Engineering Report
Noosa on Weyba
9 Conclusion
Cardno has carried out an engineering assessment of the bulk earthworks, roadworks, stormwater drainage
and servicing for the development with paramount consideration to environmental protection. The report has
provided an assessment of the suitability of the site for development. In summary, the following conclusions
have been made:
> The development footprint is generally located within the existing cleared areas and minimal additional
clearing will be required. Environmental sensitive design and construction techniques will be used to
avoid impact on retained vegetation;
> Earthworks areas have been minimised to limit the impact on the existing vegetation. Excavation is
generally confined to existing road reserves, proposed roads and the development footprint. Preliminary
bulk earthworks modelling indicates that a balance cut to fill can be achieved, which could potential
reduce impact on the surrounding community and Council roads;
> Significant consideration has been given to the environmental values of the site when determining both
road location and cross sections to minimise disturbance to the natural environment. In general, the
proposed roads are of an environmentally sensitive design and located within existing cleared areas
where the impact on the vegetation can be minimised. Road design incorporates functionality and safety,
whilst minimising the impact on the existing vegetation and recognising the need for fauna crossings;
> The retention of significant vegetation and reduced pavement widths encourage a lower speed
environment whilst providing added safety to pedestrians, cyclists and wildlife;
> Where roads have been located between the Noosa Wildlife Refuge and the environmental protection,
the minimum culvert height has been set at 1200mm,with a width of 2700mm,to allow for the safe
passage of koalas and other animals.
> Upgrades to Hollett Road and Tidswell Road are proposed to provide access points to the development.
These roads are currently unsealed and will require full road reconstruction. The upgrade of existing
Council roads will be undertaken on behalf of Councilor by Council, at an agreed cost to the
development;
> Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the
upmost importance. The proposed WSUD strategy for the site includes community education, large
rainwater tanks, bio-retention basins, vegetated swales and litter baskets;
> The flood study indicates there are no adverse impacts on flood levels and flows for surrounding
properties for local and regional flood events. Flood attenuation is proposed through controlled culverts
and detention basins at various locations. All development areas have sufficient flood immunity in
accordance with SCRC requirements;
> The development provides an improved flood access for neighbouring properties and a reduction in the
100 year ARI event the peak flood level around Lake Entrance Boulevard;
> A sewerage network analysis has been undertaken and determined the development can be
accommodated with external augmentation to Pump Station NVL011 and the Noosa STP. Currently the
Noosa STP is scheduled to be upgraded in December 2015. The assessment indicates connection to the
existing network is possible to the north of the development;
> A conventional gravity sewer network is proposed to service the development. Several pump stations are
required to convey to the flow to the existing network connection points. Alternative servicing strategies
such as the use of low pressure sewers have been considered for this development. It is envisaged that
subsequent development applications may result in alternative servicing strategies;
> A water network analysis has been undertaken and determined that no augmentation of the existing
network is required to accommodate the development. Connection to the existing network is possible to
the north of the development. A network of trunk mains and smaller mains is required internally to
maintain Unitywater’s DSS within the development; and
November 2012 Cardno 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 5 of 37 Appendix 3 - Civil Engineer Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.