Council archive · source document
RFI - Appendix F Civil Engineering Report by MPN Consulting · MCU21/0175
16 December 2021 3 SITE CHARACTERISTICS 3.1 Site location The overall Noosa Business Centre site is located at 28 Eenie Creek Road, Noosaville and is formally described as Lot 3 on SP246584. The site is bounded by Walter Hay Drive to the North and East, and existing Commercial developments to the South and West. Figure 2 – Site Location Excellence with Economy in Engineering 6 l:\paige work\8293\16-12-21 civil engineering report_issue d.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix F Civil Engineering Report by MPN Consulting.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.