REFERENCED DOCUMENT 100 Year Boundary for the Existing Floodplain Condition - REC13/0095

of 9

Text shows just the words. Original shows the document exactly as it was published.

                                                                   SSM
    ’
"




         Your Reference:


         Our Reference:       2013-08
                                                                   Brisbane Stonnwater Management Pty Ltd
                                                                     ACN 094 878 734 ABN 75 094 878 734
                                                                        92 Alkoomie Street, Wynnum Nth, Qld
                                                                          PO Box 8119, Wynnum Nth, Q 4178
         Date:      6 Sept 2013                                           Ph 07 33963383      Fax 07 39010285
                                                                            Email:    [email protected]


        Callaghan & Toth
        POBox 2305,Noosa Heads, Q4567


        Attn:    Mr Lex Toth


        Dear Sir,


        Re:      Proposed 3 Lot Subdivision At 55 Lake MacDonald Drive, Cooroy

        In response to your emailed request of 16 August 2013,I offer
                                                                   my advice in relation to Items 3 and 5 of
        SeRC’s 24 July 2013 request for further infonnation about the above proposal; namely-


        3     Provide an amendedplan which accurately represents the regionalflood extent on site (Council
              flood extent mapping indicates thatpart ofLot 5 is within inundation extents).

        5     Provide additional information (or an updatedflood study) which demonstrates the roughness
              (manning’s)assumptions adopted in the originalflood study allow for revegetation ofthe main
              drainage line. Alternatively provide a sensitivity analysis ofincreased roughness assumptions and
              amendflood level extents and lot layout as necessary


        The 100 Year Flood Boundary For The Existing Floodplain Condition


        Lawson & Treloar Pty Ltd (L&T)undertook a flood study ofthe creeks in the Cooroy area for Council
        in July 2002.I understand that some parts ofthat study have recently been updated for Council
                                                                                                      by other
        consultants, but the updated parts do not include the tributary alongside the proposed subdivision.
        Accordingly, I have fonnulated my following advice on the basis that the 2002 L&T flood study is the
        latest available study of flood levels in the subject area.


        The schematic on the following page of this letter illustrates the floodway / subdivision scenario. One
        ofL&T’s model cross-sections abuts the upstream boundary of Lot 5, and that lot extends about 35
        percent of the floodway distance between that cross-section and the next downstream cross-section. I
        understand that L&T’s predictions of the 100 year flqod levels at those two cross-sections, for their
        assessment ofthe existing Manning’s n values, are respectively 101.79 m AHD and 100.62 m AHD,a<;

        marked in the last row of data in the schematic. I therefore infer that the 100
                                                                                          year flood level at the
        upstream boundary of Lot 5 for the existing floodway condition is 101.79 m AHD,and by arbitrarily
        proportioning 35 percent ofthe level differential between the upstream and downstream cross-sections,



        B5M Doc File 5SLkMacD RFLDoc
                                                                                                           Page 1
                              _
Full text of the other 8 pages

Page 2

 I infer that the corresponding 100 year flood level at the downstream boundary of Lot 5 is 101.38 m
 AHD,as also indicated in the last row of the schematic.

 I note that Callaghan & Toth have already redrawn the existing 100
                                                                            year flood boundary on their
drawing number 1225-19 to accord with the above advice, and for the sake of completeness I have
attached a copy ofthat revised drawing to this letter. The redrawn line is based on field survey of the
topography ofLot 5,rather than Council’s Lidar topography,and is transcribed to the schematic below.
The existing 100 year flood boundary is seen to be mostly outside the boundary of Lot 5, except for a
small area at the south-east corner ofthe lot. Please note that the flood boundary on the schematic does
not include the flood boundary alongside the local gully, which runs alongside the eastern boundary of
the lot. Please also note that the proposed filling of Lot 5 extends across the southern boundary ofthe
lot and intrudes slightly into the existing flood 100 year boundary the area offilled flood storage will    -




be 12 metre long, with a maximum width of 1.2 metres and a maximum depth of0.08 metre, for which
a prismoidal approximation suggests a displaced floodplain
                                                              storage volume ofjust 0.4 cubic metre. This
loss of storage should not adversely affect upstream and downstream interests.


