Change to Existing Approval - OPW11/0116.01

of 52

Text shows just the words. Original shows the document exactly as it was published.

Very large file (40.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                                     @
                                                                       l     ~i~i,:~iin                                                      \\   I         \\   6 .0\

        ISunShineCoast
         Council Request
                                                                                                     2011/12 Regional Strategy and Planning
                                         to Change Existing Approval and/or Extension to Relevant Period                                                                         _




     ALL questions MUST be completed unless the form indicates
                                                                                 otherwise.
     This form must be submitted to Council accompanied
                                                                       by the applicable fee.
     Attach extra pages if there is insufficient
                                                   space on the form.
     tf Council was the Assessment
 .


                                        Manager for the existing approval, and the approval was issued by the Court,
     (a)a request to change the development approval and/or conditions is made to the Court; and
     (b)a request to extend the relevant period for the approval is made to Council.
     All terms used on the form have the
                                              meaning given in the Sustainable Planning Act 2009 or the Sustainable
     2009.




 ~Ull n~me -:-:-_ individual or com~any. .5un..Sh\ne:... CCts-\-                                           c~)’..)(’\(,!_.~\
                                                                                 _




 Contact
          _~am~ for company ’:
                     -




                                                    C~(,--":tt
 Postal
        addr~s~ Po ~r- ::~::-k-,.,
                                              ’          ..                                        C~~’\.s.+c,.t
                                                                                                                                                  ~k~’\C0e.."V\""_FJ)
..~uburb "-’\c::x.:~  <""\5>c::c~c..h...                                         State
                                                                                       C\? l.,.j’J             Postcode      4-2- i
 ~.usinessp’hone (C?})S~.4:. t:5{,~f NH phone 049-:1106 ~P::f: e..S
                                                     .




                                                                                              ,~?bil~ QUq>b4I:fY 83
.~~~il ~~?~_~_:;s._ i c~/..(!i)_ C QCl. ~~J~"!! ~ te_fV1 \t, CJ;:;v..’\.. p,L.I...._           F~x Ltf-().)
                                                                                                                          ;



                         .


                                                         ~)
                                                                                                           _


                                                                                                                                           _ss’::37-chH_.{
2. Details of existing approval’
                                                                                                                                                                             ,




’Type of approval (please tick ALL applicable categories)                                ’Which entity issued approval?
;t2l(    Development Permit                                                                J3        Sunshine Coast Council
 o       Preliminary Approval                                                            -,..,       ro.
                                                                                                                ",ntih
                                                                                                           >r
                                                                                                                          a/ease specify
,0       Compliance Permit
         Material Change of Use                                                         Development Counter
o Reconfiguring a Lot
~ Operational Works
                                                                                       t’i’11:!’;:~              09 MAY 2012
o        Building Works                                                                 ).   .




                                                                                       l
o        Plumbing or Drainage Works
o        Compliance Certificate                                                                      Maroochydore
)?i Environmentally Relevant Activity
Applicationnu_~?e.r/c~~~?!1 r~!er~nc.e OP’v~ \~ /Q\\ ~                           _..
                                                                                                                                       ’




                                                                                                                                           Date issued ,;2’-1. II. Zoi
                                                                                                                                                                         !
 Is the approval for a mobile and                                                                                   ’




                                             temporary ERA?                                                              No                0   Yes    -

                                                                                                                                                          complete be/ow
 Insert the name of each local govemment area in which tile
                                                                                        mobile and temporary ERA is proposed to
                               -


                                                                                 ’.
                                                                                                                                                      operate/operating
                                                                                                                         (, 10

                                                                                         IBOX: ...2..0..~q1:......(9. ..juAc
Privacy
Council will use any personal information provided for the
                                                            intended purpose only and for remaining in contact with
authorised to collect this information in accordance with the Local                                                   you. Council is
                                                                    Government Act 2009 and other Local Government Acts. Your
personal information is only accessed by persons authorised to do so. Your
                                                                             personal information is dealt ’^~th in accordance with
council’s    privacy policy.


-_sunshlneco.a.st..qld.gov.au            I    mIli!@stJOShiner.."ast.qld.gov.BU                  I   T 07 5475 7272           F 07547577.77
I..ockBd BBQ n SunSl           Coerit Mail Cenlllt Old -4560   I       ABN 37 876 973 913

CaIoundra ~1 Ornrah AYtlnue Calouocta Old 4551
                                                                   I       lIIa.roochydonl offtCtll 11-13 Ocean Street Maroochydont Old <4558
Nlunbour offlI;e enr Currie and Bury Straet.e Nambour Qld 4Sf3O
                                                                                 I      Tewantln ofl’Ice 9 Pelican Sb’eet Tewantin Old 4565

1 of 4       201 ’!112 Regional Strategy and
                                                   Planning Request to Change Existing Approval and/or Extension.to Relevant Period FM401
Full text of the other 51 pages

Page 2

3. Nature of request (please tick ALL applicable categories)

)& To change the development                                   )To change the development                                                                              i
                                                                                                                                                                            0           To extend the relevant period
                                                               .




         approval                                                        conditions                                                                                                     before lapsing

    Please attach documentation outlining the detail of and the reasons and justification for the requested change or                                                                                                                                                      ,


:extension.



    4. Location ofthe premises
                                                                                         .

.
    Unit No.                             : Street No                                         Street                                                                           ~k.,~ D(lYe....




                                              NB’ j..JCvts                       In                  No::>SCf                                        I<ivu                   ’
                                                                                                                                                                                                71’1;.5                              .s             ---the.
                                                                                                                                                      -




                                                  .


                                                      ,QtiJ0LL.’"f                                   )
                                                                                                     D               .
                                                                                                                          tf.d-:at (.g                            ,..




                                         .1




    5. Concurrance Agencies

                                                                                                                                                                                   lo No
.




    Was there one or more concurrence agencies involved in the original approval?

,
                                                                                                                                              .




                                                                                                                                                                                   ~;~~~~~~w
: ~t~"::: -;;d;;’~3i2~’fth~ s’~;;;~;bi~F;;;;;~gA~ 2 9’h~ -p;;;~~ ;:;:;~k~g the req~;; ’i~’;~Quiredtc;’9i~;’~’~~py~f’lhi~-;:~~~st to ’~II
:
    concurrence          agencies.

    ~ji"’ Ag. h’c~b 10 .(/.,~;,:::.~;:~ ;~::;.;,}~.:>{;.:";’:;r:.I>:/:.:~,~’,:’i~"::~f~~,i.:"~ ;.:.>:>~’-: .:’,,;(l?ai;
    :                                                                                                                  P ..9 ~’~\:;:’~,);3:i]:s,:~/j;:’);:~:            :



     D.Er<~1.                                                                                                                                                                      !.~-fe.d                                    ..
                                                                                                                                                                                                                                     ,!/.:.’~’..,f. 9.t:2.         .....




     ,7J(: >!            .                                                                                                                                                                                     ..--~..-
                                                                                                                                                                                                                                 ,;
                                                                                                                                                                                                                             _..__..-._..._.._.-......
                                                                                                                                                                                                                                                                       ...1


      MSWT.........                                                                                                      _.   _   _.   ._..~.__.~._~.___. _..     ..._...   h......_......_   .._...   .___.   ...’,._’~
                                                                                                                                                                                                                                    II
                                                                                                                                                                                                                           ...._~.._.... .~..._..........




    6. Pre-request response notice

     Has a pre-re,quest response been given by a relevant entity (e.g’, a concurrence agency)for this request?
                                                                                                                              ..            .       ..... ...   ...         .-   _.             ............           ....         .._._..               .
              -




    ~ ~ ~ ~ ~\/~~(~~~; ’." ..;;_~~~;;;;.~:~-_.’d~)/~ ..,D                                                        es


    If yes, pteas            atfch a copy of the notice.                   .
                                                                                U



    7. Owner’s consent

     Is the owner’s consent required for this request?
                                                                                                              :~!’J.’?__
                                                                                                               o Yes- complete either Table A or Table B below
                                                                                                                     ...                    .’   ....._. ..-...                               ..




     Note   -
                  If more than one owner of the land all owners’ details are required
                                                  .    ...--       ..          ....   . ......_.   ...__...    ..-   ....   ,._..




                                                         ’

                                                    i’’?~if~?;’:;:~
                  ’

            ~;;;’"’"’n"’r’""’"<~,J~,_..
    ’!f:i ,’;1",>.,-9.W"""           nt ’-mY
                                     ~



                                        P. _..!t~rH..,m,,;,..
     "   .
                                                                   .~,                             ."
                                                                                                                                  Date

     Owner’s name/s
                                                                                                                                   .
                                                                                                                                           :  ~;OWi~i:
                                                                                                                                  :t ti^~~1:’1t_.~<’:;...,~~..~.,..::r1,~       l
                                                                                                                                                                                    r ~ldd>iin J rm).~~~f.!:,:;,i’;
                                                                                                                                                                      1iijs~ -,.,,-r._~..         ,,~.tr,,’_t~....~                      ’’’’_’   .,...’-’....-~




     IM/e, the above-mentioned ownerls of the land, consent
     to the making of this request.
                                                                                                                                  Owner’s name/s


                                                                                                                                  o The owner’s written consent is attached.
     Signature/s




     2 of 4           2011/12 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM401

Page 3

    NOTES: For question 7

    Under section 371 of the Sustainable Planning Act 2009, if the
                                                                   person making the request is not the owner of the land to which the
    approval relates, the request must be accompanied by the owner’s consent.
    However, owner’s consent is not required if the approval:
            relates to land the was acquisition land to which section 263(2Xd)of the Sustainable
                                                                                                                                           Planning Act 2009 applied when the
            application for the approval was made; or
            is for building work or operational work ior the
                                                                                                  supply of community infrastructure on land designated for the community
            infrastructure: or
            the consent of the owner would not be required under section
                                                                                                                  263(1) of the Sustainable Planning Act 2009 if a development
            application were made for the requested change,
    Also, owner’s consent is not required if the Assessment Manager is satisfied that:
            the number of owners of the land make it impractical to obtain owners’
                                                                                                                            consent, and the requested change does not materially
            affect the owners’ land; or

            having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the requested change
            does not
                            ma~er!aIlY,<lff:c~ theov.mer’s land.

    8. Does the request involve a State resource
                                                                                                        prescribed under the SustainablePlanning Regulation 2009,
    Schedule 14?
    o No
                                                                                                                  fSl’Yes   -

                                                                                                                                complete below details
    Nature of State owned resource:

    Nature of Evidence required:

’j?r ~id~~~~;i~ lo~~t~~-;f entitl~~~~t t;, th~ resource
.._....~._....- ._-
                                                                                                                  o Evidence the chief executive has agreed to the request
                   .._.._----,       _._._....-..._-- ....._-_...--_.._.._-.-
                                                                              -""’_’_--’     _’_-’_’-
                                                                                                                            -
                                                                                                                                                           .   _.   ..   ~




: Attach a copy of the evidence required above
    _’
         "--"’---"’--""-’-’~’---_..__._..,~._..- _. ....__..__.... .._~._......
r                                                                                 --   -..   .._...   ’-’




    NOTES: For question 8

    Section 370(3) and (4)of the Sustainable
                                                                              Planning Act 2009 requires that if an application for the development approval were made at
:the time of making this request and evidence under section 264(1) of the Sustainable Planning Act 2009 would be
                                                                                                                                               required to support
    the application, this request must be
’
                                                                     accompanied by the written agreement of the chief executive from whom evidence would be
    required under section 264(1 ),
,

 Section 264 of the Sustainable Planning Act 2009
                                                   provides that if a development involves a Slate resource, a regulation may require
:the application to be supported by certain evidence prescribed under
                                                                        regulation, Schedule 14 of the Sustainable Planning Regulation
    20,09 pr~s~ri~~s_th~_~t_a~::_r_~?_~c..~~ for whi9h :~~d:~~_e ~s_::9,~ired to be given, and the :_v!9.~r:c~_re.quired, t?,~U?port the
                                                                                                                                                                             appli~ti?n

    9. Declaration of applicant
                                                                                                                                                                                          _




    INVe, the applicant, ecl                               that the above infonnnation is correct in all
                                                                                                    respects, at the time of lodgement of this
    application with th                                   e Coa     egional Council. Should any of the details given in relation to this application be
    changed in the fut                                    pplic t shall advise the Sunshine Coast Regional Council in writing prior to any such                                  change
    being implemente
    Signature/s                                                                                                                                     D’t’
                                                                                                                                                               a,   I>"/      It.




    3 of 4          2011/12 Regional Strategy and
                                                                              Planning Request to Change Existing Approval andlor Extension to Relevant Period FM401

Page 4

OFFICE USE ONLY

Application no.         ,~.~.l:’0.t paid   Date paid        Receipt no.                             Initial                         :Date stamp
                                                          .,,-,-_..._--_....-_.._                                                        ..
                                                                                    .’--   .   _,   ’-’-_’--   _._-_....-._.   ._- -.,        ._.




Receiving Officer




                                                       I ,5 03C             D        )(j0
                   6,t.. L {: C)              J()8                      .



 7ft:}     Dr

 Ca\/        t   ::r’   .’
                             _
                                  N is     SHAvJ.

 Payment options                                                                                                                                           .




 In person       Customer service centres: 8.30 am to 4,30 pm Monday to Friday (excludes pUblic holidays).

 By mail         Cheque or money order to be made payable to: Sunshine Coast Regional Council.
                 o Cheque                     0 Money order                     0 Mastercard                                             0Visa

                 Card number                                                    Expiry date                                              Amount $

                 Name on card                                                   Signature of cardholder
                 Phone                                                          Is a receipt required?                                   0 Yes      0 No
 4014      2011/12 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM401

Page 5

                               International

1&                             Coastal
                               Management
                                                                                                   eco-engineered coastal solutions




4th May, 2012




Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre
Queensland 4560


ATT: Mark Lewis


RE: NOOSA RIVER SPIT [Lot 114 on MCH8391071 EROSION PROTECTION WORKS
            AMENDMENT TO PERMIT OPW11/0116




Dear Sir / Madam,



Works have commenced on the above works, however the pr gre                    f the works is such that we would like to amend the
above permit to allow for an extension to relevant timefram              an<Nlso     Ilow for a change to the construction materials for
a section of the works.                                                   (.)&V.
                                                                                   &/t
Preliminary discussions have been held with DERM & EEDI regarding                  th~~ed
                                                                                   c      es and they are generally

supportive however we do not have formal acceptan e from either agency as y lf./~fIJ1fl re     t for comment regarding the
                                                                     .
                                                                                   ’(
proposed change has been requested.                                  /}                C
                                                                                         fi~~;OV-7t41r
As Sunshine Coast Regional Council was the


            .


            .
                 IDAS application to amend the permit         assSn~se
                 Revised drawings (including the proposed change to the
                                                                                   Oel]
                                                                             works)~ O’O~              ’.
                                                                                                           .




                                                                                                            ’




            .    Revised concept environment management plans (highlighting the cha             ~pacts and m nagement for the
                  revised construction method)
            .    Justification for the requested amendments


With regards to any required fee with respect to the amendment, please be advised that as the Council is the applicant, it is
preferable for this to be billed direct to the job number. The relevant job number is 13030.0000.

If you need any further information regarding the project, please let me know.




Regards,



         Ji
Bobbie Corbett
Senior Coastal Engineer


                                                                                                                                   ..

International Coastal Management PTYlTO (lCM)                                                                                >t.

