Skip to the record
Noosa’s premier civic archive.

Council archive · source document

RFI - Appendix F Civil Engineering Report by MPN Consulting · MCU21/0175

of 61

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

Frewo. tO

 

 

 

 

S1301229

 

 

 

seas

  

  
  

© mvcsvianar viercore
O Praveen
Q_reresvizm

© rmsmenener tenons
O extn

 

 

Q — vwwrmsisen
© moist me
© sere car sen

aa eso venom
manor

SoTae fenlvnoute

 

—— eae
Waive

 

 

 

‘pncine ever
Wwatemaure

 

 

 

 

 

 

 

 

 

CD  Prmosey si ma
@ cxsmesumyAUae
Preto ne rian

 

 

 

@ rem uncre
Scorer an

- om

 

 

 

© pustne racer
> xovrsavrnow
®  ovsueto rnc raasrover

O ovemeno rae wv ony)

  

fe sromenaraenve
Notice D evoMEAO HY rEHMETON
evecare
This record provides details of ENERGEX proposed Underground Bsn ommcswrnione
works to be or being carried out in the area of your DBYD request. nsec seroncose
‘The cable voltages detailed may include, Low Voltage, LIKV, 33KV

tr LIOKY Teaneission and Plt (Hlee Opie underground G0; omcrominse
Cables. The details of the underground works plan provided, is for FE prcomacr ims 0801
information only as the works may not be constructed at this time. espsasnicies

[As the details shown on this works plan may differ from the final + samen
construction details, no responsibility is incurred by ENERGEX for

 

the accuracy or completeness of the information provided.
. STREET UT SL LERO

 

 

 

 

 

 

 

 

ENERGEX NON-STANDARD TRENCH DETARS

RE ProroseD paar Lena

EIA bistocsasen

8 pismasse

3G coven ensine seine

C ecowtensmesse
oro a8, ast LATE

‘oan tonureencn

oan ws
& earanns
aha
moon unk ene
@ Seon
‘Gorton seat

Proposed Underground Works Plan Validity eS

rere MN SLP BAKE

 

‘This included proposed works plan has the same period of validity as the ware
Energex maps &Energex response, which is 28 Days. Bee tae

 

 

 

‘The 28 days is effective from the Date of Response on the Energex DBYD
Response Coversheet

Itis the responsibility of the applicant to ensue that valid plans are
maintained for the entire period of the proposed works.

 

PILLAR CENTRED ON PILLAR OFFSET TO ONE
‘SHARED RP BOY SIDE OF SHARED RP BDY

 
  
  
  

 

TO aR ARG GG SORE une WAEMAG MPS Pay 45 THN AEA A 4 THEY DOR CMFLRT MILETMEY SETS
ft natant ACES) Ang RAMTEC

Ess INSTALL NEW GOORVA PMT, TIRV 6 LV CABLE, CONDUITS, PILLARS, PITS &
STREETUGHTS

eV 23 LOT C&l SUBDIVISION:

NOOSA CIVIC
28 EENIE CREEK RD, NOOSAVILLE QLD 4566

Used in these records

About this file

File size
7.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Appendix F Civil Engineering Report by MPN Consulting.pdf · 7.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.