                                                                                              Proposed Min.F    Levels: 102.99
                                                                                                                   102.68
                                                        Inferred 100 yr flood boundaries, Pre-fi!ling
                                                                                                                                ’\
                                                         For n = 0.15                   Post-Filling
                                                                   \..
                                                                    ’\
                                                                                           0 yr flood boundary
                                                                                         Based on L&T flood levels _
                                                                                         For existing n values
                                                                                                                     ~\.
                                                                                                                      \\
                                                                                                                                          LOT 5


                                                                                                                                     ---______---_
                                                                    v’,                                                    /1
                                                              -t:,?f) :                             Proposed toe of fill    :
                                                    <;)
                                                        f:>              1                                                  1

                                                                         :                    4f"~/1\I                      :
                                                                         1                                                  1
                                                                         1                                                  1
                                                                         1
                                                                         1
                                                                         1
                                                                         \
                                                                          \
                                                                             \
                                                                              \
                                                                                 \
                                                                                  \
                                                                                     \
  100 year Flood levels (mAHD)                                                        \
                                                                                         .,
                                                                                         1


                                                                                         1                                  ,                     1
  85M inference for n value of 0.15
                                                                              100.89                                  101.66                  102.07
  (50%more than 0.10 ~ Add 0.14 m)                                                       1                                  1                     1
                                                                                         1                                  1                     1



  BSM inference for n value of 0.10
                                                                                         ~                                  ~                     ~
                                                                              100.75                                  101.52                 101.93
 (25%more than 0.08 ~ Add 0.07 m )                                                       I                                  1                     1
                                                                                         I                                  1                     1

                                                                                         I                                  I                     1
                                                                                         1                                  I                     1
 L&T prediction for existing n values + 25 %                                             I                                  I                     1

  Adds 0.06   -
                  0.07 m to the existing flood levels                         100.68                                  101.45                 101.86
                                                                                         I                                  I                     I
 (BSM inference ~ n          =   1.25 x 0.064 = 0.080 )                                  I                                  I                     I
                                                                                         I                                  1                     1

                                                                                         I                                  1                     I
  L&T prediction for existing n values of:                                               I                                  I                     I
                                                                                         1                                  I                     1
  Creek bed 0.06                                                                         I                                  I                     I

                                                                                         !                               ~                        ~
  Cleared floodplain 0.03 to 0.05
                                                                              100.62                                  101.38                 101.79
  Uncleared floodplain 0.06 to 0.12                                                      I                                                        I
                                                                                         I                                                        I
  (BSM inference ~ average n 0.064 )                                                     I                                                        I
                                                                                         ,
                                                                                                                                                  I




 8SM interpolation of flood levels at 35% of the distance from the U/S XSect to the Dls XSect                              -




The 100 Year Flood Boundary For A Revegetated Floodplain


I have been advised by Council’s officers that they are seeking a sensitivity analysis for Manning’s n
values of 0.1 0 and 0.15.




BSM Doc File 55LkMacD RFI.Doc
                                                                                                                                                       Page 2
                                 _

Page 3

 I understand that L&T’s assessment of the existing Manning’s values ranged from 0.06 in the creek
 be~ to 0.03     -
                      0.06 in the cleared floodplain areas, to 0.06   -
                                                                          0.12 in the uncleared floodplain areas.
 Given that the overbank areas in the subject vicinity are mostly grassed paddocks, I infer that L&T’s
 model would have simulated an average n value across the floodway ofjust below 0.065 at these cross-
sections;   -
                or   nominally 0.064 as I have indicated in the last row of the preceding schematic.

I understand that L&T also undertook a sensitivity analysis with Manning’s n values 25 percent higher
than the existing values, resulting in the flood levels in the second-last row ofthe preceding schematic.
These flood levels are 0.07 meter higher than the corresponding levels for the existing floodplain
condition. On the basis ofmy nominal inference about average n values in the preceding paragraph, the
L&T model probably simulated an averaged Manning’s n value ofabout 0.064 + 25%                   =
                                                                                                     0.080 for this
sensitivity scenario, still short of Council’s requested values of 0.10 and 0.15.

I have used the abovementioned L&T sensitivity test as a guide to the impacts offurther increases in the

Manning’s n value. An increase in the Manning’s value to 0.10 would represent a 25 percent increase
on the abovementioned     value of 0.080, or the same % increase as in L&T’s sensitivity test. This
suggests that a Manning’s n of 0.1 0 would add about another 0.07 metre to L&T’s sensitivity flood
levels, thereby resulting in the flood levels in the third-last row of the preceding schematic. A further
increase,to a Manning’s n 0.15,would represent a 50 percent increase on the value of0.10, or double
the percentage increase in L&T’s sensitivity test, which suggests that this would add about twice 0.07
metre (i.e. 0.14 metre) to the flood levels for the 0.10 value        as indicated in the top row of the
                                                                           -




preceding  schematic.


