Council archive · source document
Part 5 of 37 Appendix 3 - Civil Engineer Report MCU12/0208
Very large file (37.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
Engineering Report
Noosa on Weyba
Table of Contents
1 Introduction 5
1.1 Proposed Development 5
1.2 Biodiversity Offset Area 6
1.3 Staging 6
2 Earthworks 7
2.1 Geotechnical Investigations 7
2.2 Demolition and Clearing 7
2.3 Excavation 7
2.4 Retaining Structures 8
3 Roadworks 9
3.1 Trunk Road Alignment 9
3.1.1 Walter Hay Roundabout 9
3.1.2 Road 2 10
3.2 Typical Cross Sections 10
3.3 Existing Road Upgrades 11
3.4 Concrete Works 11
3.4.1 Shared Footpath 11
3.4.2 Kerb 11
4 Stormwater Management 12
4.1 Stormwater Quality Management 12
4.2 Flood Study 12
4.2.1 Minimum Floor Levels / Filling 13
4.2.2 Culvert Crossing 13
5 Sewerage Reticulation 14
5.1 External Connections 14
5.2 External Augmentations 14
5.3 Internal Network 14
6 Water Reticulation 16
6.1 External Connections 16
6.2 Internal Network 16
7 Integrated Water Cycle Management Plan 17
8 Preliminary Acoustic Analysis 18
9 Conclusion 19
Appendices
Appendix A Concept Master Plans
Appendix B Constraints Plan
Appendix C Engineering Sketches
Appendix D Preliminary Acoustic Analysis
November 2012 Cardno iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 5 of 37 Appendix 3 - Civil Engineer Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.