Original source · versioned page text
CD-640.14(1)
Attached to the e-mail Operational Works Application - DA Form 1, Civil Plans - 33 Ross Cr Sunshine Beach.
PRELIMINARY ONLY - AWAITING FINAL COORDINATION
2 driveway - 3D view 01 3 driveway - 3D view 02
TOW 27.800
TOW 27.645
iwl07
L2
g01
sin01
TOW 26.145 TOW 26.120
RL 26.000
L2
TOW 25.850 g02 29
RL 25.710
8
7
RL 25.310
TOW 25.145
mts02
rnd01 RL 24.810
L3
w01 6
RL 24.290
blk01 roof
con02 RL24.100
scr02 scr02
meditation suite L2
d03
con02
first floor
RL21.000
ground ceiling
rnd01 RL20.460
services area comms room
ground level
RL17.500
1 Section - Driveway - Entrance
710.40 1 : 50
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0427
NM 1 31/03/2026 Preliminary Construction Issue 33 Ross Crescent, Sunshine Beach Ross Crescent Family Trust 640 CD 640.14 1 SCALE 1 : 50
0427 driveway details
construction 1:1 @ A1
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright | Nominated Architect Shaun Lockyer 3455 QLD | 9377 NSW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.