Both ofthe abovementioned increases in Manning’s n value (to 0.10 and 0.15)would, in the absence of

any allotment filling, shift the 100 year flood boundary inside the Lot 5 boundary, as indicated for the
"Pre-Filling"scenario on Callaghan &Toth’s attached drawing and in the schematic on the preceding
page of this letter. However, Lot 5 is proposed to be filled to and beyond the lot boundary, thereby
raising the topography at the lot boundary enough to prevent any additional intrusion of the flood
boundary into the lot, as indicated by the realigned 100 year flood boundaries for the "Post-Filling /
n=0.15" scenario on the attached drawing and in the schematic. The house-pad is proposed to be filled
to a minimum level of 102.68 m AHD, or 0.61 metre higher than the 100 year flood level at the

upstream comer ofthe lot for a Manning’s n of0.15. Given that the 100 year flood depth in this area is
about 1.8 metre, that clearance of 0.61 metre represents a freeboard of about 34 percent of the flood
depth, above the "fully revegetated" flood level. The floor level on Lot 5 is proposed to be even higher,
at 102.99 m AHD,resulting in a freeboard of 0.92 metre (ormore than 50 percent ofthe flood depth)

above the "fully revegetated" flood level. I acknowledge that the abovementioned flood levels for the
revegetated floodway have been derived from some approximate inferences rather than detailed
modelling, but I suggest that the generosity ofthe abovementioned freeboards will be more than enough
to offset any shortcomings in those inferences.



Please do not hesitate to contact me if you require any clarification of the above advice. In the
meantime, I remain,

Yours faithfully,

      (?
~".~~
~"-~
Denis Ogle, RPEQ 2405, Director.




8SM Doc File 55LkMacD RFI.Doc
                                                                                                            Page 3

Page 4

 DRIVEWAY SETOUT fOR LOIS 5 TO
 EDGE Of’ CONCRETE AT FINISHED LEVEL
                                                                                                                          Callaghan & Toth
                                                                                                                                 Civil, Environmental &


                                                                                                               SJ
  PONT        E.ST1NG           NORTHING
                                                                                                                                 Hydraulic Engincoel’S
       I    X-41l1585.81l7    Y-7071l187.76J
                                                                                                                          \                           PO aox 2lOS
   2        X-4g1~U595        Y.707SI a9,53O                                                                                                     NOOSA .v.DS 4-S7

   3        )(_4;1574,249     Y.7019190.691
                                                                                                                                       "’41__-
                                                                                                                                    PhoM 54749011, rOt 547+9041
       4    X-491574.711      Y-7079193. ~                                                                                             _.ootIoPanonclottl.eom.o"
       ~    X-491!)62.521     Y-7079192.437                                                                                NIt              N
   6        X-491586.642      Y-7079190.703                                                                  drown         III

       7    X-491588.519                                                                                     _...
                              Y-7079195.274
       .    X-491583.654      Y_707tiI191.J21
       9    X-491575.013      Y-7079198.6~9                                                                       .....

   10       X-491575.535      Y-7079Z01.62J
   11
                                                                                                             IN WIImIt5 .
                                                                                                                        ASSOC:M1ES
            X-491584.478      Y-7079ZOO.229
                                                                                                             PHOHE 54 426 121
   12       X-491589.683      Y-7079198.040
   13       X-491591.869      V-7079211.361
            X-491593.076
                                                                                                              ,..;.01
   14                         Y.7079219.395
   15       X-491569.805      Y-7079223.023                                                                   PROPOSED 3 lOT
   16       X-491570.267      Y-7079225.9S7
                                                                                                              SUBDMSION AT 55 lAKE
   17       X-491593.905      Y-7079222.302
                                                                                                              Woc:OOIWD DRM: COOROY
   18       X-491599.041      Y-7079220.122
                                                                   llilIE;

                                                                   AU. ORMWAYS TO BE CONS11M:ITD TO
                                                                   STAHOARO DRA_ IPWf-"l SEO R-050
                                                                   & TO ~PlAH 122~21.
                                                                   ALSO REFER TO _Y SETOUT TAIIlE
                                                                   FOR DETAIlEQ SETTIIC OUT.
                                                                                                             [:...            PlY llD