"’’’’’   50 / G Arm. SYC Marina. Main Beach. Old. 421 Z Australia
"’"’   PO Box 306 Main Beach LPO. Main Beach. Old. 4217. Australia
lfifPHON’   +61 75564 0564 ~ +61 755329147
~         WYWI.coastalmanagement.com au

Page 6

^




                                                                                                                          I




        1111111              Integrated Development Assessment System template                                    .




                                                                                                                              _:
                                                                                                                              I




     Request to change an existing approval template
     (SustainablePfanning Act 2009 version 1.1 effective March 1010)



     This template may be used for giving a written notice asking the responsible entity to make a permissible change to a
     development approval under section 369 of the Sustainable PlanningAct 2009 (SPA). It should be noted that if the
     responsible entity for the request has a form for the request, the request must made using that form.

     This template must be lodged with the following entity (the responsible entity) as applicable:

           if the change is to a condition imposed by a Minister under chapter 6, part 11, division 1 of SPA the template must be

           lodged with the Minister that imposed the condition
           if the approval was given by a Minister under chapter 6, part 11, division 2 of SPA the template must be lodged with

           the Ministerthat gave the approval

           if the change is to a condition of the approval imposed by a concurrence agency the tem plate must be lodged with the
           concurrence agency

     .     if the approval was given by the Planning and Environment Court the template must be lodged with the Planning and
           Environment Court

     .     in all other cases the template must be lodged with the assessment manager for the original development application.


     Attach extra pages if there is insufficient space on this template. Terms used in this template having the meaning given in
     the Sustainable PlanningAct 2009.




    11.Who is making the request7
     Name/s (individual or company name in full)                                       c.,<>S+                        C_QJ..f\C \
     For companies, contact name                                   ~n~t<.
                                                                     ~            Co
                                                                                                   Ru1
     Postal address


                                                                   l:a;::Xi>=                    6cld. Coo~r             !.r;l17

     Contact phone number                                          1(01)SSb (fa~by
     Mobile number (non-mandatory)                                 I 04-0J 101olJ1+ <63
     Fax number (non-mandatory)
                                                                   I (Oc)$’5:3:8 t4:J
     e.mail address (non-mandatory)
                                                                               @ 4Y’SI-
                                                                   I~  k IVJ               lVLa"
                                                                                                   aruct. (.oM                    g

       Department of Infrastructure and Planning                               Qplan                   ..
                                                                                                            ",’\J Queensland
                                                                                                       \

                                                                                                            L\"   Government

Page 7

.1..




                ODD
       2. What alre the ,details of the     existing approval sought to be changed?


       Type of approval            Identification number      Date decision notice          Name of entity that issued the approval or

                                                              or   negotiated               imposed the condition sought to be changed
                                                              decision notice
                                                              issued


              Development          OpvJ II JOIl fa             c2Q. II. .2011              DERtv\          I DEED\ / MSQ.
              permit

       0 Preliminary
              approval


       3. Is the approvat for a mobile and temporary environmentally relevant activity (ERA)?


       gr No
       o Yes-complete table A and then go to question 5

       Table A-name of each local government area in which the mobile and temporary ERA is proposed to operate/ is operating




       4. location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)


       Table B-street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
       premises

              o street address/lot     on the   plan

              l2S street address/lot   on   plan for the land adjoining or adjacent to the premises (appropriate for development in
                  water e.g. jetty, pontoon)


       Street address                                                       lot on plan description          local government area
                                                                                                             (e.g. Logan, Cairns)
       Unit      Street     Street name and official suburb/       Post.    Lot no.         Plan type
        no.      no.        locality name                          code                     and plan no.


                            NooSa             I<   Spif                         IILJ..      Met!             SArt5h if1e_"       &Ufo
                           11’[14 <<.d-e-      f3olf’C/)                                    B3Gf/07
                              Dn’ve"/ !vbos,< !lea_d~




                       2                                                                 Request to change an existing approval template
                                                                                                                 Version 1.1 March 2010

Page 8

     DDD

 Table C-premises coordinates (appropriat.e fOT development in remote areas, over part of a lot or in water e.g. channel
 dredging in Moreton Bay)

 Coordinates                                                          lone          Datum             Local government
 (note:place each set of coordinates in a separate row)               refer’ence                      area (if   applicable)
 Easting           Northing       Latitude            Longitude


                                                                                    D GDA94
                                                                                    D WGS84
                                                                                    D Other


15. Details of the proposed change
           of/ached.
IA5
 6. Is owner’s consent required for this request? (refer to notes at the end of this form for more information)



 ~ No
 o Yes-complete either table D      or table E as   applicable


 Table D


 Name of owner of the land


 I, the above.mentioned owner of the land, consent to the making of this request.

 Signature of owner of the land



 Date



 Table E

 Name of owner of the land
                                         I
 D The owner’s written consent is attached




               3                                                        Request to change an existing approval template
                                                                                                Version 1 1 March 2010

Page 9

       ODD

    7- Does the irequest involve a state resource prescribed under the SustaInable Planning Regulation 2009. schedule
    14? (e.g.the application involves state land, or taking quarry materials. Refer to the notes at the end of this form for more
    i nformati 0n)



    D     No
                             IRI Yes-the written agreement of the chief executive from whom evidence     wou Id need to be obtained

                                    under the Sustainable PlanningAct 2009. section 254(1) must be attached.




    8. Has a pre.request response notice been given for this request?



    ~ No
    D Yes-a copy of the pre.request response notice must be attached to this request

    9. Is a copy of this request required to be given to another entity under section 372 of the Sustainable PlanningAct
    2009? (refer to notes at the end of this form for more information)

    D No
    ~ Yes-complete Table F

    Table F


    A copy of this request has been provided to the entities identified below (provide details for each entity given a copy of the

    request and the date the copy was given)

    ~ Assessment manager for the
          original application
                                                  ~(/’f:h Ire.-      Cf
                                                                                      Rt;;,blc&. 6’ot          raC; I.


    D Concurrence agencies for the
          original application

    D Any other entity prescribed by
          a   regulation


    10. Provide details of any other         supporting information attached to this request



    Jwsftf!,’adio,.,
I   ~:se.d C cepf
     &>>se_q,             d..v-~t..J;   S,
                                             ’GMP


    Notes for completing this template
    . This template is not an approved form under the Sustainable Planning Act 2009. The entity responsible for deciding the

      request may have their own form for the purpose of making a written request to change an existing development approval.
      A change to an existing development approval may involve:

      o       a   change to an approval given by the assessment manager
      o       a   change to a condition imposed by a concurrence agency
      o       a   change to an approval given by the Minister under a Ministerial call in
      o       a   change to a condition imposed by the Minister under a Ministerial direction
      o       a   change to an approval given by the Planning and Environment Court

                      4                                                         Request to change an existing approva/templale
                                                                                                       Version 1 1 March 2010

Page 10

.~




          DDD
     Question 6:
      Under section 371 of the Sustainable Planning Act 2009, if the person making the request is not the owner of the land to
      which the approval relates, the request must be accompanied by the owner’s consent.
     .However, owner’s consent is not required if the approval:
      o     relates to land that was acquisition land to which section 263(2)(d) of the Sustainable Planning Act 2009 applied
            when the application for the approval was made
      o     is for building work or operational work for the supply of community infrastructure on land designated for the
            <community infrastructure, or
      o     the consent of the owner would not be required under section 263(1) of the Sustainable Planning Act 2009 if a

            development application were made for the requested change
      Also, owners’ consent is not required if the responsible entity is satisfied that:
      o     the number of owners of the land make it impracticable to obtain owners’ consent, and the requested change does
            not materially affect the owners’ land, or

      o     having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the
            requested change does not materially affect the owner’s land.

     Question 7:
      Section 370(3) and (4)of the Sust?inable Planning Act 2009 requires that if an application for the development approval

      were made at the time of   making this request and evidence under section 264(1) of the Sustainable Planning Act 2009
      would be required to support the application, this request must be accompanied by the written agreement of the chief
      executive from whom evidence would be required under section 264(1). (Section 264 of the Sustainable Planning Act 2009

      provides that if a development involves a State resource, a regulation may require the application to be supported by
      certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the

      State resources for which evidence is required to be given, and the evidence required, to support the application.)


      Question 9:
      Section 372 of the Sustainable Planning Act 2009 requires that a copy of the request be given to:

      o     the assessment manager for the original application, if the request is made to a concurrence agency, the Minister, or
            the court
      o     any concurrence agencies for the original application, if the request is made to the assessment manager for the
            original application, the Minister or the court
      o     any other entity prescribed by a regulation.
      However, a copy of the request is not required to be given to an entity that has given a pre-request response notice for the
       request.




     OFFICE USE ONLY



      Date received                                            Reference numbers




                      5                                                       Request to c/1ange an eXisting approval template
                                                                                                      Version 1.1 March 2010

Page 11

Noosa River Spit Erosion Protection [OPW11/0116]
Porposed Permit Amendments
PROPOSED CHANGE 1 :EXTENSION OF TIME


   .   DEEDI Operational Works (Interference with Marine Plants / Waterway Barrier) Permit Condition 6 amended from


            "Due to the migration and spawning activities of commercially and recreationally important species of fish
            within the area, dredging works must not be undertaken:

            during the months ofJune and July; and
            during the two days prior, the days of. and the two days after the new and full moons in the month ofAugust,"
       to read


            "Due to the migration and spawning activities of commercially and recreationally important species of fish
            within the area, dredging works must not be undertaken:
                                                                                                                           "

            during the two days prior, the days of. and the two days after the new and full moons in the month ofAugust.


   .   DERM Operational Works Permit SPCC01881911 Condition A 1 amended from


           "This development permit authorizes the Stage 7 works for a period of 72 months from date of approval that is
            for erosion protection works within Noosa River on USL adjacent to Lot 774 on Plan MCH839707 indicated in
            Table 7, Plans and Documents"


       to read


            "", for a period of 24 months from date of approval ","


   .   DERM ERA 161(b) Permit SPCE01881811 Condition A1 amended from


                 "This development permit authorizes ERA 76 7(b)dredging for a period of 72 months, from the date of
                 approval ","

       to read

                 "

                  ’"
                       for a period of 24 months from date of approval","



PROPOSED CHANGE 2 :DESIGN AMENDMENT


       Change to all permits to reflect amended design drawings [listed below] that incorporate the proposed rock wall
       component at the end of Noosa R Spit and corresponding revised Concept Environment Management Plan
       [Revision C),

                 NRS-001 rev C                                     NRS-016                   [new drawing]
                 NRS-002 rev C                                     NRS-017                   [new drawing]
                 NRS-003 rev B                                     NRS-008 rev C
                 NRS-004 rev B                                     NRS-009 rev B
                 NRS-015              [new drawing]                NRS-010 rev C
                 NRS-006 rev B                                     NRS-011 rev B
                 NRS-007 rev B                                     NRS-012 rev C

Page 12

                                                                   DRAWING REGISTER
                            International                          01.05.2012 REVC
                                                                   NRS-001   lONG-TERM STRATEGY

                          Coastal                                  NRS-002
                                                                   NRS-003
                                                                             PROPOSED STAGE 1 WORKS
                                                                             SUBMERGED CLOSURE LAYOUT
                                                                   NRS-004   SUBMERGED CLOSURE TYPICAL CROSS-SECTION

                          Management                               NRS-015
                                                                   NRS-006
                                                                             WALL AND GROYNE LAYOUT
                                                                             GROYNE TYPICAL CROSS-SECTION
                                                                   NRS-007   WALL TYPICAL CROSS-SECTION
OFFICE 50/ G Arm, SYC Marina, Main Beach, 4217, QlD, Australia
                                                                   NRS-016   WALL CROSS SECTIONS (A&B)
POST PO Box 306, Main Beach lPO, Main Beach QlD, 4217, Australia   NRS-017   WALL CROSS SECTIONS (C&D)
TELEPHONE     -+B1 755640564       FAX   -+B1 755329147            NRS-008   DREDGE AREA LAYOUT
WEBSITE    www.coastalmanagement.com.au                            NRS-009   DREDGE AREA TYPICAL PROFILE
                                                                   NRS-010   NOURISHMENT TYPICAL PROFILE

NOOSA RIVER SPIT                                                   NRS-011
                                                                   NRS-012
                                                                             NOTES
                                                                             VEGETATION

EROSION PROTECTION WORKS

Page 13

                                                           l..c                                                                                                                                         ’.Il!!:;
    ~                                                                  ~:-,:-"
                                                                                                                                                                              :~’- ^,..~;~
!
-~,\, r r,
     1’.;1
                                                                       II
                                                                            ~;
                                                                                                                                                                        ~




                                                                                                                                                                        ..1
                                                                                                                                                                                  "




                                                                                                                                                                                      ~.
                                                                                                                                                                                             ;~~~{;:,   ’1         -




                                                                                                                                                                                      f-I   i’
                                                                                                                                                                                                  ,.

                                                                                                                                                         ~k~-
                                                                                                                                                        ~’"
                                                                                                                                                                         lj~~~.
                                                         ,j                                                                                                               ..i..




                                                                                                                                                                         1;’




                                                                                                                                                    ;],10         .f~.(’,",:
                                                                                                                                                       ~{J,_.."FJ’: ~,
                                                                                                                                                            ,-,



                                                                                                                                                                   ~;
                                                                                                                                          ~r;,                    ~l



                                                                                                                                  "



                                                                                                                         r                                                                                                                   Retain existing rock wall [maintain I
                                                                                                              ....~                ,-,    ._.   rt;’                                                                                         upgrade)
                                                                                                                                 :, ~,--It~I~’                                                                                               Submerged Curved channel "Closure"
                                                                                               \..’J                               ~!_.         l
                                                                                                                                                                                                                                             enclosing lagoon
                                                                                                                                                                                                                                             Wall at end of Noosa River Spit
                                                                                                                                  :~                                                                                                         Groyne I Training Wall
                                                                                                                             J~:_ ’~                                                                                                         2 short groynes
                                                                                                                                                                                                                                             Dredging for interim navigation
                                                                                                                                                                                                                                             Foreshore nourishment
                                                                                                                                                                                                                                             Removal of dead trees (marine plants)
                                                                                                                                                                                                                                             as required
                                                                                              .~       ,
                                                                                                                                                                                                                                             Monitoring program
                                                                                                                                                                                                                                             Maintenance of all structures


                                                                                                                                                                                                                                     For details of strategy, refer ICM report
                                                   ",                                                                                                                                                                                "Option Review Noosa River Spit’
                                                                                                                                                                                                                                                         -




                                                        ;’i"
                                                                                                                                                                                                                                     For proposed works [Stage 1), see NRS-002


                                                                                                                                                                                                                                     No works wtthin Noosa River Fish Habitat
                                                                                                                                                                                                                                     Area.
                                                                  :;, ..~.        :
                                       I
                                                                                                                                                                                                                                     A Coastal Management District has not been
                                 ,’~_i                                    tj.~~
                                                                                               <
                                 ..,   .f                         .A~:           ’t

                                                                                                            t’                                                                                                                       declared for this area. The Erosion Prone
                                  (’                                ~t
                             ,;        J                                                                                                                                                                                             Area is the full width of the Spit
                                     .
                            .,
        "

                                                                                                       1",(:                                                                                                           Submergec;l
        ,              II                                                                                  ’t~.                                                                                                                      Aerial photo from Google [June 2008).
        ",::11                                             -   ;-.~.
                                                                       ’-~r:..                               r:=.                                                                                                                    Channel configurations have altered.
                                                                                                   t’...~--,,:r~_
                                 ~                                     If                                  (’~l



                                                                                      ,,:fl
                                "J                                "

                                  ~_.                      ’i,’"                                                  t’:-
                                           l       ~’1 4 ,Y’
                                       In,:"",



                                           1;;.
             .

                        I,   i~
                     \ ..:l! ?"’;.:/".,,
                 .




