Council archive · source document
Change to Existing Approval - OPW11/0116.01
Very large file (40.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Final dredge profile to be determined after
Pre-Start survey.
Maximum dredge depth to be RL -3m AHD
to avoid acid sulphate materials.
Balters (1V:3H)may be formed by an
equivalent box cut.
Material is clean sand suitable for beach
nourishment.
Refer additional drawings
Centre line NRS-008
Dredged material may be used for.
construction [filling containers]
backfilling adjacent to structures
foreshore nourishment.
Existing Channel
_________________________________________________________________________________________HM
-----------------------------------------------------------------------------------------MH~
_________________________________________________________________________________________AHD
_ _ _ _
_NSL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_MLWS
--------LAT
Possible dredge profile
[widening & deepening existing channel] LEGEND
Intemational
Coastal
Management
OFACE 5lIGAm\SVCManna,__4217.ClI.D.l’ustraia
P o Bcoc:lb, MalnBe lPO,Main BeOlD. 4211. hSraha
TElEPHONE -<11~ FPIX. ..ijl/~141
WEBSITE w*wcoastamaregemer1.;;;m.au
PRo..ECf NAME
NOOSA RIVER SPIT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 40.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.