                                                                         \I
                                                                   llilIE;
                                                                   REFER TO PlAH 1225-23 FOR OO.\llED
                                                                                                             [~PlAN1Of2
                                                                   SETOUT (1f STOR....TER PIPE5 &
                                                                   STAHOARO DRAWINGS USTEO OH PlAH
                                                                   1225-17.
                                                                                                              lOT 136 on WCH978
                                                                             I

                                                                         I \
                                                                                                              PariIh at 1EWAHTJj
                                                                                                              County at YARCH
                                                                                                              SUNSIH ~coua.
                                                                                                              I.ocaIty at lAKE Ib:llONAIJ)


                                                                        I            \                           SCALE


                                                                                                                                                       =
                                                                                                                  "...
                                                       LEGEND’ PROPOSED SERViCES                              I~              $ICU __ "~.-...0 XJU
                                                                                                                               OOI SCAl[.....1HIS~




                                                                                                                 RE\1SIONS
                                                         \               PROPOSal HOOSE SITE                       tW dtt<.                                   .....
                                                  ./
                                                           \                                                 A     Rf.\1:SED lOT LOO.S ,litO 0100             08 13
                                                /’"                                                          B     RE\1S!D RTW AHO FU lMl.S                   08 13
                                                             \..
                  "


                                                        ’----r-
                                                             /.-
                                                                         PROPOSal MNIIIC
                                                                         PATH
----

                                                       ~                 PROPOSED RET~NlHC iI\U. TO              ru:s
                                                                         DETAIL OH PlAH 1225-20
                                                                                                                 ~Ocrm
            ,
             "                                             .~            PROPOSED f’HSI ~l.E’                "          CT ....
                                                                                                             lake Woc:OonoId 0I’IYt
                                                                                                                                       ~            1225 30 lob
                                                                                                                                                 CWTlnt DWC-Q.\SE

                                                                         0100 FlOOO lH’ CIR!EHT sruor
                                                                         n=O.064 (,IPPfiOXlllAll’ W FlOOO)               rolAPPKOVAL
                                                                         0100 FlOOO LtIE (SIKJIT TI
                                                                         (1f COHCOORAT1OH) POST-FllH:
                                                                                                                          $Met      3 of    14    IheelI
POINT       EAST1NC            NORTHINC                                  0100 FlOOO UHf (,IPPfiOXlllAT1OH                 --
  20       )(-4.915$8.282    Y-7079176.861                                VARIOUS n VAlUES) POST-flUNG
  21       X-491~S.809       Y.707QI7!t704                               Qloo FlOOO UHf (,IPPfiOXlllAT1OH
                                                                                                                          1225-19
  22       X-491570.526      v- 707917tUI14                               VARIOUS n V~UES) PRE-FllH:
  2J       X.49151’.9~       Y.707917S.8.’                                                                                   dot.    !SUI JJM[ lOll

Page 5

 No. 55 Lake Macdonald Drive Cooroy Stage 2 Short Duration Culvert
 Calculations for Access for Lots 5, 6, & 7.




Lot 7 Culvert: Catchment A (see Plan 1225-25).


Catchment Area A                     =
                                         1.653 ha


Q 1 00 rainfall event                FCIA     =
                                                        1/360 x 0.94 x 155 x 1.653                     0.67 m3/s


Cross Road culvert, 1 X 900x300 RCBC with outlet control.


Maximum HW                =
                              103.475(upstream side of dwy) 102.875(RCBC invert)
                                                                        -                              =
                                                                                                           0.6m


ke 0.4, A
     =
                 =
                     0.908 x 0.305        =
                                              0.277 sqm, L      =
                                                                     4.88m


de   =
         0.467(QIB)2/3        =
                                  0.467 X (0.51/0.9)2/3         =
                                                                    0.32m


TW       =
             xsect DIS of2/A (see attached PCDrain Calculation sheet)                        =
                                                                                                 0.232m


(de + 0)/2       =
                     (0.32 + 0.305)/2         =
                                                  0.313m


So ho is greater of 0.232 and 0.313                 =
                                                        0.313m


HW       =
             H + ho   -

                       LSo
0.6   =
          H + 0.313       -
                              0.03
H    =
         0.317


From Figure 9A-5 DTMR Road                         Drainage Manual, Q        =
                                                                                 0.51 m3/s


Q 1 00 weir flow                              =
                                                        Q 1 00 flow 0.67 m3Is      -
                                                                                     0.51 m3Is piped
                                                        0.16 m3/s


Weir Q100                          1.7LH3/2             B   =
                                                                6m
0.16                               1.7 x 6 x H312
H                                  (0.16I (1.7 x 6)i/3
                                   0.063m


Adopt weir capacity for a 0100 of 0.67 m3/s with 6m width, 0.063m upstream depth Hand
900x300 RCBC.