                            .                              L

                                 ’!S’_ I,’

                                                                                                                                                                                                                                                                       ’ffl:;(’1.,.<,I’~,fi
                                                                                                                                                                                                                                                                           "’’1;!>i~.,_",*"",,, I




                                                                                                                                                                                                                                                             Management
                                                                                                                                                                                                                                     OFACE 50 IG Arm. SYC Malna, MaIn Be      4217, at 0,Auslralta
                                                                                                                                                                                                                                     eoST PO Box n,Miln Bea::.h LPO, Man Be    hClD. 4217. Au9raha
                                                                                                                                                                                                                                     TElEPHOOE    ,,’/~             FIIX    ’&ltblillll41
                                                                                                                                                                                                                                     ~ft’wtMSI.1.l1.1nagerrllMl;;;mal


                                                                                                                                                                                                                                               NOOSA RIVER SPIT



                        f"
                                                                                                                                                                                                                                                                                               c

             o                         ~

             ~                         ~
                                               -




             I’
             o
             Ii)

Page 14

7081900

                                                                                                                                                                                                                                                  -t-
                                                                                                                                                                                                                                                     I


7081800


                                                                                                                                                                                                                                                             NOTES

                                                                                                                                                                                                                                                             1.   Proposed Stage 1 Works:
                                                                                                                                                                                                                                                                     . Retain existing rock wall [maintain I
                                                                                                                                                                                                                                                                       upgrade]

                                                                                                                                                                                                                           4~                                        .




                                                                                                                                                                                                                                                                      .
                                                                                                                                                                                                                                                                       Widening of existing footpath for
                                                                                                                                                                                                                                                                          construction access
                                                                                                                                                                                                                                                                          Northern section of submerged
                                                                                                                                                                                                                                                                          channel closure



                                                                                                                                                                                                                            T                                         .


                                                                                                                                                                                                                                                                      .


                                                                                                                                                                                                                                                                      .


                                                                                                                                                                                                                                                                      .
                                                                                                                                                                                                                                                                       Wall at end of Noosa River Spit
                                                                                                                                                                                                                                                                       Groyne /Training Wall
                                                                                                                                                                                                                                                                       Dredging for interim navigation
                                                                                                                                                                                                                                                                       Removal of dead trees (marine plants)
                                                                                                                                                                                                                                                                       as required
7081700
                                                                                                                                                                                                                                                                      .   Foreshore nourishment
                                                                                                                                                                                                                                                                      .   Monitoring programme
                                                                                                                                                                                                                  Existing footpath [brown line] clearing
                                                                                                                                                                                                                  required & to be widened for
                                                                                                                                                                                                                                                             2.    Hydrographic survey by SC RC on 23rd
                                                                                                                                                                                                                                                                   November 2010.
                                                                                                                                                                                                                  construction access [dashed red line]

                                                                                                                                                                                                                                                             3.    Works to be undertaken in accordance with
                                                                                                                                                                                                                                                                   "Noosa River Spit Concept Environment
                                                                                                                                                            Submerged channel closure to                                                                           Management Pian" prepared by ICM.
                                                                                                                                                               limit channel migration [see
                                                                                                                                                           drawing -003 & -004 for details]                                                                  4.    Drawings to be read in conjunction with
                                                                                                                                                                                                                                                                   Notes on drawing NRS-011.

                                                                                                                                                            May be extended                         I


7081600
                                                            ’
                                                                                                                                                            along proposed alignment
                                                                                                                                                                                       ~           ’/   J
                                                                 "




                              I                                      f
                                                                                                                                                                          ~
                                                                                                                                                                                              ~>’
                                                                                                                                                                                              ,I


                                                                     Groyne I Training Wall to limit
                                                                                                                                                                                          /-:
                              I                                      channel migration [see drawing
                                                                     -015 & -006 for details)
                                                                                                       "
                                                                                                              ,


                                                                                                                                                   k                                ~,1



                                                                                                                           ._,..-            -
                                                                                                                                                 -::-::::::- --
                                                                                                                                                       I

                              I                         /
                                                            ’-
                                                                                                                   --


                                                                                                                  :$
                                                                                                                       ...._
                                                                                                                               _--::----   ’>.




                                                                                                       ....

7081500
                              ~                                           -   .....__


                                                                               -:-.’""..=:.--~
                                                                                                                                                                                                                                                             Structure Crest


                                                                                                                                                                                                                                                             Structure Toe
                                                                                                                                                                                                                                                                                                (-’:"<<#~.~.~ ;’~.’J



               Sand Filled Geotextile Container                                                                                                                                                                                                              Dredge Area
               Wall [see drawing -015 &-007 for
               details                                                                                                                                                                                                                                       Nourishment Area


                                                                                                                                                                                                                                                             RP Boundary

                          1

                              1
7081400
                                      ,




                              I
                                      ~




                                                                                                                               Lot 114
                                                                                                                       MCH839107


                                                                                                                                                                                                                                                                                        International


          ’-
                                                                                                                  RP Boundary
                                                                                                                                                                                                                                                         I        ~                    Coastal
                                                                                                                                                                                                                                                                                       Management
                                                                                                                                                                                                                                                                  ()fACE 50 IG AmI SYC Man... Man Be""4217. a.o. _ia


7081300
          ’,-                 t   ’




                                                                                                                                                                                                                                                     1            P
                                                                                                                                                                                                                                                                  ffi:
                                                                                                                                                                                                                                                                  wn
                                                                                                                                                                                                                                                                       POIloxJE, ManB_LPO,Mar>B, a.o,4217,""’’’’’’
                                                                                                                                                                                                                                                                     PHONE -061 ,_        FAX -061’;oJ’B141
                                                                                                                                                                                                                                                                            _C08S1am"_""’C..,

                                                                                                                                                                                                                                                             PROJECT NAME




                                                                                                                                                                                                                                                         I                  NOOSA RIVER SPIT




                                                                                                                                                                                                                                                         I
                         o                        o                                                                                              o                                         o                o                                      o
                         o                        o                                                                                              o                                         o                o                                      o
                         ’"                       <D                                                                                             m                                         o                ~                                      N
                                                  r--                                                                                            r--                                       <Xl              <Xl                                    <Xl
                         t;                       o                                                                                              o                                         o                o                                      o
                         ’"                       ’"                                                                                             ’"                                        ’"               ’"                                     ’"

Page 15

                                                                                                                    Existing Footpath
                                                                                                                                                                                                       r.~\
                                                                                                                                                                                                       -N-
                                                                                                                                                                                                       ,:J
                                                                                                                                        Excavation not
                                                                                                                                        to   Jndermine
                                                                                                                                        existing rock wall




7081700
                                                                                                                                                                                                                   1.     Container layout indicative only.


                                                                                                                                                                                                                   2.     Works to merge wrth existing rock wall.
                                                                                                                                                                                                                          Rock to be placed as required to
                                                                                                                                                                                                                          connect the two structures smoothly.
                                                                                                                                                                                                                          Works to be in accordance wrth
                                                                                                                                                                                                                          separate rock wall appro\(aL

                                                                                                                                                                                                                   3.     Closure centreline as per table below.
                                                                                                                                  /

                                                                                                                                   /
                                                                                                                                                                                                                               Stage 1    -
                                                                                                                                                                                                                                              Submerged Closure
                                                                                                                                  "/

                                                                                                                                        /                                                                                              Crest Centreline
                                                                                                                                         /                                                                               Point         Easting               Northing
                                                                                                                                         /
                                                                                                                                             /                                                                                        508059.9            7081711.1
                                                                                                                                                                                                                           C,
                                                                                                                                                 /
                                                                                                                                                                                                                           C,         508058.5            7081691.6
                                                                                                                                             /       /
                                                                                                                                                       /                                                                   C3         508054.9            7081672.1
                                                                                                                                                 /
                                                                                                                                                     /  /                                                                  C.         508049.0            7081653.0
                                                                                                                                                              /
                                                                                                                                                      /
                                                                                                                                                                                                                           C.         508040.4            7081634.9
                                                                                                                                                          /       /
                                                                                                                                                                                                                           C.         508038.3            7081630.6
                                                                                                                                                              /
                                                                                                                                                                        >.
                                                                                                                                                                                                                           C,         508027.8            7081613.6
                                                                                                                                                                  /\/ \..                                                  C.         508016.7            7081596.9
                                                                                                                                                                      \.(    ~                                             C.         508004.2            7081581.3

                                                                                                                                                                                                                           C,o        507990.5            7081566.7
                                                                                                                                                                        /       /

                                                                                                                                                                                                                           C11        507975.8            7081553.1
                                                                                                                                                                        /                                                                                 7081540.5
                                                                                                                                                                                 /
                                                                                                                                                                                                                           C12        507960.3
                                                                                                                                                                                                                                      507944.0            7081528.9
                                                                                                                                                                            /
                                                                                                                                                                                 /                                         C13
                                                                                                           /                                                                                                                                              7081517.9
                                                                                                                                                                                                                           C,.        507927.3
                                                          Closure may be                                        v                                                            /
                                                                                                                                                                                    /
                                                                                                                                                                                                                           C,.        507910.2            7081507.5
                                                          extended along design                        /       .,
                                                                                                                                                                             /
                                                                                                                                                                                     /                                     c,.        507892.9            7081497.5

                                                          alignment if                                                                                                               )..                                   C,7        507888.7            7081495.2
                                                                                                                                                                                                                                      507890.6            7081484.0
                                                          desired/required                                                                                                      ’,-< ). /                                  C,.
                                                                                               /                                                                                          /
                                                                                                                                                                                   ’’v             /

                                                                                                       /                                                                                   ,
                                                                                                                                                                                               /
                                                                                                                                                                                                       /
                                                                                                                                                                                                           /
                                                                                                                                                                                                               /
                                                                                                            /                                                                                      /               4. Refer to addrtional drawings


7081600
                                                                                          ’L"      I       I

                                                                                                                                             Jootpath                                                  /
                                                                                                                                                                                                           /
                                                                                                                                                                                                               /          Typical x-section
                                                                                                                                                                                                                          Nourishment
                                                                                                                                                                                                                                                      NRS-004
                                                                                                                                                                                                                                                      NRS-010
                                                                                                /
                                                                                  -,/          ~
                                                                                                                                                                                                                          Notes                       NRS-Ol1
                       .   ---   -   -
                                         .--+--


                                                                                         ~1                                              l                                                                         LEGEND


                                                                                                                                                                                                                   Sand-filled geotextile

                                                                                                       "
                                                                                                                                             I                                                                     mega-container


                                                                                               /                                                                                                                   Nourishment Area


                                                          "
                                                                                          /
                                                                                               C9                                            I                                                                     RP Boundary


                                                                 \
                                                                ,
                                                                                                                          op of Bank
                                                                                         "


                                           I                                      /                                                          I
                                                                                   G~O
                                           I                                      /                                                          I
                                                               2"
                                           j                                                                                                 I
               <
                                           f                                                                                                 I
               ,




                                                                                                                                                                                                                                                 International
              \’
          \                                                                                                                                                                                                                                      Coastal
                                                                                                                                                                                                                                                 Management
                                                                                                                                                                                                                        OFACE 5:J IG Am\ SYCMir>na. ....nBea;I\ 4217, CW,Ausltalia
                                                                                                                                                                                                                        P    po Box 3::6, MalnBe LPO. Moo Be       QO,4217,Australia
                                                          ~                                    Existing Footpath
                                                                                                                                                                                                                        iREPHONE <6’1_      FAX <6’/~’41

                                                                                                                                                                                                                        ~VNlWcoasIakn;mgemert,Cau
                                                  -----
                                                                                                                                                                                                                   PRO.ECTN      E

7081500                                                                                                                                                                                                                              NOOSA RIVER SPIT
                                                                                                                                             +
                   -

                                                                                                                                                                                                                   CRA’MNG nTLE


                                                                                                                                                                                                                        SUBMERGED CLOSURE LAYOUT




                                                                                         o
                                                                                         o
                                                                                         o
                                                                                         co
                                                                                         o
                                                                                         L()

Page 16

                                                                                                                                                                             Crest height such that structure is partially
                                                                                                                                                                             emergent on very low tides only.

                                                                                                                                                                             Extent of works to be restricted to limits
                                                                                                                                                                             shown on drawings. Container configuration
                                                          West side:                                           East side:                                                    to achieve design may vary.

                                                          Backfill to levels                                   No Backfill required
                                                                                                                                                                             Profile based on survey by SCRC on 23rd
                                                          as per NRS-003                                                                                                     November 2010.

                                                                                <t                                                                                           Excavation
                                                                                                                                                                         4.1.       Baiters may be formed by an equivalent


                                                                                                               ================_==~t~=================                              box cut.
                                                                                                                                                                                    Expected volume to be disturbed
                                                                                                                                                                                    [closure]: 5950m’. May vary with
                                                                                                               -------------------~~~-----------                                    seabed changes.
                                                                                                                                                                                    Material is clean sand suitable for beach
                                                                                                                                                  LAT                               nourishment.
                                                                                                                                                                         4.4.       Excavated material may be used for
                                                                                                                                                                                    .   construction [filling containers]
                                                                                                                                                                                    .   backfilling adjacent to structure
                                                                                                                                                                                    .   foreshore nourishment.
Anticipated excavated profile                                                                                            2
[may vary)                                                                                                                                                              5.   Optional additional tube may be placed as
                                                                                                                                                                             part of initial works or placed [if required] in
                                                                                                          -
                                                                                                               RL -5.80m AHD                                                 response to monitoring.




                      Optional 1 m geotextile tube                             1.7m
                                                                                                1mL                                                                          Refer to add~ional drawings
                                                                                                                                                                                Plan layout
                                                                                                                                                                                Notes
                                                                                                                                                                                                          NRS-003
                                                                                                                                                                                                          NRS-Oll
                      with flap [if required)




                                                          West side:
                                                          Backfill to levels
                                                          as per NRS-003
                                                                                 <t   Nourished Profile


                                                                                                                                       -==========~~================
                                                                                                                                      ------------~-----------------
                                                                                                                                             -----~~~----------------
                                                                                                                                                  LAT




                                                                                                              Excavated slope such that
                                                                                                              existing rock wall not to be
                                                                                                              undermined




                          Optional 1 m geotextile tube
                                                         _/                                 Geotextile flap

                          with flap [if required)                                                                                                                                                      International

                                                                                                                                                                             [fJ                      Coastal
                                                                                                                                                                                                      Management
                                                                                                                                                                             OfFICE 00I G hm.SYC Malna, Mao1 Be.,~ 4217. OLD....,."".
                                                                                                                                                                             "P     o Box:il:l, Man Beo:h lPO.Main BeOlO. 4:l11. Ausral’il
                                                                                                                                                                             iREPHONE ..ti1/~       FAX.obl (~14(

                                                                                                                                                                             ~WflWC08SIaknanagemenl    au




                                                                                                                                                                        PRQ.EcrNME

                                                                                                                                                                                        NOOSA RIVER SPIT

                                                                                                                                                                        ORA’MNG TItlE
                                                                                                                                                                                    SUBMERGED CLOSURE
                                                                                                                                                                                 TYPICAL CROSS-SECTION

Page 17

                                                                                                                                                           ’" -1.0          ----------,
                                                                                                                                                                                 /
                                                                                                                                                         \~~                              -2,0

                          ?
                          \
                          \
                                                                                                                                                          -\,0
                                                                                                                                                                        ~~~
                                                                                                                                                                     /-/’


    )
                              "-
                                ’/
                                                                                                                                                         /
                               V-IO                                                  o
                                                                                                     /j

 (                                                              /
                                                                        /
                                                                               /.’
                                                                        _.----//
                                                                                         -1,0

                                                                                                                                                                                                        CONTAINER LAYOUT INDICATIVE
                                                                                                                                                                                                        ONLY.


