Minor Change Existing Approval 51981 4258 02 · 51981.4258.03
4. ASSESSMENT MANAGER CONDITIONS
1. Submission to and approval by Council of building in accordance with the Building Act,
Councils By-laws and Policies, and generally in accordance with the plan approved in this
Consent and the Shire of Noosa Town Planning Scheme apart from where amendments are
required or dispensations have been granted in conjunction with this Consent.
2. Provision of at least 25 off-street car parking spaces, comprising 20 covered spaces and 5
uncovered spaces, and access thereto which are to be provided with a sealed pavement and
designed, drained, constructed and maintained in accordance with the Town Planning
Scheme, Council’s Policies and to the reasonable satisfaction of the Shire Engineer. Plans
and specifications for these works are to be submitted to the Shire Engineer for approval in
conjunction with the Building Application.
2.1. 2 covered spaces are for exclusive use by Apartment 3.
2.2. 1 space is for exclusive use by the Managers Office.
3. There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
4. The open space and setback areas are to be landscaped in accordance with the Noosa
Design Manual and properly prepared landscaping plan to be submitted to and approved by
the Shire Planner, prior to the issue of a Building Approval. Such landscaping is to be
completed in accordance with the approved landscaping plan, prior to the premises being
occupied and maintained at all times thereafter to the reasonable satisfaction of the Shire
Planner.
5. Existing trees are to be retained, except where required to be removed due to building
operations or the conduct of the approved use. Areas of existing trees proposed to be
retained on site are to be depicted upon the landscaping plans submitted in accordance with
condition 4 above, for approval by the Shire Planner.
6. Construction work is permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to
Saturday, except where extended hours are approved by the building surveyor.
7. Payment of contributions in accordance with Council’s Policy on Water Supply and Sewerage
Headworks, current at the time of Building Approval . Calculations based upon the current
Policy including Price Index variation as at June, 1988 are estimated as follows:-
Water Supply - $36,989
Sewerage - $14,833
TOTAL: $51,822
If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
or trading bank guarantee for the required amount is to be lodged prior to the release of the
Approval. The contribution is then required to be made within fourteen (14) days of Building
Approval.
8. Construction of roadworks, drainage and footpath improvements across the full frontage of
the development to the satisfaction of the Shire Engineer. Such works shall involve the
construction of kerb and channel, bitumen widening, associated drainage, hit mix correction
to the existing pavement, where required and footpath upgrading works in accordance with
Council’s forward planning intentions for the area. In this regard, plans prepared by a
registered Civil Engineer are to be submitted to and approved by the Shire Engineer, prior to
the commencement of construction.
9. The developer shall bear the cost of alteration of any public utility of facilities necessitated by
the development of the land or associated construction works external to the site.
10. Connection to Council’s existing water supply and sewerage systems at the developer’s
expense to the standards and requirements of Council’s Shire Engineer.
Page 2 of 6
Document Set ID: 23273616
23272292
Version: 1,
3, Version Date: 03/10/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original