Note culvert more than adequate tor Q5 without overtopping as Q5                             =
                                                                                                  0.32 m3/s vs culvert
capacity of 0.51 m3Is.

Page 6

  Lot 6 Culvert: Catchment A + B (see Plan 1225-25).


  Catchment Area A                  =
                                        1.755 ha


 Q 1 00 rainfall event              FCIA       =
                                                         1/360 x 0.94 x 155 x 1.755              =
                                                                                                           0.711 m3/s


 Cross Road culvert, 1 X 900x300 RCBC with outlet control.


 Maximum HW                =
                               1 02.883(upstream side of dwy)            -
                                                                              1 02.364(RCBC invert)        =
                                                                                                               0.519m


 ke=O.4, A        =
                      0.908 x 0.305        =
                                               0.277 sqm,L       =
                                                                      4.88m


 de   =
          0.467(QlBi/3         =
                                   OA67 X (OAI0.9i/3         =
                                                                 0.272m


 TW       =
              xsect D/S of2/C (see attached PCDrain Calculation sheet) = OA11m



 (de + D)/2       =
                      (0.272+ 0.305)/2          =
                                                    0.288m


 So ho is greater of 0.411 and 0.288                 =
                                                         0.411m


 HW       =
              H + ho   -

                           LSo
 0.519     =
               H + 0.411       -
                                   0.064
 H    =
          0.172


 From Figure 9A-5 DTMR Road                         Drainage Manual, Q         =
                                                                                   OAO m3/s


Q 1 00 weir flow                                         Q100 flow 0.711 m3/s         -
                                                                                        0.40 m3/s piped
                                                         0.311 m3/s


Weir QIOO                           1.7LH312             B   =
                                                                 3m
0.311                               l.7 x 3 x H312
H                                   (0.3111(1.7 x 3))2/3
                                    0.155m


Adopt weir capacity for a 0100 of 0.711 m3/s with 3m width, 0.155m upstream depth H and
900x300 RCBC.


Note culvert more than adequate for Q5 without overtopping as Q5                                =
                                                                                                    0.34 m3/s vs culvert
capacity of 0.40 m3/s.




X:\JOBS\CT Projects in progrcss\l225 30 lots lake MacDonald Drive\CorrespondencelStage 2 Correspondence\property access,
                                                                                                                           2
flooding calcs.doc

Page 7

 Lot 5 Culvert: Catchment A + B (see Plan 1225-25).


 Catchment Area A                        =
                                             1.755 ha


 Q 1 00 rainfall event                   FCIA        =
                                                              1/360 x 0.94 x 155 x 1.755                     0.711 m3/s


 Cross Road culvert, 1 X 1200x300 RCBC with outlet control.


 Maximum HW                 =
                                102.579(upstream side of dwy)                 -
                                                                                   102.1 04(RCBC invert)    =
                                                                                                                OA 75m


 ke= OA, A        =
                      1.212 x 0.305             =
                                                    0.370 sqm, L      =
                                                                           4.88m


 de   =
          OA67(Q/Bi/3               =
                                        OA67 X (OAll.2i/3         =
                                                                      0.246m


 TW       =
              xsect D/S of2/C (see attached PCDrain Calculation sheet)                         =
                                                                                                   OAl1 m


 (de + D)/2       =
                      (0.246+ 0.305)/2               =
                                                         0.276m


 So 110 is greater ofOAl1 and 0.276                       =
                                                              OAllm


 HW       =
              H + 110   LSo
                        -




 OA75      =
               H + OAl1             -
                                        0.069
 H    =
          0.133


From Figure 9A-5 DTMR Road                               Drainage Manual, Q         =
                                                                                        OA6 m3/s


Q 1 00 weir flow                                              Q 1 00 flow 0.711 m3Is       -
                                                                                            OA6 m3Is piped
                                                              0.251 m3/s


Weir QI00                                1.7LH312             B   =
                                                                      4m
0.251                       :::::
                                         1.7 x 4 X .H312
H                                        (0.251 I (1.7X 4))2/3
                                         0.111m


Adopt weir capacity for a 0100 of 0.711 m3/s with 4m width, 0.111m upstream depth H and
900x300 RCBC.


Note culvert more than adequate for Q5 without overtopping as Q5                                   =
                                                                                                       0.34 m3/s vs culvert
capacity of 0.46 m3/s.