                                                                                                                                                                                                        CENTRELlNE OF CREST AS PER
                                                                                                                                                                                                        TABLE BELOW


                                                                                                                                                                                                                Stage 1   -

                                                                                                                                                                                                                              Groyne and Wall
                                                                                                                                                                                                                    Crest Centre line

                                                                                                                                                                                                        Point       Easting                   Northing

                                                                                                                                                                                                        G,         507685.8              7081499.4
                                                                                                                                                                                                        G2         507679.0              7081491.3
                                                                                                                                                                                                        GJ         507591.6              7081384.8

                                                                                                                                                                                                   3.   ROCKWALL TO FOLLOW TOP OF
                                                                                                                                                                                                        BANK.


   ~                          p                                                                                         --?
                                                                                                                       /’            ---
                                                                                                                                                                                                   4.   REPLACES DRAWING NRS-005




    )/\                                                                                                   ",
                                                                                                                  l’   _/
                                                                                                                            /
                                                                                                                              -\,0
                                                                                                                                                                                                   5.   REFER TO ADDITIONAL DRAWINGS
                                                                                                                                                                                                        TYPICAL X-SECTION
                                                                                                                                                                                                                 (GROYNE)
                                                                                                                                                                                                                                               NRS-006


                                                                                                                                                                                                        TYPICAL X-SECTION                      NRS-007

            ~o                                                                                                   ---
                                                                                                                                                                                                                  (WALL)
                                                                                                                                                                                                        CROSS SECTION A & B                    NRS-0016
                                                                                                                                                                                                        CROSS SECTION C & D                    NRS-0017
                                                                                                                                                                                                        NOURISHMENT                            NRS-010



                          y.                                                                                                                                                                       6.
                                                                                                                                                                                                        NOTES


                                                                                                                                                                                                        RETURN TO BE EXTENDED AS
                                                                                                                                                                                                                                               NRS-011




                                     ~
                                     l
                                                                                                                                                                                                   7.
                                                                                                                                                                                                        REQUIRED BY ONGOING EROSION.


                                                                                                                                                                                                        HYDROGRAPHIC SURVEY
                                                                                                                                                                                                        UNDERTAKEN BY GPS HYDRO ON
                                                                                                                                                                                                        28TH JANUARY 2012.




PROPOSED
ROCK WALL




                                                                                                                                                                                                  ~ Mangroves
                                                                                                                                                                                                  -       RP boundary


                                                                                                                                                                                                  -
                                                                                                                                                                                                          Top of Bank




                                                                                                                                                                                                                               International

                                                                                                                                                                                                     ~                        Coastal
                                                                                                                                                                                                                              Management
        S’----                              J
                   ’-,
                     "-
                                                                                                                                                                                                    OfFICE 5QIG "’"SYCMna, Marl Bea::l\4217. QO,""’rala

                         \                                                                                                                                                                          P     po Box.ib. MaIn BerlI LPO,Man BeClD. 4L1/, AlBraha
                                                                                                                                                                                                    iR’EPHONE -061 f~              FAX    ..til/!b.W141
                                                                                                                                                                                                    ~WffWcoasIarn;r                      aJ


                          ,                 "

                                                                                                               TOE TO LINK WITH WALL RETURN
                          ~o                    "
                                                                                                                                                                                                 PRo.ECf NAME

                                                                                                                                                                                                                NOOSA RIVER SPIT
                                                ) \-"                                           \,             (FOLLOW NATURAL PROFILE. NO EXCAVATION)
                                                \           "..:.
                                                                                                                                                                                                 CRA’MNGnTlE
                                                                                                                                                                                                                          Rock Wall
                                                    ’’’-,
                                                        "                                                                                                                                                                     Layout
                                     \                      \
                                     \                        ,



                                      \._                           "




             7.5         15

Page 18

                                                                                                                                                                                   Crest height such that structure is fully
                                                                                                                                                                                   emergent. May experience some
                                                                                                                                                                                   overtopping during significant flood events
                                                                                                                                                                                   [particularly with high levels of surge and/or
                                                                                                                                                                                   waves].

                                                                                                                                                                              2.   Extent of works to be restricted to limits
                                                                                                                                                                                   shown on drawings. Container
                                                                                                                                                                                   configuration to achieve design may vary.

                                                                                                                                                                                   Profile based on survey by SCRC on 23rd
                                                                                                                                                                                    November 2010.


                                                                                                                                                                              4.   Excavation
                                                                                                                                                                               4.1.      Baiters may be formed by an
                                                                                                                                                                                         equivalent box cut.
                                                                                                                                                                               4.2.      Expected volume to be disturbed [wall
                               ct.                                                                                                                                                       & groyne]: 17,600mJ. May vary with
      East side:                                                 West side:                                                                                                              seabed changes.
                                                                                                                                                                               4.3.      Surface sediments are clean sand
      No Backfill required                                        Backfill to RL -3m AHD [min)
                                                                                                                                                                                         suitable for beach nourishment.
                                                                                                                                                                               4.4.      Material below RL -4.5m AHD may
                                                                                                                                                                                         contain acid sulphates.
                                                                                                                                                                                         NOT to be placed above LAT.
                                     RL +1.5m AHD
                                                                                                                                                                                         To be used for.
                                                                                                                                                                                         o    construction [filling containers]
                                                                   _________________________HM                                                                                           o    backfilling
                                                                   -------------------------MH~
                                               ---------------     -------------------------
                                                                                            AHD                                                                               5.    Optional additional container may be placed
                                                                                                                                                                       MLWS         as part of initial works or placed [if required]
                                                                   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _




                                                                                                                                                                                    in response to monitoring.
NSL
                                                                                                                                                                              6.    Refer to additional drawings
                                                                                                                                                                                      Plan layout             NRS-005
                                                                                                                                                                                      Notes                   NRS-011
                                                                                                               Anticipated excavated
                             Geotextile flap
                                                                                                               profile [may vary)


                                                              Up to RL -5.90m AHD as required
                                                              -




       _j1m                            16.8m            1m~       Optional 1 m geotextile tube
                                                                  with flap [if required)




                                                                                                                                                                                                            International

                                                                                                                                                                                   ~                        Coastal
                                                                                                                                                                                                            Management
                                                                                                                                                                                   OFFICE 5J1 G """SiC........ Man _ 4217, OlD,""’rilla
                                                                                                                                                                                   P  o Box:il>, MaIn BedllPO.Mail Be OlD. 4111. AtB~1a
                                                                                                                                                                                   iPHONE 4:)1 (~             FAX .ob"1/tblS141
                                                                                                                                                                                   WijSiT’EWNWCOarn~               aJ




                                                                                                                                                                              PRO-ECT NAME

                                                                                                                                                                                             NOOSA RIVER SPIT


                                                                                                                                                                                              GROYNE TYPICAL
                                                                                                                                                                                                    X-SECTION

Page 19

                                                                                                                                                             Crest height such that structure is level with
                                                                                                                                                             NSL (or as close as practicable). Will be
                                                                                                                                                             overtopped on high tides.

                                                                                                                                                             Extent of works to be restricted to limits
                                                                                                                                                             shown on drawings. Container configuration
                                                                                                                                                             to achieve design may vary.


                                                                                                                                                             For excavation notes, see drawing NRS-{)06.


                                                                                                                                                        4.   Optional additional container may be placed
                                                                                                                                                             as part of initial works or placed [if required]
                                                                                          Backfill to RL -3m AHD [min]                                       in response to monitoring.


                                                                                                                                                        5.   Refer to add~ional drawings
                                                                                                                                                               Plan layout             NRS-{)05
                     Top of bank                                                                                 Anticipated excavated profile                 Notes                   NRS-{)11
                                                                                                                 [may vary]
  NSL [varies]
                                                                                                                _______________________________HM
----------                                                                                                      -------------------------------MH~
                                                                                                                ------------------------------
                                                                                                                                                 -AHD
                                                                                                                -------------------------------ML~
                                                                                                                -------------------------------LM
                 Geotextile underlayer
                                                                       ~~~~~\;.~~:~..~~
                                                             ~~.~~~~

                                   Geotextile flap




                                                     14.0m
                                                                                               Optional 1 m geotextile tube with flap
                                                                                               [if required]




                                                                                                                                                                                     International
                                                                                                                                                                                    Coastal
                                                                                                                                                                                    Management
                                                                                                                                                             ~50 IG Arm. SYC Manr MaIn Be h, 4217, OLD, /lJJstraha
                                                                                                                                                             f:Qg, poeox:m, ManBe LPO. Man Bea::h OLD, 42t7,Ausaralla
                                                                                                                                                             ~<          ll_          m.t)11~41
                                                                                                                                                             ~.".".coastam;ngemen:_com_aJ

                                                                                                                                                        PRO..ECT NAME

                                                                                                                                                                        NOOSA RIVER SPIT

Page 20

                                                                        CREST OF ROCK TO TRANSITION FROM
                                                                        RL 1.5M (A-A)TO TOP OF BANK (B-B)

                                                                               ADJACENT CREST CONTAINER
                                                    RL +1.5m
                                                                 _
                                                                     _~
                                                                      ~                            HM

                                                                  --===-~==========================~~=====================
                                                                                                                                         AHD


                                                                                                                                         MLWS                  1.1      FLOOD TIDAL CURRENT 2.5m/s
                                                                                                                                                               1.2      SIGNIFICANT WAVE HEIGHT
                                                                                                                                                                        0.75m
                                                                                                                                                               1.3      WILL BE OVERTOPPED IN KING
                                                                                                                                                                        TI DES OR FLOOD EVENTS
             UNDER ADJACENT CREST CONTAINER AND                                                                                                                1.4      FLEXIBLE TOE TO ALLOW
                                                                                                                                                                        EROSION TO -6m AHD
                  OVERLAP WITH ADJACENT LOWER BAG
                                  GEOTEXTILE FLAP                                                                                                     2.0      GEOTEXTILE UNDERLAY TO BE
                                                                                                                                                               ELCOMax 600R OR EQUIVALENT WITH
                                                                                                                                                               1 M LAPS. PREFABRICATED SECTIONS
                                                                                                                                                               PREFERRED.


                                                                                                                                                      3.0      TOLERANCES
                                                                                                                                                               3.1       EXCAVATION +/-200mm
                                                                                                                                                               3.2       ROCK FINISH LEVEL +/-300mm
                                                                                                                                                               3.3       BATTERS MAY BE FORMED BY
                                                                                                                                                                         AN EQUIVALENT BOX CUT


                                                                                                                                                               ROCK SHALL BE SOUND IGNEOUS OR
                                                                                                                                                               METAMORPHIC ROCKS CLEAN AND
                                                                                                                                                               FREE OF TOPSOIL AND ANY ORGANIC
                                                                                                                                                               MATTER.


                                                                                                                                                               DIMENSIONS ARE IN METERS UNLESS
                                                                                    CROSS SECTION A-A                                                          SHOWN OTHERWISE


                                                                                                                                                               ROCKWALL DETAIL SAME AS CROSS
                                                                                                                                                               SECTION C-C.


                                                                                                                                                               IN THE EVENT OF SLUMPING ROCK
                                                                                                                                                               MAY NEED TO BE TOPPED UP AS
                                                                                                                                                               REQUIRED


                                                                                                                                                               BACKFILL MAY NEED TO BE
                                                                                                                                                               REINSTATED AFTER MAJOR EVENTS
                                                                                                                                                               TO ENSURE SAFE ACCESS




                                                                                                                                                      LEGEND

                                                                     CREST OF ROCK TO TRANSITION FROM
                                                                r RL 1.5M (A-A)TO TOP OF BANK (B-B)                                                                      GEOTEXTILE LAYER
                                                               /                                            ADJACENT CONTAINER PROFILE

                                                                                                                                         HAT

                                                               -------~--------                                                          MHWS

                                                                -------,------                                                           AHD


                                                                  ----2-----                                                             MLWS
                                                                                                 -------------------IXI---------------------




                                                                                                                                                ./’
                                                                                                                                          ./’
                                                                                                                                                                                       International
                                                                                                                                                                                      Coastal
                                                                                                                                                                                      Management
                                                                                                                                                            ()fACE 50 IG AIm SYC ",,",no. Moon Bea:I\ 4217. Wl,AusOr.iI
                                                                                                                                                            P   po Box 113. ManBea::h LPO,Mar1Bea::h<l.D. .(217, Alraba
                                                                                                                                                            iRfPHONE -.l/~                FAX 061 ftnW14f
                                                                                                                                                            ~WKWCO<*nar-egemet1.Cau



                                                                                                                                                      PRO..ECTNAME

                                                                                                                                                                       NOOSA RIVER SPIT


                                                                                                                                                                                   Rock Wall
                                                                                                                                                                               Cross Section
o        2    3       4    5m
                                                                                    CROSS SECTION B-B
    ___-__
1:100

Page 21

                                                                                                19.5 (MAX)




                                                                                                        14.4
                                                                                                                                                                HAT

                                                                          LEVEL WITH ADJACENT TOP OF BANK                                                       MHWS
                                                                          ~--------------------------------                                                 ----------------------------




                                                                                                                                                                AHD

                                                                                                        2 LAYERS
                                                                                                        ARMOUR ROCK                                             MLWS

                                                                                                    =~o~                                ===== ==== ==== = == =~========= == == ==========
                                                                                              -



                                                                                                               ~~~I~iT~E=                                                                             1.1
                                                                                                                                                                                                      1.2
                                                                                                                                                                                                                FLOOD TIDAL CURRENT 2.5m/s
                                                                                                                                                                                                                SIGNIFICANT WAVE HEIGHT
                                                                                                                                                                                                                0.75m
                                                                                                                 ARMOUR ROCK
                                                                                                                                                                                                      1.3       WILL BE OVERTOPPED IN KING
                                                                                                                 050   =   O.4m (min)                                                                           TIDES OR FLOOD EVENTS
                                                                                                                                           8.6
                                      CORE ROCK
                                                                                                                                                                                                      1.4       FLEXIBLE TOE TO ALLOW
                                050   =   O.25m (min)                                                                                                                                                           EROSION TO -6m AHD


                                                                                                                                                                                                      GEOTEXTILE UNDERLAY TO BE
                                            GEOTEXTILE UNDERLAY                                                                                                                                       ELCOMax 600R OR EQUIVALENT WITH
                                                            (SEE NOTES)                                                                                                                               1 M LAPS. PREFABRICATED SECTIONS
                                                                                                                                                                                                      PREFERRED.

