28. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
29. Roof runoff from any new building shall be directed to a rainwater storage system or tank that
is installed within the property to ensure water from the rainwater storage system or tank is
used for external uses (such as watering gardens, irrigation, ornamental ponds, water
features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use
in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
installed in accordance with the Queensland Development Code (QDC) current at the time of
building approval, and shall be part of the plumbing application for approval. The location and
capacity of the tanks shall be clearly shown on the plans submitted for Building Works and
Operational Works approvals and any overflow shall be discharged into the existing
stormwater system (stormwater structure or kerb & channel) at Tristania Drive.
30. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s:
existing drainage system (kerb & channel or/and stormwater structures) in Tristania Drive
generally as shown on drawing No 10031 -2 A dated 20 May 2010 by Ian Bradford. Detailed
plans of the drainage design for operational works shall be prepared by a suitably qualified
and experienced person and submitted to Council prior to obtaining a Development Permit for
Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
drainage system at any one location is 25 litres/second.
31. The applicant shall modify the existing kerb inlet pit on the frontage of the site to a grated inlet
pit.
32. The applicant shall construct a new grated kerb inlet pit upstream of the proposed access
driveway and link to the existing pit by a 375mm RCP pipe.
33. The driveway construction shall cater for a stormwater secondary flowpath over the driveway
and a gap 4m wide and at least 120mm high shall be provided under the rear fence in
accordance with the recommendations of the stormwater drainage investigation report dated
24 May 2010 Ref 0812 by Covington Engineers.
34. The development shall not cause diversion of stormwater or adversely impact on the existing
drainage conditions on adjoining properties or the road reserve.
35. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking areas and the driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap
provided on site prior to being permitted to discharge into Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor/gross pollutant trap.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
obtaining a Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council’s records prior to
commencement of the approved use.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
36. All site stormwater drainage shall be by means of a gravity system.
Page 6 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0812 SUPERSEDED Negotiated Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 297 KB (small file)
- File type
No other editions are linked here.