RFI - Appendix F Civil Engineering Report by MPN Consulting · MCU21/0175
'$1301229
Proposed Underground Works Plan Validity
‘This ineluded proposed works plan has the same peziod of validity as the
Energex maps &Energex response, which is 23 Days.
‘The 28 days is effective from the Date of Response on the Energex DBYD
‘Response Coversheet.
Notice Itis the responsibility of the app licant to ensuze that valid plans are
maintained for the entire period of the proposed works.
This record provides details of ENERGEX proposed Underground
works to be oF being carried out in the area of your DBYD
The cable voltages detailed may include, Low Voltage, 1IKV, 3KV
ENERGEX EASEMENT PLAN
Cables The deal ofthe underprund werk plan povided i LAT
‘ ve details of the us in provided, is for INSTALL NEW SOOKVA PMT, 11KV & LV prs &
Infomation enya: the works may net be concrete ie J. S ae
ath dc how on th wk plan my fer he a ed zacor eu svenvston
construction details, no responsibility is incurred by ENERGEX for Noosa civic
the accuracy or completeness of the information provided 28 EENIE CREEK RD, NOOSAVILLE QLD 4566
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix F Civil Engineering Report by MPN Consulting.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.