                                          MINIMUM CORE THICKNESS                                                                                                                                      TOLERANCES
                                                                                                                                                                                                      3.1       EXCAVATION +/-200mm
                                                                                                                                4.5              .1                                                   3.2
                                                                                                                                                                                                      3.3
                                                                                                                                                                                                                ROCK FINISH LEVEL +/-300mm
                                                                                                                                                                                                                BATTERS MAY BE FORMED BY
                                                                                                                                                                                                                AN EQUIVALENT BOX CUT


                                                                                                                                                                                              4.0     ROCK SHALL BE SOUND IGNEOUS OR
                                                                                                                                                                                                      METAMORPHIC ROCKS CLEAN AND
                                                                                                                                                                                                      FREE OF TOPSOIL AND ANY ORGANIC
                                                                                                                                                                                                      MATTER


                                                                                                          CROSS SECTION C-C                                                                   5.0     DIMENSIONS ARE IN METERS UNLESS
                                                                                                                                                                                                       SHOWN OTHERWISE


                                                                                                                                                                                              6.0     IN THE EVENT OF SLUMPING ROCK
                                                                                                                                                                                                      MAY NEED TO BE TOPPED UP AS
                                                                                                                                                                                                       REQUIRED


                                                                                                                                                                                               .0      BACKFILL MAY NEED TO BE
                                                                                                                                                                                                       REINSTATED AFTER MAJOR EVENTS
                                                                                                                                                                                                       TO ENSURE SAFE ACCESS




                                                                                                                                                                                               -
                                                                                                                                                                                                                GEOTEXTILE LAYER




                                                                                                                                                                HAT
                                                                                                                                                      --




=========== ==== == === =======:::~~ ~.~ ~ -LEV~L~~H~~~~~~~~~~ ==== ======= == =                                                                       === == ==~~S======== == ============
                                                                                                                                                                AHD
                                                                            ----------------                                                               ------      --------- -
                                                                                                                                                                                - --------




                                                                                                                             ~-~~~T~O~P~;I~                     ~v:
                                                                                     ---




                                                                                            =~LArio~R~~~~ ====================L~=======================
                                                                                              050   =   O.5m
                                                                                                           )ffiin)
                                                                                                        /
                                                  CORE ROCK                                                    TAPERS FROM RL -3 TO TOP OF BANK
                                                      O.25m (min)                                              _I_
                                            050   =




                                                                                                                                                                                                                            International

                                                                                                                                                                                                1~                         Coastal
                                                                                                                                                                                                                           Managemoot
                                                                                                                                                                                                    OFACE !Xl/G AmI SYC Man", Man Be"’" 4217. CLO,_~
                                                                                                                                                                                                    POST POBoxDS,ManB_lPO,M",Be            CLO,4217,""’’’’’;a
                                                                                                                                                                                                    TELEPHONE <til/_              F     <til/oo:l’l41
                                                                                                                                                                                                    ~w."II’coasfalmaragemeri.         au




                                                                                                          CROSS SECTION D-D                                                                   PRO..ECTN     E

                                                                                                                                                                                                                NOOSA RIVER SPIT

                                                                                                                       (RETURN)
                                                                                                                                                                                                                         Rock Wall
                                                                                                                                                                                                                     Cross Section

       o       2   3   4   5m
       I
       ~______
       1:100

Page 22

7081900
           +        -I                       +-   --   --


                                                                         -i        ---


                                                                                                   i--    --   --
                                                                                                                         ~                                                     t                                               -~-
                                                                                                                                                                                                                               fN",)_
                I         1                  1                            I                                                                                                                                                     ~~


                I         I                  I                            I
                I                            I                            I                                                                                I
7081800         I                            I                            I                                                                                I
                                   --   --             -   -   _.   _.




                                                                          I                                                                                I
                                                                                                                                                                                                                                                 Dredging for interim navigation access
                                                                                                   I                                                                                                                                             ONLY. No ongoing maintenance dredging.

                                                                                                   I                                                       I                                                                               2.    Dredging is to be entirely within water
                                                                                                                                                                                                                                                 allocation area [NRS-RE-001].Final location

                                                                                                   I                                                       I                   I
                                                                                                                                                                                                                                                 & extent to be determined after pre-start
                                                                                                   I                                                                                                                                             survey to accommodate channel movement
                                                                                                                                                                                                                                                 prior to works.

                                                                                                   I                                                       I                   I                                                           3.    Middle channel presently dominant. Aerial
                                                                                                                                                                                                                                                 photo [Feb 2011] overlay is approximate
7081700
                                                                                                                                                                                                                                                 only.
                                                                                                                               i-
                                             t                                                     t--.              --             --   ----        -




                                                                                                                                                           f-                  i-              --.-                            --



                                                                                                                                                                                                                                      I-   4.    It is anticipated that dredging works will
                                                                                                                                                                                                                                                 include enhancement [widening &

                                                                                                   I                                                       I          ,
                                                                                                                                                                      ,
                                                                                                                                                                       ,
                                                                                                                                                                        "
                                                                                                                                                                                                                                      I          deepening] of existing channel. May involve
                                                                                                                                                                                                                                                 enhancement or creation of secondary
                                                                                                                                                                                                                                                 channel to provide atternative access ~
                                                                                                                                                                           .
                                                                                                                                                                               ,

                                                                                                                                                                                                                                                 required.
                                                                                                   I                                                       I                   ;,
                                                                                                                                                                                   ,..
                                                                                                                                                                                         ,..~/,.
                                                                                                                                                                                            ,      ’.
                                                                                                                                                                                                   ’   ’.
                                                                                                                                                                                                        "
                                                                                                                                                                                                                                      I    5.    Expected volume: < 20,OOOm3.
                                                                                                                                                                                                   .,
                                                                                                                                                                                                   "
                                                                                                                                                                                                            .


                                                                                                                                                                                                       "




                                                                                                   1                                                       I                   I                                                      I    6.    Temporary navigation aids to be provided by
                                                                                                                                                                                                                                                 the Contractor throughout the works to the
                                                                                                                                                                                                        ’,’).,                                   satisfaction of Regional Harbour Master.
                                                                                                                                                                                                            \."~.-:
7081600
                              -   ---
                                             _L   _._---
                                                                                                   1_                                                      L               1                                          ~:~/;,          I    7.    Permanent navigation aids to be installed as
                                                                                                                                                                                                                                                 requires by Regional Harbour Master.

                                                                                                   I                                                       I                   I                                                      I    8.    Refer to addrtional drawings
                                                                                                                                                                                                                                                    Dredge Area                NRS.{)09.



                                                                                                   I                                                                           I                                                      I
                                                                                                   I                                                                           I                                                      I
                                                                                                                                                                                                                                           LEGEND

                                                                                                   I                                                                           I                                                           Dredge Area
7081500
                                             ~                                                                                                                 I---                                                                        RP Boundary

                                                                                                                                                                       -t
                                  --                                          --   --   --




                                                                                                                                                           I




                                                                                                   I


                                                                                                   I
7081400
                                                                         -J                        L                     --+-            -   -   -
                                                                                                                                                           I
                                                                                                                                                           1--         -L
                                                                          I                        I           Lot 114
                                                                                                                                                                               I
                                                                                                           MCH839107

                                                                                                   I                                                                                                                                                                       International
                                                                                                                                                                                                                                                                         Coastal
                                                                                                                                                                                                                                                                          Management
                                                                                                                                                                                                                                                OFACE 50 I G Am\ SYC Maim. Man Bea:I\ 4217, CLD. """’~~
                                                                                                                                                                                                                                                POST PO Box 3:6, MaIn Bee::h LPO,Mar1 Beach ClD.4217, Australia
7081300                                                                                                                                                                                                                                                     tb, t~                     <bl/~14f
                                                                                                                                                                                                                                                ~                                .
                                                                                                          _-   -_.
                                                                                                                                                                                                                                                ~WtlWcoastama.comau

                                                                                                   r                                                                                                                                       PRO.ECT NAME


                                                                                                                                                                                                                                                           NOOSA RIVER SPIT



                                                                                                                                                                                                                                                       DREDGE AREA LAYOUT




          0         0                                                                        0                           0                           0                0                                                         0
          0         0                                                                        0                           0                           0                0                                                         0
          "<t       l{)                                                                      ex>                         O’J                         0                ......                                                    N
          "-        "-                                                                       "-                          "-                          ex>              ex>                                                       ex>
          0         0                                                                        0                           0                           0                0                                                         0
          l{)       l{)                                                                      l{)                         l{)                         l{)              l{)                                                       l{)

Page 23

                                                                                                                                                                                                                                                                                                                                              Final dredge profile to be determined after
                                                                                                                                                                                                                                                                                                                                              Pre-Start survey.


                                                                                                                                                                                                                                                                                                                                              Maximum dredge depth to be RL -3m AHD
                                                                                                                                                                                                                                                                                                                                              to avoid acid sulphate materials.


                                                                                                                                                                                                                                                                                                                                              Balters (1V:3H)may be formed by an
                                                                                                                                                                                                                                                                                                                                              equivalent box cut.

                                                                                                                                                                                                                                                                                                                                              Material is clean sand suitable for beach
                                                                                                                                                                                                                                                                                                                                              nourishment.


                                                                                                                                                                                                                                                                                                                                              Refer additional drawings
                                                                                                                                                                                                                                                                                                                                                Centre line                NRS-008


                                                                                                                                                                                                                                                                                                                                              Dredged material may be used for.
                                                                                                                                                                                                                                                                                                                                                   construction [filling containers]
                                                                                                                                                                                                                                                                                                                                                   backfilling adjacent to structures
                                                                                                                                                                                                                                                                                                                                                        foreshore nourishment.



                                                                                                                       Existing Channel
_________________________________________________________________________________________HM
-----------------------------------------------------------------------------------------MH~
_________________________________________________________________________________________AHD

_   _   _   _
                _NSL   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _   _                              _   _   _   _   _   _
                                                                                                                                                                                                                                                                                                                                  _MLWS
                                                                                                                                                                                                                                                                                                       --------LAT




                                                                                                                                                                                                                                                                           Possible dredge profile

                                                                                                                                                                                                                                                                           [widening & deepening existing channel]                        LEGEND




                                                                                                                                                                                                                                                                                                                                                                        Intemational
                                                                                                                                                                                                                                                                                                                                                                       Coastal
                                                                                                                                                                                                                                                                                                                                                                       Management
                                                                                                                                                                                                                                                                                                                                              OFACE   5lIGAm\SVCManna,__4217.ClI.D.l’ustraia
                                                                                                                                                                                                                                                                                                                                             P     o Bcoc:lb, MalnBe lPO,Main BeOlD. 4211. hSraha
                                                                                                                                                                                                                                                                                                                                             TElEPHONE -<11~             FPIX. ..ijl/~141
                                                                                                                                                                                                                                                                                                                                              WEBSITE     w*wcoastamaregemer1.;;;m.au
                                                                                                                                                                                                                                                                                                                                          PRo..ECf NAME

                                                                                                                                                                                                                                                                                                                                                          NOOSA RIVER SPIT

Page 24

                                                                                                                                                         1.   Estimated volume for foreshore nourishment
                                                                                                                                                              -9,OOOm’.

                                                                                 Q)                       Q)
                                                                                                                                                         2.   All material placed on the foreshore to be
                                                                                E                         E
                                                                                                          c                                                   clean sand suitable for nourishment.
                                                                                c
                                                                                ,!2l                      .!2l
                                                                                ~                         ~                                              3.   Adjacent to groyne, profile to widen such that
                                                                                f--                       CJ)                                                 new HAT  alignment to be in accordance with
                                                                                <l:                       S                                                   drawing NRS.{)05.
                                                                                I                         I
                                                                                ’0                        ~
                                                                                 Q)
                                                                                .r:                       Ol
                                                                                (/)                       .~
                                                                                .;::
                                                                                 ::l                      ii
                                                                                 o                        ’x
                                                                                Z                         w




                                                                                 ,
                                                                                         I                 I



                                                                                 rsm1m;,ll
                                                                                 i     Lowest of           I
                                                                                                                 Reprofile to top of bank as required.


                                                  Design nourished               !     RL 1,06m AHD
                                                                                                           I
                                                                     profile~    i     or   top of bank    I




-=~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~=~~~=~=~~~~~~:~~~~~~~~~~~=:~:~~~~~==~:~~~~~~~~~~~~~~~~~~]:
             NSL[varies]                                 1~’
                                                                                                           ,




                                                                                                                                                                                       International

                                                                                                                                                              ~
                                                                                                                                                              OfFICE
                                                                                                                                                                                      Coastal
                                                                                                                                                                                      Management
                                                                                                                                                                       50/Gh11\ SYC M na, Marl 8each,4217,(lj),"""mi,
                                                                                                                                                              POsf"Po Sox::u" MaIn Be LPO,Mall Bea::ha.O, 4211,Au!lralla
                                                                                                                                                              ’i  PHONE <61 ,_             F    <611’:/:illJ141
                                                                                                                                                              ’HEBSITE YNIW coasamamgemeri C;;au


                                                                                                                                                         PRO.ECT NME

                                                                                                                                                                         NOOSA RIVER SPIT


                                                                                                                                                                             NOURISHMENT
                                                                                                                                                                          TYPICAL PROFILE

Page 25

NOTES


1   .   Design conditions
    1.1.    Tides [OTtide tables, Noosa Head]
                                     AHD           LAT
                HAT              +1.06m           +2.18m
                                                                                                                         Sand-filled Geotextile Containers
                MHWS             +O.62m           +1.74m                                                                 Finished dimensions
                AHD              +O.OOm           +1.12m
                                                                                                                         [Filled above water level]
                MLWS             -O.80m           +O.32m
                LAT              -1.12m           +O.OOm
    1.2.     Flood [Noosa River Flood Study, John Wilson & Partners, 1995]
                50yr ARI          1 .44mAHD                                                                                                                      3.8m
                entrance scour             O.5m
                                                                                                                                                             I          I          NOTES

                                                                                                                           Nominal Diameter = 3.0m

                                                                                                                                                             T1 ~I1.3m
                                                                                                                                                             (
    1.3.     Currents [GCCM numerical model]
                                                                                                                           Volume = 81 m3
                Max spring tide            1 -1.5m/s.
                Velocities expected to vary in response to prevailing channel configurations and location within
                the estuary.
    1.4.     Waves
                Hs                         1 m [nominal]                                                                                                         4m

                Potential wave conditions at the foreshore are expected to vary in

                response to prevailing channel configurations.


2.      Materials   -
                        Geotextile and Sand-filled Geotextile Mega-Containers
                                                                                                                           Nominal Diameter = 3.4m

                                                                                                                           Volume = 103m3                    C T2 ~l5m
    2.1.     Containers to be fabricated using ELCOMax 1209RP geotextile (or equivalent).         Expected lifetime
             25 years.
    2.2.     Container length to be 20m [may be altered if necessary or preferred by contractor].
    2.3.     Containers to have suitably spaced filling ports [MIN 3 preferred] with "screw & glue" closure types.
                                                                                                                                                                 5m
    2.4.     Geotextile underlay to be ELCOMax 600R (or equivalent)
    2.5.     Geotextile flaps, where required, are to be of sufficient size to provide a 30m x 6m flap.   Flaps are to


    2.6.
             be fabricated using ELCOMax 600R (or equivalent). Flaps are to be adequately secured (e.g.
             stiched) to the bottom of the container.
             If flaps cannot be fabricated, may be replaced with separate geotextile fabric with 1 m laps.
                                                                                                                            Nominal Diameter = 4.2m

                                                                                                                            Volume = 183m3                   ( JI20m
                                                                                                                                                                 T3

3.      Filling of Containers
    3.1.     Excavation tolerances                                                                                                                                6m
                Vertical         +/- O.2m
    3.2.     Containers to be filled in accordance with manufacturer’s specifications using either jetpump, dredge


    3.3.
    3.4.
             or suitable alternative.

             Design filled container dimensions as shown.
             Finished container tolerances
                Horizontal       +1- 1.0m from design alignment [containers to be well butted together]
                                                                                                                            Nominal Diameter = 4.6m

                                                                                                                            Volume = 224m3                   ( j}2m
                                                                                                                                                                 T4
                                                                                                                                                                                   LEGEND




                Vertical         +/- O.5m at any single point
                                 +/- O.3m averaged over 10m


4.      Maintenance
    4.1.     Nominated geotextile is more robust than the standard geotextile, however may be subject to                 Sand-filled Geotextile Containers
                                                                                                                         Finished dimensions
             damage from vandalism, vessel impact, anchors etc.                                                                                                   6m
    4.2.     Structures to be inspected periodically and after all major events.                                         [Filled below water level]
    4.3.     Any minor damage is to be repaired as soon as practicable.
    4.4.     Any major damage or deflation and the container is to be replaced.




5.
    4.5.


