                                                                                                  Engineering Report
                                                                                                    Noosa on Weyba




9             Conclusion

Cardno has carried out an engineering assessment of the bulk earthworks, roadworks, stormwater drainage
and servicing for the development with paramount consideration to environmental protection. The report has

provided an assessment of the suitability of the site for development. In summary, the following conclusions
have been made:

>   The development footprint is generally located within the existing cleared areas and minimal additional

    clearing will be required. Environmental sensitive design and construction techniques will be used to
    avoid impact on retained vegetation;

>   Earthworks areas have been minimised to limit the impact on the existing vegetation. Excavation is

    generally confined to existing road reserves, proposed roads and the development footprint. Preliminary
    bulk earthworks modelling indicates that a balance cut to fill can be achieved, which could potential
    reduce impact on the surrounding community and Council roads;

>   Significant consideration has been given to the environmental values of the site when determining both
    road location and cross sections to minimise disturbance to the natural environment. In general, the

    proposed roads are of an environmentally sensitive design and located within existing cleared areas
    where the impact on the vegetation can be minimised. Road design incorporates functionality and safety,
    whilst minimising the impact on the existing vegetation and recognising the need for fauna crossings;

>   The retention of significant vegetation and reduced pavement widths encourage a lower speed
    environment whilst providing added safety to pedestrians, cyclists and wildlife;

>   Where roads have been located between the Noosa Wildlife Refuge and the environmental protection,
    the minimum culvert height has been set at 1200mm,with a width of 2700mm,to allow for the safe

    passage of koalas and other animals.

>   Upgrades to Hollett Road and Tidswell Road are proposed to provide access points to the development.
    These roads are currently unsealed and will require full road reconstruction. The upgrade of existing
    Council roads will be undertaken on behalf of Councilor by Council, at an agreed cost to the

    development;
>   Due to the ecologically sensitive location of the site, appropriate stormwater quality treatment is of the

    upmost importance. The proposed WSUD strategy for the site includes community education, large
    rainwater tanks, bio-retention basins, vegetated swales and litter baskets;

>   The flood study indicates there are no adverse impacts on flood levels and flows for surrounding

    properties for local and regional flood events. Flood attenuation is proposed through controlled culverts
    and detention basins at various locations. All development areas have sufficient flood immunity in
    accordance with SCRC requirements;

>   The development provides an improved flood access for neighbouring properties and a reduction in the
    100 year ARI event the peak flood level around Lake Entrance Boulevard;

>   A sewerage network analysis has been undertaken and determined the development can be
    accommodated with external augmentation to Pump Station NVL011 and the Noosa STP. Currently the
    Noosa STP is scheduled to be upgraded in December 2015. The assessment indicates connection to the

    existing network is possible to the north of the development;
>   A conventional gravity sewer network is proposed to service the development. Several pump stations are

    required to convey to the flow to the existing network connection points. Alternative servicing strategies
    such as the use of low pressure sewers have been considered for this development. It is envisaged that

    subsequent development applications may result in alternative servicing strategies;
>   A water network analysis has been undertaken and determined that no augmentation of the existing
    network is required to accommodate the development. Connection to the existing network is possible to
    the north of the development. A network of trunk mains and smaller mains is required internally to
    maintain Unitywater’s DSS within the development; and




November 2012                                         Cardno                                                     19

Used in these records

About this file

File size
37.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 5 of 37 Appendix 3 - Civil Engineer Report MCU12_0208.pdf · 37.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.