be issued in accordance with Chapter 8 of the Sustainable Planning Act 2009.
11. Please contact Council's Infrastructure Charges Officer (email:
[email protected]) a minimum of 5 business days prior to payment of the
infrastructure contributions and/or charge notice so a payment advice detailing the amounts
applicable at the time of payment may be issued to accompany the payment.
12. Payment of infrastructure contributions and/or infrastructure charge notices will not be
accepted by credit card transaction.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable.
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable.
Page 10 of 17
Page 11
2010/812
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit Operational Works for Access and Carparking,
Stormwater Drainage, Frontage Works, Landscaping,
and Erosion & Sediment Control
Development Permit All Building Works
11 SELF ASSESSABLE CODES
Not applicable.
12 SUBMISSIONS
Not applicable.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable.
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Sustainable Planning Act 2009 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a “negotiated decision notice” will be
issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal
period, which will commence again from the start the day after you receive a “negotiated decision
notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing
decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act
2009.)
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Tracy Jones
Senior Development Planner
Enc: Appeal Rights
Referral Agency Response
c.c: Department of Environment and Resource Management
Ecoaccess Customer Service Unit
PO Box 15155
CITY EAST QLD 4002
Altum Constructions
PO Box 2
PEREGIAN BEACH QLD 4573
Page 11 of 17
Page 12
2010/812
Referral Agency Conditions
SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
REGULATION 2009
Page 12 of 17
Page 13
2010/812 Page 13 of 17 [OCR of page images] 2010/812 BS .. see Notice Concurrence Agency Response 3. General advice to assessment manager Pursuant to sections 334 and 363 of the Act, a copy of a decision notice or negotiated decision notice issued by the assessment manager must be forwarded to DERM as a referral agency for the relevant application at: Permit and Licence Management Implementation and Support Unit Department of Environment and Resource Management GPO Box 2454, Brisbane QLD 4001 and an electronic copy to [email protected] State's Native Title Work Procedures provide that responsibility for assessment of native title issues for an IDAS application rests with the assessment manager. Therefore, DERM as a referral agency for the relevant application has not provided notifi ation to.native title parties eater ets Ry ab eR nine at 4. Additional information for applicants Contaminated Land: It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land becomes aware of a Notifiable Activity (as defined in Schedule 3 and Schedule 4 of the Environmental Protection Act 1994) is being carried out on the land, or that the land has been, or is being, contaminated by a hazardous contaminant, the owner or occupier must, within 22 business days after becoming so aware, give written notice to DERM. 5, Reasons for inclusion of development condition/s or refusal (in accordance with section 289 of the Sustainable Planning Act 2009 and section 278 of the Acts Interpretation Act 1954, a concurrence response must include reasons for a refusal or for the inclusion of development conditions.) The site (the subject lot/s) is part of an area of land within which the Department of Defence (Defence) has . assessed a ‘substantial’ risk of residual UXO contamination exists. Visit the Defence website http://www.defence.gov.au/uxo/ for details. Defence advises that development or land use rezoning proposals for land within a ‘substantial’ zone should only proceed fallowing the conduct of UXO investigation and clearance activities. Defence maintains a list of commercial UXO investigation and remedial search contractors that it accredits to carry out this work. Defence also recommends that owners or occupiers of potentially affected land and workers and contractors employed on the land need to be aware of the procedure if a suspect object is found. As DERM has no record of the site being further investigated or remediated, it is considered that there remai a possibility of UXO being found onit. , 1 Ranald Scot ——OSOs=~S~S Delegate, Chief Executive administering . Enquiries: the Sustainable Planning Act 2009 . Ranald Scott Department of Environment and Resource Management DERM (DERM) . Level 1, The Esplanade, Maroochydore QLD : . PO Box 168, Cotton Tree, QLD 4558 30 June 2010 Phone: 075459 6129 Fax: 07 5443 9927 - Email: [email protected] 2Attachment::Co: Bie LL. RA Tete -. 5 & Res. nd . Cath > Dr ee Oe Bie. ~ de | ~ Page’2 of 4+ 091217 Department of Environment and Resource Management Page 13 of 17
Page 14
2010/812 Page 14 of 17 [OCR of page images] 2010/812 a Notice——__. Concurrence Agency Response CONDITIONS The following concurrence agency conditions are to be attached to any approval: 1 Prior to the commencement of any development-related excavation, earthworks or soil disturbance, that part of the site to be so worked is to be subjected to investigation and, where necessary, appropriate remedial action. 2: Any person employed to work on any part of the site where Condition 1 has not been satisfied is to. be forewarned in writing by the applicant. This warning is to explain that information available to DERM indicates a potential for residual UXO exists on the site-and work Should proceed .with-due. caution: ‘It is-to-state-the- procedure-to be: ~ followed by any person finding an object suspected of being explosive ordnance or component thereof: Do not disturb the object. Take action, where appropriate, to prevent ‘it being disturbed by another person. Note its approximate dimensions and general appearance. Note the route to its !ocation. Advise the Police as soon as possible. 