Original source · versioned page text
Attachment 5 - Environmental Noise Assessment
1.2 Site Layout
The proposed layout is shown on Figure 1.2. Figures 1.3 & 1.4 present the site elevations.
The proposed site will comprise:
➢ two automatic car wash bays and associated mechanical plant located within a plantroom;
➢ two manual wash bays;
➢ two manual super wash bays;
➢ two small dog wash bays;
➢ four covered vacuum bays located on the north eastern property boundary; and
➢ a small take-away coffee shop located adjacent to Opal Street, serving take-away food and
drinks only
It is understood that the hours of operation for the site will be 24 hours per day 7 days per week.
The noise impacts associated with the site include:
➢ The automatic wash bays;
➢ The mechanical plant associated with the site;
➢ Vehicles on site
➢ The vacuum bays;
➢ Manual wash bays; and
➢ Air conditioning and mechanical plant associated with the coffee shop.
Table 1.1 shows the percentage breakdown of useage that has been applied to determine the
appropriate noise levels during the 24 hour operations.
Table 1.1: Percentage Breakdown of Car Wash Usage
Percentage Breakdown of Usage
Noise Source
Day, 7am to 6pm Evening, 6pm to 10pm Night, 10pm to 7am
70 30 15
Automatic wash bays
Manual wash bays 70 30 15
(including super bays)
70 30 15
Vacuum bays
70 30 5
Dog wash bay
Ref: 21030929 - 01a Page 2 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.