Original source · versioned page text
Appendix I - Bushfire
Attached to the e-mail Multiple Housing Type 3 Retirement & Special Needs (48 units) - MCU18/0009.
[10]
Specific Outcomes Probable Solutions Response
Siting, design and construction
O7 S7.1 R7.1
Uses and works including building works are sited, designed Uses and works including building works are sited—
The site is greater than 2,500 sq.m. in area.
and constructed to—
a) on lots greater than 2500m2; The proposed development footprint is located in an area
a) minimise the number of people and property subject to i. in locations of lowest hazard within the lot (Figure of Low bushfire hazard, however parts of the
bushfire risk; and 13.5 is omitted for convenience); and development is located within a Potential impact buffer.
b) maximise the protection of people and property during ii. to achieve setbacks from hazardous vegetation of While the nominal width of a Potential impact buffer is
the passage of a fire front. 1.5 times the predominant mature canopy tree 100 metres, the buildings will be setback from the area of
height or 10m whichever is the greater; and medium bushfire hazard (as determined in this report) by
iii. 10m from any retained vegetation strips or small a distance of greater than 50 metres.
areas of vegetation; and Base don the management undertaken within the
iv. so that the elements of the development least Tewantin National park by Queensland Parks and
susceptible to fire are sited closest to the bushfire Wildlife Service, the adjacent area and its inherent fuels
hazard; are managed and as such it is unlikely that a significant
b) on lots 2500m2 or less - to maximise setbacks from bushfire would involved the vegetation within the
hazardous vegetation Tewantin national park and threaten the buildings of
residents or staff within the Carramar Care facility.
Water supply for fire fighting
O8 S8.1 R8.1
An adequate and accessible water supply is provided for fire For premises not in a water service area— each lot has an The development is in a water service area.
fighting purposes can be accessed by fire fighting appliances. accessible dam, swimming pool or water tank accessible by
the fire brigade that contains at least 5000 litres of water
Vehicle access and fire trails
Firebreaks and fire access tracks S9.1 R9.1
O9 Firebreaks are provided by— The proposal is for 6 residential villas and as such the
area around the villas will be open allowing access for
Firebreaks or fire access tracks provide— a) a cleared road reserve not less than 20m wide located
Emergency Services to each building.
around the perimeter of the development;
a) adequate access for fire fighting and other emergency A proposed setback from the area of retained vegetation
vehicles; and OR within the Lomandra Place Bushland Reserve of 14.1
b) adequate width to minimise the risk of fire crossover. metres. While this setback will not be suitable for vehicle
b) fire access tracks between the development and
movement, vehicle movement is available to the
surrounding vegetated lands that—
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original