    4.6.
             If damage is an ongoing concern, consideration may need to be given to armouring the structures
             [e.g. with rock].
             Scour may require topping up with additional containers or placing of rock in scour holes


        Monitoring
                                                                                                                            Nominal Diameter      =   4.6m

                                                                                                                                                             C   T4
                                                                                                                                                                            J}6m                                 International

    5.1.     The natural system is highly variable.                                                                                                              6m
                                                                                                                                                                                                                Coastal
                                                    Monitoring is to be undertaken in accordance with ICM Report
             "Option Review Noosa River Spit" to determine the performance and impacts of the works.
                                 -
                                                                                                                                                                                                                Management
    5.2.     Works may be modified or removed if monitoring indicates that this is necessary.                                                                                         ~5:JIGA-T!\SfCr.mn._Beo:!\4217.OLD.""’rala

    5.3.     Implementation of later stages of the works to be undertaken as required.                                              Flap Detail
                                                                                                                                                                 T4
                                                                                                                                                                             }6m      .EQ2!. PO Box.Jh, MalnBe LPO, Marc Beach 01..0, 421/, Australia
                                                                                                                                                                                      TELEPHONE <b1 f_
                                                                                                                                                                                      ~wwwcoastamaregemer1

                                                                                                                                                                                   PROJECT NAt’




                                                                                                                                                                                   DRAWNG TIlLE
                                                                                                                                                                                                  NOOSA RIVER SPIT



                                                                                                                                                                                                             NOTES
                                                                                                                                                                                                                        F/’O(
                                                                                                                                                                                                                            au
                                                                                                                                                                                                                                <61 f;oJ:14f

Page 26

                                                                                                                                                                                                                    r.~\
                                                                                                                                                                                                                    -N-
                                                                                                                                                                                                                    ~/’


                                                                                   I
                                                                                   I

                                                                                   I
                                                                                                                                        +                                      ~
                                      -
                                           t-
                                                                     --t-                            --+                                      -        -   ----    ---




                                                                                                                                                                                                           Extenlof live marine
                                                                                                                                        I                                      I
                                                                                                                                                                                                           plants below HAT to
                                                                                                                                                                                                           be removed

                                                                                                                                                                                                                                  1.    Vegetation survey by SCRC on 23rd
                                                                                                                                                                                                                                        November 201 O.


                                                                                                                                                                                                                     (approx)     2.    Removal of dead trees to be undertaken in




                                                                                   l
                                                                                                                                                                                                                                        accordance w~h the Construction

                                                                                                           I’                                                                                                                           Management Plan.
                                                                                                                                                            Structure Footprint
                                                                                                                                                                                                                                  3.    Area of dead trees to be removed -7700m’


                                                                                                                                                                                                                                        Area of live marine plants to be removed
                                                                                   t                                                                                                                                                    (clearing track) -275m’.

                                                                                                                                                                                                                                        Area of terrestrial plants to be removed
                                                                                                                                                                                                                                        (clearing track)    -   10m’.
                      +                                      ~--    .......-   -       ~---                l-                           +_.       --




                                                                                                           I                                                                                                                      4.    Track widening to be undertaken in such a
                                                                                                                                                                                                                                        way to minimise the impact and provide
                                                                                                           I                                                                                                                            adequate access for construction equipment.
                                                                                                           1                                               ’\
                                                                                                       ,
                                                                                                           ~
                                                                                                           I
                                                                                                                                                                                                       vegetation to be
                                                                                                                                                                                                                                  5.    Rock wall return
                                                                                                                                                                                                                                        Adjacent mangroves not to be distu rbed.
                                                                                                                                                                                                                                        Minor clearing associated w~h construction
                                                                                                                                                                                                       cleared (separate                of retum involves primarily the removal of
                                                                                                           I
                                                                                                                                                                                                                                        grasses.
                                                                                                                                        -t:   -


                                                                                                                                                                                                       lapprOVal)
                                                                                              ----
                                                                                                           t               ~-~~
                                                                                                                                        ~




                               S!mctu",Foolp""!                    ----
                                                                                                           [    .~




            --1
                                                ~                              ’"’-    "




                                                                                                           t-                                                                      Nourishment




                                r’                                                                                                                              Top of Bank
                                                                                                                                                                                                                                  LEGEND

                                                                                                                                                                                                                                  Dead trees to be removed


                      t                                                                                                                                                                                                           Live marine plants to
                                                                                                                                                                                                                                  be removed (below HAT)
                      t-
                                                                                                                                                                                                                                  Terrestrial plants to
                                                                                                                                                                                                                                  be removed




                  I
             I

                                                                                                           I
                           "                                                                               +



                                                                                                                      Lot 114
            Extent of Dead
                                                                                                                     MCH839107
            to be removed




                                                Q_ Mangroves
                                                \)   Not to be disturbed
                                                                                                                                                                                                                                                                Intemational
                                                                                                                                        I                                                                                                                     Coastal
"




                                                                                                                                                                                                                                                              Management
    ...-,

                      ’"
                                                                                                                                        I                                                                                              OfF1CE   5O/GA"n\SVCManna,Mail_4217.OLD......"’.

                                                                                                                                                                                                                                       ~~~~~:,.I=LPO.~:B:;~~:.
                                                                                                                                                                                                                                       WffiSITE

                                                                                                                                                                                                                                  PRo..ECT NAI
                                                                                                                                                                                                                                                  WWWcoaslaknanagernetiCau
                                                                                                                                                                                                                                                                                     r<Akl




                                                                                                                                                                                                                                                  NOOSA RIVER SPIT




            o                        o                                                               o                            o                                      o                       o
            o                        o                                                               o                            o                                      o                       o
            L()                      (()                                                             CO                           (J)                                    o                       ..-

            I"-                      I"-                                                             I"-                          I"-                                    CO                      CO
            o                        o                                                               o                            o                                      o                       o
            L()                      L()                                                             1.0                          L()                                    L()                     L()

Page 27

                             International
                             Coastal                                 eoo-engineered coastal solutions


                             Management




 CONCEPT ENVIRONMENT MANAGEMENT PLAN
 REV C




NOOSA RIVER SPIT
EROSION PROTECTION WORKS




prepared for



SUNSHINE COAST REGIONAL
COUNCil




by



INTERNATIONAl
COASTAL MANAGEMENT




 International Coastal Management PlY LTO (lCM)                                                  r_l;"               ~"
 ~50 I G Arm, SYC Marina. Main Beach. Old. 421Z Australia

 "’"   PO Box 306. Main Beach LPG. Main Beach. Old. 421Z Australia                            :’"’:":..   ....~ ~-



 m,_      +61755640564 f!! +61755329147
 w{"’"   www.coaslalmanagemen1.com.au
                                                                                                                          ~   ....._


                                                                                   J’   .,.

Page 28

                           International
                           Coastal                                                             eco-engineered coastal solutions


                           Management



Document Control Sheet


Prepared by:                                     Andrew Brown
Title:                                           Coastal Engineer
Company:                                          Intemational Coastal Management


Final Review:                                    Bobbie Corbett
Title:                                           Senior Coastal Engineer
Company:                                          Intemational Coastal Management


Approved for release:                            Bobbie Corbett
Title:                                           Senior Coastal Engineer
Company:                                          Intemational Coastal Management




Version History


Version No.                    Date                  Chan~ed by               Nature of Amendment
Rev A                          5.4.11                Bobbie Corbett           Acid sulphate revised.
                                                                              Marine plants revised
Rev B                          15.4.11               Bobbie Corbett           Report name and minor working revisions
Rev C                          1.5.12                Andrew Brown             Amendments due to design and methodology
                                                                              changes




This document has been produced by Intemational Coastal Management Pty Ltd (ICM)in accordance with the terms and
limitations of the brief by SCRC. In preparing this report, ICM has used information provided by the Client and others
identified herein. ICM does not and shall not assume any responsibility or liability whatsoever to any third party arising out of
any use or reliance by any third party on the content of this document. This document is not to be used without the express
approval of SCRC.




                                                                                                                            ,
                                                                                                                                -....,_

                                                                                                                            "

International Coastal Management PlY LID (leM)                                                                            L-;. ,

~50 /G Arm. SYC Marina. Main Beach. Old. 4217 Australia                                                                ..
                                                                                                                                ::_.-
’!!! PO Box 306. Main Beach LPG. Main Beach. Old. 4217. Australia
                                                                                                                                ’1
m._      +6175564 0564 ~ +61 755329147                                                                                                    ,

                                                                                                                      ~     I.            ’,1
-    WWN.coastalmanagement.com.au
                                                                                                                                                ..

Page 29

                              International
                              Coastal                                                                                        eco-engineered ooastal solutions


                              Management


TABLE OF CONTENTS


1.      SITE LOCATION .......................................................................................................................................................1



2.      INTENT OF CONCEPT CONSTRUCTION MANAGEMENT PLAN..............................................................................2



3.      DESCRIPTION AND PURPOSE OF WORKS.............................................................................................................2



4.      RELEVANT APPROVALS.........................................................................................................................................3



5.      CONSTRUCTION ......................................................................................................................................................4
     5.1        Equipment                                                                                                                                                                      4
     5.2        Methodology for Dredging I Nourishment                                                                                                                                         4
     5.3        Methodology for Filling Containers                                                                                                                                             4
     5.4        Methodology for Constructing Rock Wall                                                                                                                                         4



6.      SUMMARY OF KEY ENVIRONMENTAL ISSUES ......................................................................................................5
     6.1        Water Quality                                                                                                                                                                  5
     6.2        Noise                                                                                                                                                                          5
     6.3        Flora                                                                                                                                                                          5
     6.4        Acid Sulphate                                                                                                                                                                  8
     6.5        Cultural Heritage                                                                                                                                                              9
     6.6        Waste Management                                                                                                                                                               9
     6.7        Air Quality Management                                                                                                                                                         9
     6.8        Social                                                                                                                                                                         9
     6.9        Flammable and Combustible Materials                                                                                                                                            9
     6.10       Greenhouse Gas Emissions                                                                                                                                                       9



7.       ENVIRONMENTAL MANAGEMENT MONITORING REQUIREMENTS.....................................................................l0



8.      CONTINGENCY PLANS & EMERGENCY PROCEDURES.......................................................................................10




                                                                                                                                                                      ,
                                                                                                                                                                     , .....
                                                                                                                                                                          L
                                                                                                                                                                              .r+’J

International Coastal Management PlY LTD (ICM)                                                                                                                     e’
                                                                                                                                                                                          ,
!!fB 50 I G   Arm. SYC Marina. Main Beach. Old. 4217 Australia
!lIE PO Box 306. Main Beach LPO. Main Beach. Old. 4217 Australia                                                                                          ’
                                                                                                                                                              >;~!-, ;1"’...
                                                                                                                                                 III
                                                                                                                                                                                      ~
mE_        +61 75564 0564 ~ +61755329147                                                                                                          :.,..       .(   "’f~.,...                  .~
                                                                                                                                                          .

                                                                                                                                                              4      ~         -1-’            .
WI"’"   W\oWI.coastalmanagemenl.com.au


                                                                                                                                                          ~

Page 30

     1.   SITE LOCATION


The site is located within the Noosa River entrance [Figure 1] adjacent to the Noosa River Spit. The works are located
outside the Noosa River Fish Habitat Area [Figure 2].




There is a tidal range of approx 2m [aTtide tables]. The site is protected from ocean swell and seas by Noosa Spit and
shoals within the entrance. Spring tidal velocities within the southem channel can be up to 1.5m/s, although this may change
with channel configuration. The channels and shoal configuration is highly variable.

Page 31

    2.   INTENT OF CONCEPT CONSTRUCTION MANAGEMENT PLAN


This Concept Construction Management Plan is intended to provide an indication of how works may be undertaken by the
contractor, likely environmental impacts and intended control measures.

The contractor is to prepare a final construction management plan prior to commencing works. The contractors
methodology, plant, equipment, scheduling etc may vary from that indicated here. Any changes to the intended methodology
that may increase the impact of the works is not to be implemented without further discussion with DERM.


    3.   DESCRIPTION AND PURPOSE OF WORKS


With the exception of those areas already protected by rock works, Noosa River Spit is currently experiencing erosion along
its full length, including the southern end of the Noosa River Spit. While this is reducing amenity along what was once a
popular recreational beach, there is also the potential for continued erosion to breach the Noosa River Spit, which could have
very serious impacts.

A number of options were considered [ICM 2010 report). The preferred option includes [Figure 3):
     .
          Submerged curved "closure" [sand-filled geotextile mega-containers) designed to create an enclosed, stable
          beach and lagoon area
     .
          Dredging for interim navigation and associated foreshore nourishment
     .
          Training wall [sand-filled geotextile mega-containers) to provide a control point for the southem channel
     .    Wall [sand-filled geotextile mega-containers) to prevent erosion along southern end of the Noosa River Spit
     .    Two groynes [2.5m3sand-filled geotextile containers) to stabilize the upstream beach




Figure 3: Proposed Strategy




                                                                                                                             2

Page 32

A staged approach of construction is being adopted and this construction plan is relevant only for Stage 1 of the works
[Figure 4). Stage 1 includes:

     .    Retain existing rock wall [maintain / upgrade as required)
     .
          Submerged channel closure [partial)
     .    Wall at end of Noosa River Spit
     .
          Groyne / Training Wall
     .
          Dredging for navigation (location to be detennined)
     .    Foreshore nourishment
     .    Removal of dead trees (marine plants) as required
     .
          Widening of access track

The submerged channel closure and groyne are to be constructed using sand-filled geotextile mega-containers.


The wall has been modified from the original design and is to be constructed of a combination of sand-filled geotextile mega-
containers and rock.




     4.   RELEVANT APPROVALS


The following approvals have been attained:


               o    Resource Entitlement ref: 2010/009024
               o    Development Approval ref: OPW 11/0116
               o    Prescribed tidal works ref: SPCC01881911
               o    Interfering wtth Marine Plants:2011 080083
               o    ERA 16 1(b) ref: SPCE01881811
               o    Registration Certificate ENRE02969911
               o    Clearing (Nature Conservation Act) ref: WICL09310811




                                                                                                                            3

Page 33

     5.    CONSTRUCTION


There are a number of ways in which these works could be achieved and the final methodology is at the discretion of the
contractor.


     5.1   Equipment

It is anticipated that the works (depending on the methodology) may require the use the following major equipment:


     .     6" or greater cutter suction dredger and pipeline
     .     Jet pump (suspended or hopper-fed)
     .
           Barge
     .     Support vessels
     .     Excavator
     .     Bobcat


     5.2 Methodology for Dredging I Nourishment


The dredge area is to be located accurately using DGPS or suitable altemative. Dredging is to be undertaken slowly to
minimise turbidity. Dredging is to be undertaken in such a way that it does not block navigation once a suitable channel is
established.


Nourishment is to be achieved generally by relocating the pipeline periodically within the deposition area. Small earthmoving
equipment may be used to redistribute material on the visible beach to achieve final nourished profiles. This may be more
difficult to achieve given the presence of significant dead tree material on the foreshore. As the slopes are the same as
existing, final profiling below low tide will likely be achieved by tidal velocities.


     5.3 Methodology for Filling Containers


Filling sand-filled geotextile containers can be undertaken in a number of ways. The simplest methodology includes the
following

     1.    Dredge along the structure alignment to achieve the design depth
     2.    Roll out empty container
     3.    Secure in location with anchor blocks
     4.    Fill container using dredge (while excavating for the next container, per step 1)
     5.    Seal trunks


There are a number of potential variations to this generic methodology. These include:


     .     Excavation for containers may source nourishment and container fill may be sourced from the dredging of channel.
     .     Containers may be filled using a jet-pump suspended from a barge-mounted excavator.
     .     Containers may be filled from an onshore stockpile using a hopper-fed jet pump.
     .     Material may be double handled in some cases.
     .     A frame may be used to secure the container instead of anchor blocks.


