Council archive · source document
Part 5 of 37 Appendix 3 - Civil Engineer Report MCU12/0208
Very large file (37.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 32, section 1. The text section number identifies this passage in the reader.
9
w
OJ
z
Q_
!!!-
::>
()
EARTHWORKS VOLUMES
DA TE WED OCT 17 110133 2012
REPORT FILE BOXING 02 VOL.RPT
-
OVERALL
p-----------I
I
I
EARTHWORKS VOLUMES
DATE
REPORT FILE, BOXING 02 VOL.RPT
-
MON SEP 24 113031 2012
AREA 2
I
I
LEGEND
$
"
-’ I EJl.l CUT
~ VOLUMES FROM TIN "EXIST" TO TIN "BOXING VOLUMES FROM TIN "EXIST" TO TIN "BOXING I
I o -> 05m c:==:::J 0 -> -05m c:==:::J
02" -
(WITH NO PLAN POL YGONI 02" -
(WITH PLAN POL YGON "2"1
>-
<D
I 05 -> 1m c:==:::J -05 -> -1m c:==:::J
::; I
Q_
CUT VOLUMES ARE POSITIVE CUT VOLUMES ARE POSITIVE I 1 -> 1.5m c:==:::J -1 -> -1.5m I I
"’
’" FILL VOLUMES ARE NEGA TIVE I FILL VOLUMES ARE NEGA TIVE
1.5 2m c:==:::J -1.5 -2m c:==:::J
N I -> ->
~ I 2 -> 25m c:==:::J -2 -> -25m -
TOT AL CUT 148684.351 TOTAL CUT 2189.019
2 I
TOT AL FILL -148645.449
I TOTAL FILL -128248.023 > 2.5m _ >-25m -
~ TOT AL BALANCE 38.902 TOT AL BALANCE -126059.005 I
o
Z
N IE EXCESS OF CUT OVER FILL 38.902 I IE EXCESS OF FILL OVER CUT 126059.005
i:i ..._----------
I
~
Ii’ ..------------ ".------------ ..-----------1
w
I EARTHWORKS VOLUMES -
AREA 1 I EARTHWORKS VOLUMES -
AREA 3 I EARTHWORKS VOLUMES -
AREA 4
~ DATE WED OCT 17 110133 2012 I TE MON SEP 24 113031 2012 I DATE, MON SEP 24 11030,31 2012 I
I REPORT FILE, BOXING 02 VOL.RPT
IDA
REPORT FILE BOXING 02 VOL.RPT I REPORT FILE, BOXING 02 VOL.RPT
I I I
I I I
VOLUMES FROM TIN "EXIST" TO TIN "BOXING I VOLUMES FROM TIN "EXIST" TO TIN "BOXING I VOLUMES FROM TIN "EXIST" TO TIN "BOXING I
I 02" -
(WITH PLAN POL YGON ’’1’’1 I 02" -
(WITH PLAN POL YGON "3"1 I 02" -
(WITH PLAN POL YGON "4"1
I I I
I I I
CUT VOLUMES ARE POSITIVE I CUT VOLUMES ARE POSITIVE I CUT VOLUMES ARE POSITIVE I
I FILL VOLUMES ARE NEGA TIVE I FILL VOLUMES ARE NEGA TlVE I FILL VOLUMES ARE NEGATIVE
I I I
I TOTAL CUT 96191187 I TOTAL CUT 44497.738 I TOTAL CUT 5806.403
I I I
TOTAL FILL -14289.272 TOTAL FILL -6018.679 TOTAL FILL -89.472
I I I
TOTAL BALANCE 81901915 I TOT AL BALANCE 38479.059 I TOT AL BALANCE 5716.931 I
I IE EXCESS OF CUT OVER FILL 81901.915 I IE EXCESS OF CUT OVER FILL 38479.059 I IE EXCESS OF CUT OVER FILL 5716.931
..._----------
I ..._----------
I ..._----------
I
BULK EARTHWORKS
LAYOUT PLAN
Scale 1 :2500
~
,g,
o
’_~v~v11
.
(
~o~
bil
<:tJ’~",
0
~~ b~a’
~
g
’"
:z
g
BULK EARTHWORKS
o
LAYOUT PLAN
~ "
Q"I""’___.’? I) Scale 1 :2500
~ BULK EARTHWORKS
LAYOUT PLAN
@ Cardno Umited clienlNORTHBROOK CORPORATION PTY LTO
:r sa
Scale 1 :2500
50 100 150 200 250m
All Rights Reserved.
This document is produced by
Cardno Umited solely for the benefit
0’ and use by thedienl in
accordance wilh the terms oflhe
relair’ler. CardnoUmiteddoesnol
ar’ld shall not aSSl.Jme any
responsibility or liaOility whalsoever
~ Carclno
Shaping the Future
Cardno (Old)Ply Ud I A8N 57 051 074992
Spring1ieldTO’IIef,Level6,14SS;nnalharnl:1yBooie’-iard
NOOSA ON WEYBA
MASTER PLANNING
Status
Datum
A.H.D.
Date
FOR APPROVAL
NOT TO BE USED FOR CONSTRUCTION PURPOSES
Scale
I 12/11/2012 I AS SHOWN I
Size
Al
~ on weyba 50 30 10
SCALE USOO
10 any third party arising OUI 01 any
use orreliarlCEl by lhird party on lhe
conlenlollhisdocumen1.
Spring1ieldCentral,OId4300
f’08c>>c4480,Springfield,Old4300
TeI:073381 0111 Fmc0734701241
Email: [email protected]:www.cardno.com.au
BULK EARTHWORKS
Drawing Number
510119/002-SKOO4 I Rev;r
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 5 of 37 Appendix 3 - Civil Engineer Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.