X:VOBS\CT Projects in progress\l225 30 lots lake MacDonald Drive\Correspondence\Stage 2 Correspondence\property access,
                                                                                                                              3
flooding eales.doc

Page 8

    APPENDIX A                    -
                                     PCDRAIN CALCULATION FOR CULVERT
                                           TAILWATER LEVELS




X:\JOBS\CT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondence\Stage 2 Correspondence\property access,
                                                                                                                           4
flooding cales.doc

Page 9

    ~
    ~          ii              il! ~           DESIGN ARI



    ! :;;                         ;:           STRUCTURE No.
{1;                                                                        .-
~                                                                          ~
    ~
~f             ~:;;            ;-~
                               s.              DRAIN SEmON
                                                                           )0-
                                                                           -<
                                                                           5
                                                                           :z




I   -




                                               Sill-CATCHMENTS
                 f;               .

                                               CONTRlBUTING



    j                                          lAND USE

    ..
                                        )t     SLOPE OF CATCHtolNT

                                               SUB-CATCHI1ENT
               n               n
                                        !!!.
                                        ’"
                                               TIME OF CONe.
                                                                     ;::-~
                                        "


               9191            91 III   ~ RAINFALL INTENSITY         -




                                               10yr RUNOFF           ~~
    ~                                          CO-EFFICIENT
                                                                           :r:
                                                                           )0-
                                               CO-EFFICEHT
    ~          ~~              H
                                               OF RUNOfF
                                                                     ~~
                                                                           :c

                                                                           ~
    ! I!I!
    Il
               ,.,.
                                  ~ ii:"       SUB-CATCHMENT AREA    >",
                                                                           z
                                                                           -<


                                                                           c::

                                                                     ~~
    ;          ~~

               in              ~~ ii:"         EQUIVALENT AREA       ;.""

               ,.,.
               U               ~~ if SUI1 OF (C.A)                   ~
                                               SUB-CATCHI1ENT
         ;II
               !::~
                         ;.~: ;;;-             DISCHARGE
                                                                     ’"




                                    K&C "FLOW IN
         ~         !:
                         ~ !UNe. BYPASS)
                         s
                                        ~




         ~         ..    ~        ..           ROAD GRADE
         ,.        :II            .. ~
         !:              !:i                   AT INLET
                         .

                                               MINOR FLOW
                   ~              !;;;-- ROAD CAPAOTY
                                                                           6
                                                                           fjl
                                               INlET TYPE
                                                                           z:




                   !:             $;;:-        FLOW INTO INLET       fZ’
                                        ....
                                                                     ’"
                   -              -     ~      BYPASS FLOW           .,.




                                               BYPASS
                                               STRUCTIJRf No.

                                        iI.    CRlTICAL
               ii              ~~       ’"
                                               TIME OF CONe.
                                                                     ri


                                        ’"

               ~~              SISI     ~ RAINFALL INTENSITY         -




                                                                     +
               ;:!ii
               :1:_            g;g; if         TOTALlC .
                                                       A)            ~
                                                                     )0-




                   ’S             :;;;-        MAJOR TOTAL FLOW      e


                                  ’:II....     MAJOR SURFACE FLOW       <::>
                                                                     ’" ",
,-,
                                  "’~                                ’"    >
J>                                             CAPACITY                    z
r-
,-,                                                                        <::>
c:             !-                       ;;;:   MAJOR SURFACE FLOW    ",:;l
0-
J>
               2               r                                     ~

                                                                           z
-I
                               is: ;;;- PIP~ FLOW
:z:            t~              ~-
                                                                     .g
VI

-I             If                 ; REACH LENGTH
                                        ..                           .-
J>
OJ
               ;0::
r-             ~

rn
                   ;              ~~ PIPE GRADE                      on




                   :;:            ~     ’"
                                        ’"
                                               PIPE I BOX
                   ’iI                         DIMENSIONS (CLASS)
                                  ii

               ~~              d ~ (PIPE
                                   FLOW mOaTY FULL
                                        ~
                                         GRADE VELOCITY)
                                                                     <



                                               TIME OF FLOW
                   ~              5 ~.                               -<
                                               ~REACH
                                               STRUCTURE
                                               CHART No.




                                               STRUCTURE RATIOS

                                               FOR ’K’ VALUE


                                               CALCltATIONS




                                                                     ~
                   ,.

                   i              i. mOOTY HEAD                      ~~
                                               U/S HEADLOSS          ",,0

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT 100 Year Boundary for the Existing Floodplain Condition - REC13_0095.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.