It is noted that the works will require the use of divers.


Works will be tide and weather dependent.


     5.4 Methodology for Constructing Rock Wall


The general methodology for construction of the rock wall at the end on of the Noosa Spit is as follows:


     .     Rock will be delivered to site by body trucks via Hasting Street and access track direct to Dog Beach.
     .     Transported by suitable truck along nourished beach to the end of the Noosa River Spit.
     .     Rocks will then be placed to achieve approximate profile using tipping barge.
     .     The excavator will be used to ensure proper profile and interlocking of armour rock. Note: no need to clear access
           track for construction; access via backfill along back of structure




                                                                                                                                4

Page 34

      6.   SUMMARY OF KEY ENVIRONMENTAL ISSUES


 The works are adjacent to (but not within) the Noosa River Fish Habitat Area. The areas to be dredged are not within a
 Marine Park.


 The following outlines potential impacts of the works. Works are to be undertaken in such a way that impacts are minimized
 wherever possible. Monitoring to ensure that any impacts are within acceptable levels is detailed below.


      6.1 Water Quality


 The dredge will operate in such a way to minimise turbidity during dredging operations.


 To ensure that water quality [pH,DO, Turbidtty] remains within acceptable limits, visual monitoring of the plume is to be
 undertaken as well as any required water quality testing in accordance with ERA requirements. Visual observations for oil,
 grease, floating scum and litter is to be carried out on a regular basis.


I Change to rock will reduce excavation volume and turbidity   concerns in this   high flow area.

      6.2 Noise


 The works are separated from the businesses and resorts on Hastings St by at least 620m of well-developed vegetation. It is
 not anticipated that works will cause an issue in this area. The dredging, submerged closure and training wall! groyne, the
 plant will be over 400m from the residences of Noosa Sound and separated by 60m of well-vegetated area on Noosa River
 Spit. When undertaking the wall at the end of Noosa River Spit, the works will be within 350m of the residences on Quamby
 Place (Noosa Sound) and noise could potentially be an issue, particularly outside of normal working hours.


 The Contractor shall take all reasonable precautions (e.g. the use of mufflers) and undertake works in such a way as to
 minimize the potential for noise nuisance to residences and businesses and meet the requirements of the ERA conditions.


 Given the nature of the work and the environment, there will be a need to work in conjunction with the tides and so works
 may need to be undertaken outside of normal working hours. There is no restriction on working hours provided that the
 required noise limits are met.

 An aural inspection is to be undertaken daily and if any issues are identified or complaints are made regarding noise levels,
 noise monitoring compared to nominated levels is to be undertaken if works are to continue in this area.


 Change to rock will reduce potential noise impacts due to utilization of smaller plant over a shorter period of time with lower
 likelihood of operating outside standard working hours.




      6.3 Flora


 Due to the mobility of the channels and shoals and the high erosion rate, the area is characterized by a clean sandy seabed
 (Figure 5). There are no seagrass beds present within the footprint of the proposed works.




                                                                                                                                   5

Page 35

  ’~~""
   l
                      ~..
                            -=~~,
                                       -

                                                                           ’_’--

    ’’’’’’It’’’.,.
   t:~.;~~~~~                 -~.      -,
                                                    .:..~   ~   ~



        ._
                      _’.         4ti.;~       ~a~
                                              ,,"_’


                     ’J
                     j-~---            ’.,,~r,~.L’                  ....


                                                                    :..
                                                                            _.~



                 .
                            .~.
                                  _-
                                       ~:~,     .




                                                 ’~.~;~-:




The only mangroves within proximity of the works are at the south-eastern end of the wall at the end of the Noosa River Spit
(Figure 6). The wall terminates adjacent to the mangroves, but works are to be undertaken in such a way that no mangroves
are to be interfered with as part of the works.




Due to the high rate of erosion there are a number of large dead trees along the length of the foreshore (Figure 7). These
are   typically well-established trees. The number of trees is unknown, but they cover an area of approximately 7700m2.
These trees are classified as marine plants as they are within the tidal zone. It will be necessary to remove these trees to
allow for construction.


Where excavation is taking place, the full tree should be removed [although this may need to be done progressively during
excavation] to prevent blockages of the dredge pipeline and ensure that organics are not used to fill the container or sharp
sections remain where they could potentially resuk in damage to the containers. In other areas [i.e. where nourishment is
taking place or within work areas], trees may be trimmed at the required depth [approx O.3m below surface], sufficient to
allow for access without damage to equipment.




                                                                                                                               6

Page 36

    ,-




l   ~~.-


,~~ ~I,-’:,Al-~~::;:~_ _:~~;
C."            _.

 -c-~~-:. L...,r’
    r....~~.--
    "




           -
                  ~".




                  -~-"
                     ’-.--
               ~
         ::;   .......:.~




Figure 7 Dead trees along the length of the foreshore

The amended rock design incorporates a short retum which has been relocated to avoid impact on mangroves which are
now close to the works as a result of erosion and to minimise impact on other existing vegetation. The area of impact is

approximately 10m2 and within this area are grasses and small shrubs (Figure 8).




Figure 8 Grass and small shrubs to be cleared at rock return

There is a reasonable access path to site from the carpark. Part of the works will include slight widening of this track as
required to allow access for construction equipment. Given the low-lying nature of the track, the majortty of the trees will be
classified as marine plants, however a small number adjacent to the carpark are above HAT and are not marine plants.




Figure 9:Existing path to site

Page 37

 Arborists have advised that the following methodology would be most beneficial and is to be followed as much as
 practicable:
      .    Removal of branches >6" diameter and placement within Noosa Spit and Noosa Woods (above HAT)as fauna
           habitat
      .
           Heavy trimming of remaining trees, stockpiling and mulching. Mulch to be utilised for rehabilitation along access
           track and site perimeter.
      .    Removal of remainder of tree litter unsuitable for mulching for disposal at an appropriate location ashore.



 Removal of trees and mulching to be undertaken by separate, experienced contractors prior to commencement of other
 works.


 An offset programme has been developed to compensate for the loss of habitat as a result of the works and this is provided
 as a separate report.




      6.4 Acid Sulphate


 Sediment testing was undertaken on 4th and 5th January 2011 by Coffey Geotechnics. The sediment is fine-medium grained
 sand w~h low (<5%)fines content.


 While the surface sediments are clean sand suitable for nourishment, acid sulphate soils (both AASS and PASS)were
 identified within some of the deeper areas. Below is the table from the Coffey Report.


 The dredging for interim navigation and excavation for the construction of the submerged closure does not disturb acid
 sulphate soils.

 Dredging / excavation for the wall and training wall / groyne at the end of Noosa River Spit does disturb some acid sulphates
 below RL-4.75m AHD for sand-filled geotextile container placement. As such, all material dredged / excavated from below
 RL-4.5m AHD is to be placed below LAT (i.e. used for filling deeper containers or as backfill adjacent to the toe).


I Rock wall construction will not disturb ASS   or PASS materials.




           Component of Works                                  Depth                         Liming Rates (kg/m3),


                                                   Above RL -4.75 metres AHD                             Nil


                   Wall! Groyne                                                                          8
                                                   Below RL -4.75 metres AHD

                     (S1   -

                               S4)
                                                   Below RL -5.5 metres AHD
                                                                                                         50
                                                            around S4


                                                   Above RL -6.45 metres AHD                             Nfl
            Submerged Closure

                     (S5 87)
                           -




                                                   Below RL -6.45 metres AHD                             50



                     Dredging
                                                   Above RL -3.25 metres AHD                             Nil
                    (S8-814)


     Note.’ No disturbance is expected for the Submerged Closure area below RL -6.45 metres AHO or within the

     Dredging area below RL -3.25 metres AHO.




                                                                                                                                 8

Page 38

     6.5 Cultural Heritage


The Noosa River Spit was artificially reclaimed in 1978 and there has been significant dredging within the river over recent
years. There are no identified areas or items of cultural significance within the proposed area of the works, although a
cultural study can be undertaken if required.


If any potentially culturally significant items are found, the contractor will cease works immediately and advise the
Superintendent. The Superintendent will notify the traditional owners to seek their advice before works in that area can
continue.




     6.6 Waste Management


The sandy material from dredging I excavation will be used for filling containers, backfilling and foreshore nourishment within
the vicinity of the works. The sediment type is very consistent across the footprint of the works and is suitable for this
purpose.

Other wastes (rubbish etc) may be temporarily stored on site if adequately contained. The Contractor is responsible for
ensuring that all waste is disposed of at suitable onshore facilities. Every effort is to be made to ensure that litter and other
debris does not enter the waters. Any material or objects dropped onto the bed are to be recovered. Visual monitoring is to
be undertaken.


The seabed is to be checked prior to completion of the works. All waste materials (including anchor blocks and ropes used
during construction) are to be removed and not buried or left on the seabed.

The contractor is to implement an oil spill management plan.


It is not anticipated that any regulated waste will be generated as part of the works.




     6.7 Air Quality Management


Air emissions from plant and equipment are to be monitored visually to ensure air quality is acceptable throughout the works.
Exhaust is to be within the specifications of the equipment and all required maintenance is to be undertaken.




     6.8 Social


Any complaints are to be investigated and responded to in a prompt manner. The Superintendent is to be notified of any
complaints as soon as practicable. A suitable complaint register is to be kept.


     6.9 Flammable and Combustible Materials


A list of all flammable and combustible materials, chemicals or any other potentially hazardous substances is to be noted on
the MSDS register.




     6.10 Greenhouse Gas Emissions


All machinery is to be regularly maintained and operated in accordance with specifications to minimise possible greenhouse

gas emissions.




                                                                                                                                    9

Page 39

     7.   ENVIRONMENTAL MANAGEMENT MONITORING REQUIREMENTS


Monitoring requirements are to be as below, in addition to any ERA Licence requirements.

Issue                    Monitorin~                  FrequencylTimin~        Performance Criteria      Responsi bi lity
Water Quality            Visual Inspection           Daily during dredging   No visible turbidity      Contractor
                                                     hours                   plume from dredging
                                                                             >200m from the
                                                                             dredge site.

                                                                             No visible oil, grease,
                                                                             floating scum or litter
Noise                    Aural inspection of         Weekly during           Noise levels in           Contractor
                         equipment for               dredging                accordance with
                         excessive noise.                                    equipment
                                                                             specification.

                         Investigation of noise      As required in          Complaints responded      Contractor
                         complaints                  response to any noise   to within 24 hours
                                                     complaints
Air Quality               Visual inspection for      Daily during dredging   No excess machinery       Contractor
                         excess     machinery        hours                   exhaust
                         exhaust emissions
Waste Management          Visual inspection of       Daily during dredging   No uncontained litter     Contractor
                          site for floating debris   hours                   waste
                         for barge/dredge



     8.   CONTINGENCY PLANS & EMERGENCY PROCEDURES


Should any non-confirming results be observed or recorded, works are to suspended immediately and the Superintendent is
to be notified. A procedure for non-conformance is prepared for each Project. This procedure incorporates:


                Work Instructions issued
                Non Conformance Report Form
                Reporting Procedure
                Corrective Action


A number of specific detailed contingency plans are to be prepared and include an oil spill management plan and a waste
management plan.




                                                                                                                          10

Page 40

                              International

~                             Coastal
                              Management
                                                                    eco-engineered coastal solutions




JUSTIFICATION OF PROPOSED
PERMIT AMENDMENTS


NOOSA RIVER SPIT
EROSION PROTECTION WORKS




International Coastal Management Pl’I LTO (lCM)                                               -;;:


..,.,   50 I G Arm, SYC Marina. Main Beach. Old. 421Z Australia                                       ..

                                                                                            ":             I"

"!’!! PO Box 306. Main Beach LPG. Main Beach. Old. 421Z Australia                                ’I


m,,,,"’"   +61 75564 0564 ~ +61755329147
"""’"
        \WMI.coastalmanagemenl.com.au

Page 41

                              International

~                             Coastal
                              Management
                                                                      eoo-engineered coaslal solutions




JUSTIFICATION OF PROPOSED
PERMIT AMENDMENTS




NOOSA RIVER SPIT
EROSION PROTECTION WORKS




prepared for



SUNSHINE COAST REGIONAL
COUNCil




by



INTERNATIONAl
COASTAL MANAGEMENT




 International Coastal Management PTY LTO (leM)                                                   _,    ,.




 Of’"   50 I G Arm, SYC Marina. Main Beach. ald. 421 Z Australia
 PO$1   PO Box 306. Main Beach LPG. Main Beach. ald. 4217 Australia                               ~
                                                                                                       ’:~~..-
 mr""",    +61 75564 0564 ~ +61755329147
                                                                                                       .

                                                                                             t"
 .....1   WIM’iI.coastalmanagement.com.au

Page 42

                             International

~                            Coastal
                             Management
                                                                                            eoo-engineered coastal solutions




Document Control Sheet


Prepared by:                                     Andrew Brown
Title:                                           Coastal Engineer
Company:                                         Intemational Coastal Management


Approved for release:                            Bobbie Corbett
Title:                                           Senior Coastal Engineer
Company:                                         Intemational Coastal Management




Version History


Version No.                      Date                ChanQed by              Nature of Amendment




This document has been produced by Intemational Coastal Management Pty Ltd (ICM)in accordance with the terms and
limitations of the brief by Sunshine Coast Regional Council. In preparing this report, ICM has used information provided by
the Client and others identified herein. ICM does not and shall not assume any responsibility or liability whatsoever to any
third party arising out of any use or reliance by any third party on the content of this document. This document is not to be
used without the express approval of Sunshine Coast Regional Council.




International Coastal Management PlY LID (lCM)                                                                                 ,.
!ill! 50/ G Arm. SYC Marina. Main Beach. Old. 421Z Australia

!!!!! PO Box 306. Main Beach LPO. Main Beach. Old. 421Z Australia

"""",",     +61 75564 0564 ~ +61 755329147
                                                                                                                   ~
"’’’’’’’
           W’Mv.coastalmanagement.com.au
                                                                                                                                    I   ...

Page 43

    1.    Project Details

Noosa River Spit is currently experiencing erosion along its full length, including substantial erosion of the southem end of
the Noosa River Spit. Various options were investigations by ICM in the 2010 report "Option Review: Noosa River Spiro A
staged approach was recommended with Stage 1 of the recommended Noosa River Spit Erosion Protection Works including
[Figure 1):

     .    Retain existing rock wall [maintain 1 upgrade as required)
     .
          Submerged channel closure [partial)
     .    Wall at end of Noosa River Spit
     .
          Groyne 1 Training Wall
     .
          Dredging for navigation (location to be determined)
     .    Foreshore nourishment
     .    Removal of dead trees (marine plants) as required
     .
          Widening of access track



      ’. .~ :/. . . . . . l
          I


         ’.L~.
                  ~
                      .,"
                      l ."


                           ,,’
                                 .
                                  "




                      .E


              r




                       ;r’.:.
                        (."