3 Following investigation and any remedial action taken to-satisfy Condition 1 above, the applicant is to submit a report, prepared in accordance with current guidelines, to DERM for assessment. DERM is to subsequently advise the Sunshine Coast Regional Council and the applicant of its assessment in regard to Condition 1 being satisfied. 4 Prior to Condition 3 being satisfied, no excavated gravel, rock, sand or soil is to be removed from the site without written DERM approval. 5 The applicant is to advise the owner and any occupier of the site of the above responsibilities. - General comments or advice about applications concerning land potentially affected by UXO Applicants may. contact DERM'’s Project Manager (UXO) or visit Defénce’s website http://www.defence.gov.au/uxo/ for the details of current UXO investigation and remedial search contractors. DERM accepts reports based on investigative and remedial work carried out by these contractors. Investigation and remedial action to satisfy Condition 1 typically involves sampling/search programs with detection equipment unless the use of such equipment is: * considered unwarranted by a UXO contractor due to the extent of any prior excavation or earthworks or, conversely, of any filling proposed as part of the development program; or * prevented or made impracticable by the presence of a structure, stockpile, natural barrier or metal waste. In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For example, where the risk of exposure to any UXO that may exist is reduced by the presence of a structure or natural barrier, issuance of the standard UXO warning (see Condition 2) may suffice white the structure, -eStockpile or barrier.remains in:place..Where.a:structure is.to;be removed or reduced as part of the «development program, protective'precautions, commensurate with any greater risk to which workers might Page 3 of 4+ 091217 . Department of Environment and Resource Management Page 14 of 17
Page 15
2010/812 Page 15 of 17 [OCR of page images] 2010/812 "y ‘ Notice ' Concurrence Agency Response then be exposed, may need to be considered. Progressive assessment will be necessary where. such * circumstances exist. Unless, at the completion of preliminary works, there is evidence then available to the “UXO contractor that any residual risk is negligible, the use of detection equipment will typically be required to confirm the site's status. . Where investigation, along with any subsequent remedial action and assessment, is to be implemented by stages to satisfy Condition 1 and 3, a preliminary investigation report should be submitted by the applicant to DERM along with a management plan for the proposed work. Staged investigation/remediation is most likely to be applicable where development of smaller, built-on lots (which can present circumstances such as those - discussed above) or broadhectare sites is proposed. In such cases, DERM's assessment of the report and \ advice to Council in regard to approval of the development will be dependent on agreement with the management plan. Where Condition 1 is to-be satisfied by a whole lot or broadhectare development stage being subjected to investigation and any necessary remedial action, DERM, based on the subsequent investigation/remediation report's findings and recommendation/s, may reassess the lot, or that portion comprising the development stage, as being remediated or not needing remediation, and advise the applicant and Council accordingly. Otherwise, any balance of land that has not been further investigated will retain the risk assessment made by Defence and DERM's Area Management Advice will continue to apply. This is unless evidence obtained from the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the balance. In the latter case, DERM may reassess all of the balance or the applicable part/s as being unaffected by UXO. END OF CONDITIONS . ¥ ’ % % a wae 7 oe ws Roe Page 4 of 4 + 091217 Department of Environment and Resource Management. Page 15 of 17
Page 16
2010/812
Appeal Rights
SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
REGULATION 2009
The following is an extract from the Sustainable (ii) the length of a period mentioned in
Planning Act 2009 (Chapter 6). section 341 for the approval.
(3) However, a submitter may not appeal if the
MATERIAL CHANGE OF USE, RECONFIGURING A submitter—
LOT & OPERATIONAL WORKS
(a) withdraws the submission before the
Division 8 - Appeals to court relating to application is decided; or
development applications
(b) has given the assessment manager a
461 Appeals by applicants notice under section 339(1)(b)(ii).
(1) An applicant for a development application (4) The appeal must be started within 20
may appeal to the court against any of the business days (the submitter’s appeal
following- period) after the decision notice or
(a) the refusal, or the refusal in part, of a negotiated decision notice is given to the
development application; submitter.
(b) any condition of a development approval, 463 Additional and extended appeal rights for
another matter stated in a development submitters for particular development
approval and the identification or inclusion applications
of a code under section 242 (1) This section applies to a development
(c) the decision to give a preliminary application to which chapter 9, part 7
approval when a development permit was applies.
applied for; (2) A submitter of a properly made submission
(d) the length of a period mentioned in for the application may appeal to the court
section 341;; about a referral agency’s response made by
(e) a deemed refusal of the development a prescribed concurrence agency for the
application. application.
