Change to Existing Approval - OPW11/0116.01
Very large file (40.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Crest height such that structure is level with
NSL (or as close as practicable). Will be
overtopped on high tides.
Extent of works to be restricted to limits
shown on drawings. Container configuration
to achieve design may vary.
For excavation notes, see drawing NRS-{)06.
4. Optional additional container may be placed
as part of initial works or placed [if required]
Backfill to RL -3m AHD [min] in response to monitoring.
5. Refer to add~ional drawings
Plan layout NRS-{)05
Top of bank Anticipated excavated profile Notes NRS-{)11
[may vary]
NSL [varies]
_______________________________HM
---------- -------------------------------MH~
------------------------------
-AHD
-------------------------------ML~
-------------------------------LM
Geotextile underlayer
~~~~~\;.~~:~..~~
~~.~~~~
Geotextile flap
14.0m
Optional 1 m geotextile tube with flap
[if required]
International
Coastal
Management
~50 IG Arm. SYC Manr MaIn Be h, 4217, OLD, /lJJstraha
f:Qg, poeox:m, ManBe LPO. Man Bea::h OLD, 42t7,Ausaralla
~< ll_ m.t)11~41
~.".".coastam;ngemen:_com_aJ
PRO..ECT NAME
NOOSA RIVER SPIT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 40.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.