In July 2011, the following approvals were attained for these works:


                       o         Resource Entitlement ref: 20101009024
                       o         Development Approval ref: OPW11/0116
                       o         Prescribed tidal works ref: SPCC01881911
                       o         Interfering with Marine Plants:2011 080083
                       o         ERA 16 1(b) ref: SPCE01881811
                       o         Registration Certificate ENRE02969911
                       o         Clearing (Nature Conservation Act) ref: WICL09310811

Page 44

     2.   Progress of Works

The Noosa River Spit Erosion Protection project commenced in August 2011, immediately after the DEEDI dredging
exclusion period.   Unfortunately, while clearing of the dead trees along the foreshore was essentially completed ready for
works to commence, technical difficulties encountered with dredging resulted in the need to retender the project to an
altemate contractor. Works were restricted by availability of suitable contractors and Hall Contracting did not commence
works on site until late January (primarily due to a last-minute emergency request that the dredger continue works at
Mooloolaba entrance to ensure safe navigation in this location). Despite a contract period of 20 weeks, Halls had anticipated
that the works could be completed prior to the 1 st June (the start of the DEEDI dredging exclusion period).        Unfortunately,
since the works were being undertaken in summer rather than the more desirable winter months, the project has been
delayed by extended periods of heavy rains which have resulted in high turbidity and inadequate visibility for divers to safely
continue works.


Early productivities were lower than anticipated due to timber blockages, operational methodologies adopted by the
contractor and poor weather conditions.     Recent changes to operational methodology has resulted in significant
improvements to productivity.

At this stage, regardless of recent improvements in productivity, progress on the project is such that it is very unlikely that the
works can be completed prior to the DEEDI 1st June deadline.



     3.   Proposed Permit Amendments

Suspending works on 1st June for two months introduces significant extra costs for Sunshine Coast Regional Council in
terms of re-establishment / downtime during this period as well as the loss of state funding if the works are not complete prior
to 30th June. Preliminary indications are that these costs could be of the order of $600,000 to the project. It is also possible
that the dredger may commence other projects during this period, in which case availability to return to the site could be
restricted. As a resu~, altemate scenarios have been considered to mitigate these costs / risks.


Taken into consideration during this process was advice from the contractor regarding the remaining works. Specifically,
while they believe that the wall at the end of Noosa River Spit could potentially be constructed as designed and approved,
they have a few concerns with regards to risk of construction of this portion of the works. Primarily, these concems include:

     .
          Higher volume of timber closer to the bank will likely result in increased number of blockages (and delays).
     .
          Higher currents may result in flatter batter slopes, which increases the risk of undermining of vegetation (including
          mangroves).
     .
          Higher currents introduces greater operational difficulty in laying out and filling containers.

To complete the works, the following scenario is considered to be the best option:


     .    Extend available time for the works
               o   Restrictions for dredging on DEED I permit may be amended so that works can continue without undue
                   impact on fish breeding / spawning.
               o   Extend DERM permits so that works can be completed regardless of future delays.
     .    Amend design to incorporate a section of rock wall at the end of Noosa R Spit (reducing contractor concerns which
          could result in further delays to works and enabling construction to proceed in two locations concurrently,
          enhancing the programme).

The contractor estimates that the works could successfully be completed by the end of June with the incorporation of the
rock component of the works. This incoroporates some float associated with standard matinenance and delays due to minor
blockages, however there is always the possibility of further unforeseen and controllable delays (e.g. a single high-rainfall
event creating a 1-2 week period where works cannot be undertaken, similar to that experienced at the end of February). As
such, allowance should to be made that works may not be complete until late July.




                                                                                                                                  2

Page 45

Preliminary discussions were held with both DERM & DEEDI and the feedback indicated that they were willing to consider
these changes. As such, the following amendments to the permits are requested:


PROPOSED CHANGE 1 : EXTENSION OF TIME


    .    DEED I Operational Works (Interference with Marine Plants / Waterway Barrier) Permit Condition 6 amended from


              "Due to the migration and spawning activities of commercially and recreationally important species of fish
               within the area, dredging works must not be undertaken:

              during the months of June and July; and
                                                                                                                              "

              during the two days prior, the days of, and the two days after the new and full moons in the month ofAugust.
         to read


              "Due to the migration and spawning activities of commercially and recreationally important species of fish
               within the area, dredging works must not be undertaken:
                                                                                                                              "


               during the two days prior, the days of, and the two days after the new and full moons in the month ofAugust.


    .    DERM Operational Works Permit SPCC01881911 Condition A 1 amended from


              "This development permit authorizes the Stage 1 works for a period of 12 months from date of approval that is
              for erosion protection works within Noosa River on USL adjacent to Lot 114 on Plan MCH839107 indicated in
              Table 1. Plans and Documents"


         to read


              "... for a period of 24 months from date of approval..."


    .    DERM ERA 161(b)Permit SPCE01881811 Condition A 1 amended from


                   "This development permit authorizes ERA 16 1(b) dredging for a period of 12 months, from the date of
                   approval..."

         to read

                   "

                    ...
                          for a period of 24 months from date of approval..."



PROPOSED CHANGE 2 :DESIGN AMENDMENT


    .
         Change to all permits to reflect amended design drawings [listed below] that incorporate the proposed rock wall
         component at the end of Noosa R Spit and corresponding revised Concept Environment Management Plan
         [Revision C].

                   NRS-001 rev C                                       NRS-016                  [new drawing]
                   NRS-002 rev C                                       NRS-017                  [new drawing]
                   NRS-003 rev B                                       NRS-008 rev C
                   NRS-004 rev B                                       NRS-009 rev B
                   NRS-015               [new drawing]                 NRS-010 rev C
                   NRS-006 rev B                                       NRS-011 rev B
                   NRS-007 rev B                                       NRS-012 rev C




                                                                                                                              3

Page 46

     PROPOSED CHANGE 1: EXTENSION OF TIME




It is noted that with the present programme, the permits presently would require works to be suspended on 1st June and
recommence restricted operations in August. This is primarily to minimise any potential impacts of the works on fish
migration and spawning within the Noosa River Estuary.

The potential impacts of the works on fish migration and spawning are primarily related to vibration and turbidity. Review of
this impact in the light of the present channel configuration reveals that:


     .    The north channel [within the protected Noosa River Fish Habitat Area) is presently open [Figure 2). This
          effectively provides an alternate, unimpacted fish access to the Noosa River estuary that is some distance from the
          proposed works. As such, the impact of any vibration or turbidity resulting from works undertaken during June and
          July will be substantially reduced given the overall improved accessibility of the estuary to fish.
     .    Closure of the southern channel (by construction of the submerged closure and the training wall / groyne) is
          effectively resulting in retention of the turbid plume within the southern channel [Figure 3) during lower tides. This
          would result in minimal impact of turbidity during any dredging for beach nourishment. During dredging for
          container filling, it is expected that the majority of the sediment is retained within the container and the turbid plume
          would also be reduced.

     .    Volume of dredging required within high current areas at the end of Noosa River Spit is substantially reduced by
          the proposed change to a rock profile and this will substantially reduce expected turbidity within the main channel.
          It is further expected that dredging of these areas will be completed prior to the sensitive June   -

                                                                                                               July period.
     .    Volume of dredging required in deeper areas (with finer material more likely to cause turbidity issues) is
          substantially reduced by the proposed chang to a rock profile and this will substantially redue expected turbidity
          within the main channel. It is further expected that dredging of these areas will be completed prior to the sensitive
          June July period.
                -




Figure 2: North Channel Providese alternate access away from the works

Page 47

The DERM timeframe was primarily to ensure that construction proceeded while the river configuration was similar to that
during the design phases given the dominance of the middle channel and the link of the closure with the existing shoal. The
river configuration remains very similar and there seems to be no obvious sources of concern with extending the timeframe
to allow for completion of the works given the reason for the delay.




                                                                                                                              3

Page 48

    PROPOSED CHANGE 2: DESIGN AMENDMENT



The ICM Report (2010) reviewed the advantages and disadvantages of the two preferred construction materials for the
works [Table 1].


Table 1 Ad vanta       es & d.
                             Isadvanta   es 0f rock & sand fll
                                                          -
                                                            I ed   eotextl1e containers [Extract from ICM     ,
                                                                                                               2010)
               Sand-filled Geotextile Containers                                               Rock
Advantages                                                         Advantages
.    Stable with suitable container sizes                          .    Stable with adequate rock sizes
.    Can be designed to allow for scour                            .    Can be designed to allow for scour
.    Flexible to accommodate additional scour if necessary         .    Flexible to accommodate additional scour if
.
    Easily removed /modified /extended if necessary                     necessary. Easily topped up.
.   Uses local materials [noneed to import materials]              .
                                                                        Easily extended
.   Uses floating plant [noaccess issues]                          .    Robust [nopotential for damage]
.
    User-friendly                                                  .    Voids may create habitat
.   Substrate may provide
.    Cost
Disadvantages                                                      Disadvantages
.    Vulnerable to damage from vandalism /vessel impact            .
                                                                       Import of materials required
     even with robust RPgeotextile. Higher maintenance.            .   If importing by truck, need for clearing and traffic
.
     Replacement cost [25yearlifetime]                                 issues along Hastings St
                                                                   .   Less user-friendly
                                                                   .    Cost
                                                                   .    More difficult to remove




Wtth regards to the preliminary design of the wall component at the end of Noosa River Spit, ICM (2010)concluded that:


         "It was originally preferred to construct [the wall at the end of Noosa River Spit] using rock due to
            concerns   regarding the potential for damage. During stakeholder consultation, it becoame evident that
            there were concerns regarding the use of rock, the difficulty of removal and the visual impact. At this
            stage, the preferred option is the sand-filled mega-container wall, although if maintenance becomes an
            ongoing issues, consideration may be given to rock armouring."

As such, the detailed design and approvals obtained for the works were for a sand-filled mega-container structure [Figure 4
& Figure 5].

Page 49

                                                                                                           r~




                                                                                                           /
Figure 3: Approved Wall and Groyne Layout [Annotated version of NRS-005]

                                                           B.cld’lo Rl .3m AHD IfTWII



                                                                               Arlllpal~ excavated pmhle
          Top of bank
                                                                               {rNly"8f)i
                                                                               _______________________________AAT
                                                                               -------------------------------~m
                                                                               -------------------------------~o

                                                                               ==============================~~S




                                                                 phon.11m geoteJCll~ lube with flap
                                                               lilttqwedl




Figure 4: Approved Wall Typical X-Section [NRS-007]

Further review of the preferred construction materials has revealed the following:
     .    The concems expressed by the contractor [see section 3] potentially reflect some additional disadvantages for use
          of sand-filled geotextile contianers in this location.
     .    Access along the nourished beach eliminates the need for clearing for access to the end of the Noosa River Spit.
     .    Discussion with Hastings St Association has resulted in an acceptable delivery timeframe (with deliveries being
          restricted to 9am   4pm Mon Sat). It is expected that deliveries will be limited to a 2-3 week period.
                              -          -




     .    There is limited usage of the foreshore in this location given the proximity of the main channel so being user-
          friendly is less critical in this location.
     .    The higher cost is offset by potential costs of re-establishment.
          While removal of rock is not as simple as sand-filled containers, it can be achieved in the event that this is required
          [although it is the intent that the works remain to protect Noosa R Spit in the long term).

After further review of the above and discussion with relevant agencies and stakeholders, it is proposed that a section of the
wall which is closest to the bank and exposed to the highest currents be constructed using rock [Figure 6 & Figure 7). A
revised construction methodology is included in the Concept Environment Management Plan [rev C].




                                                                                                                                b

Page 50

                                                                   195 (MAl()


SmtahlP. gt"u\u~r




:~~~~~~~J~"_~=====,=~~==================~========:
                                -




                                                       ~             ~~                                                 ~

                                                    .("~.   ~~%~=- --~:::~~& ~[=========:=::====~====
                            CORI ROCK
                                                                      r         ARMOUR ROCK
                                                                            0"..0.411’(111")   8.~

                       O$
                            -
                                (/ ]!)III (1Il1nl
                                                                                                                  NSL




                                                                                       4.5




Figure 6: Proposed Rock Wall Cross Section


A review of original risk assessment has been undertaken to highlight any changes in the expected impacts associated with
the works.


Uncertainty

The proposed change to rock along a section of the structure will not substantially impact on the level of uncertainty and
monitoring is still required.

Variability in shoreline response

No change to expected variability along Dog Beach.


Channel Evolution I River Processes


The impacts of the proposed structure on river flows and river I shoreline evolution is expected to be equivalent to the
existing approved mega-container profile. While there is higher friction associated with permeable structures, previous
changes to these factors as part of the modelling did not reveal any significant impacts. As such, the increase in wall
permeability is not expected to have a noticeable change on river flows or channel evolution.




                                                                                                                             6

Page 51

Impacts on Shoals

No change expected.


Erosion of Mangroves


While the rock wall is expected to successfully prevent further erosion along its length, natural erosion of the adjacent
mangroves has been substantial to date and while the proposed works may help to stabilise a more shorward alignment of
mangroves in the longer term, ongoing erosion remains expected in the short term regardless of the change to rock and
should not automatically be considered to be a result of the construction of the works without further investigation. As
erosion occurs, a step in the shoreline will develop and works may need to be extended or modified in response to
monitoring. Extension of the works in response to ongoing erosion or modification of the structure will likely be simpler, more
responsive to actual conditions and lower impact with a rock profile than would have been the case with mega-containers.

Flooding

No change expected.


Flushing

No change expected.


Swimmer safety near submerged closure


No change expected.


Navigation

Toe depth is adequate to maintain existing channel depths so that access and navigational safety is not compromised.
Tolerances are such that as-constructed levels will not be higher than -2.7m AHD. As the channel deepens adjacent to the
wall, undermining will result in reforming of the flexible toe and a corresponding lowering of the levels of the toe.

Vandalism I Vessel impact with the structure


Rock is not vulnerable to damage from vandalism or vessel impact.


Structural aspects


Design of the rock wall profile has been undertaken to ensure that the protection provided is equivalent to the level of
protection and impacts provided by the approved mega container profile, including:
     .    Rock sizes to withstand expected 100yr ARI wave and current conditions (2.5m/s current and 0.75m waves).
     .    Flexible toe can withstand deepening of the channel to -6m AHD (with further rock top-up possible if required).
     .    Depth of rock at the crest can withstand some loss of backfill as a result of overtopping during high tides I flood
          events (with further backfill or rock top-up post-flood possible if required).


Visual Impact


As the crest remains level with adjacent top of bank, the visual impact is expected to be minimimsed. The dark colour of the
rock is expected to stand out less than the sandy coloured mega-containers.


Acid Sulphates


The depth of the toe for the rock profile has been limited to a depth of -4.5m AHD with required tolerances giving an absolute
maximum dredge depth of -4.7m AHD. This eliminates the expected disturbance of material which is potentially contains
ASS I PASS along this section of the structure since soil testing only revealed PASS material below -4.75m AHD. There is
also a substantial reduction in the overall volume of disturbance required [Figure 8].

Page 52

            Reduced disturbance of
            material more likely to
             contain ASS I PASS



Figure 7: Excavation Profiles. approved and proposed


Impacts on Marine Flora

There has been significant erosion of the end of Noosa River Spit since original design based on 2009 survey. As such, the
nearest mangroves which could be affected are now in a different location compared to the original design. In response, the
wall has been shortened slightly and the wall retum has been relocated to ensure that these mangroves are not impacted.


The relocation of the wall return will result in minor additional impact on marine vegetation (predominantly grasses and
shrubs) [Figure 9].




Figure 8: Grass and small shrubs to be cleared at rock return


Impacts on Marine Fauna

A rock wall provides a different substrate and more complex habitat (with nooks and crannies for fish to hide in) compared
with sand.filled geotextile containers. As such, the combination of the two materials is expected to enhance I support a
greater diversity of marine life compared to sand.filled geotextile containers alone.

The change to rock will substantially reduce the anticipated programme of works and do not require use of a dredger (with
associated vibration and turbidity). As a result, the change to rock will reduce any potential for impacts on fish migration and
spawning.




                                                                                                                                   8

Used in these records

About this file

File size
40.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Change to Existing Approval - OPW11_0116.01.pdf · 40.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.