(3) However, the submitter may only appeal
(2) An appeal under subsection (1)(a), (b), (c) or
against a referral agency’s response to the
(d) must be started within 20 business days
extent it relates to—
(the applicant’s appeal period) after—
(a) if a decision notice or negotiated decision (a) if the prescribed concurrence agency is
notice is given—the day the decision the chief executive (environment)—
notice or negotiated decision notice is development for an aquacultural ERA; or
given to the applicant; or (b) if the prescribed concurrence agency is
(b) otherwise—the day a decision notice was the chief executive (fisheries)—
required to be given to the applicant. development that is—
(3) An appeal under subsection (1)(e) may be (i) a material change of use of
started at any time after the last day a premises for aquaculture; or
decision on the matter should have been (ii) operational work that is the removal,
made. damage or destruction of a marine
plant
462 Appeals by submitters - general
(4) Despite section 462(1), the submitter may
(1) A submitter for a development application
appeal against the following matters for the
may appeal to the court only against-
application even if the matters relate to code
(a) the part of the approval relating to the assessment—
assessment manager’s decision about
(a) a decision about a matter mentioned in
any part of the application requiring
section 462(2) if it is a decision of the
impact assessment under section 314; or
chief executive (fisheries);
(b) the part of the approval relating to the
(b) a referral agency’s response mentioned in
assessment manager’s decision under
subsection (2).
section 327.
464 Appeals by advice agency submitters
(2) To the extent an appeal may be made under
subsection (1), the appeal may be against 1 (1) Subsection (2) applies if an advice agency, in
or more of the following— its response for an application, told the
assessment manager to treat the response
(a) the giving of a development approval; as a properly made submission.
(b) any provision of the approval including— (2) The advice agency may, within the limits of its
(i) a condition of, or lack of condition jurisdiction, appeal to the court about—
for, the approval; or
Page 16 of 17
Page 17
2010/812
(a) any part of the approval relating to the 467 Appeals about changing or cancelling
assessment manager’s decision about conditions imposed by assessment
any part of the application requiring manager or concurrence agency
impact assessment under section 314; or (1) A person to whom a notice under section
(b) any part of the approval relating to the 378(9)(b) giving a decision to change or
assessment manager’s decision under cancel a condition of a development approval
section 327 has been given may appeal to the court
(3) The appeal must be started within 20 against the decision in the notice.
business days after the day the decision (2) The appeal must be started within 20
notice or negotiated decision notice is given business days after the day the notice of the
to the advice agency as a submitter. decision is given to the person.
(4) However, if the advice agency has given the For Building Works Only
assessment manager a notice under section 532 Appeals by applicants
339(1)(b)(ii), the advice agency may not
appeal the decision. (1) If—
465 Appeals about decisions relating to (a) a person has been given, or is entitled to
extensions for approvals be given—
(1) For a development approval given for a (i) an information notice under the
development application, a person to whom a Building Act about a decision
notice is given under section 389, other than other than a decision under
a notice for a decision under section 386(2), that Act made by the
may appeal to the court against the decision Queensland Building Services
in the notice. Authority; or
(2) The appeal must be started within 20 (ii) an information notice under the
business days after the day the notice of the Plumbing and Drainage Act
decision is given to the person. 2002 about a decision under
part 4 or 5 of that Act; or
(3) Also, a person who has made a request
under section 383 may appeal to the court (b) a person—
against a deemed refusal of the request (i) was an applicant for a building
(4) An appeal under subsection (3) may be development approval; and r
started at any time after the last day the (ii) is dissatisfied with a decision
decision on the matter should have been under the Building Act by a
made. building certifier or referral
agency about inspection of
466 Appeals about decisions relating to
building work the subject of the
permissible changes)
approval; the person may
(1) For a development approval given for a appeal against the decision to
development application, the following a building and development
persons may appeal to the court against a committee.
decision on a request to make a permissible
(2) An appeal under subsection (1) must be
change to the approval—
started within 20 business days after the day
(a) if the responsible entity for making the the person is given notice of the decision.
change is the assessment manager for
(3) If—
the application—
(a) under the Building Act, a person makes
(i) the person who made the request;
an application other than a building
or development application to a local
(ii) an entity that gave a notice under government; and
section 373 or a pre-request (b) the period required under that Act for the
response notice about the request
local government to decide the
(b) if the responsible entity for making the application (the decision period) has
change is a concurrence agency for the passed; and
application—the person who made the (c) the local government has not decided
request.. the application; the person may appeal
(2) The appeal must be started within 20 to a building and development
business days after the day the person is committee against the lack of the
given notice of the decision on the request decision and for the committee to decide
under section 376. the application as if it were the local
(3) Also, a person who has made a request government.
under section 369 may appeal to the court (4) An appeal under subsection (3) must be
against a deemed refusal of the request. started within 20 business days after the end
(4) An appeal under subsection (3) may be of the decision period..
started at any time after the last day the
decision on the matter should have been
made.
Page 17 of 17
Used in these records