Change to Existing Approval - OPW11/0116.01
Very large file (40.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
NOTES
1 . Design conditions
1.1. Tides [OTtide tables, Noosa Head]
AHD LAT
HAT +1.06m +2.18m
Sand-filled Geotextile Containers
MHWS +O.62m +1.74m Finished dimensions
AHD +O.OOm +1.12m
[Filled above water level]
MLWS -O.80m +O.32m
LAT -1.12m +O.OOm
1.2. Flood [Noosa River Flood Study, John Wilson & Partners, 1995]
50yr ARI 1 .44mAHD 3.8m
entrance scour O.5m
I I NOTES
Nominal Diameter = 3.0m
T1 ~I1.3m
(
1.3. Currents [GCCM numerical model]
Volume = 81 m3
Max spring tide 1 -1.5m/s.
Velocities expected to vary in response to prevailing channel configurations and location within
the estuary.
1.4. Waves
Hs 1 m [nominal] 4m
Potential wave conditions at the foreshore are expected to vary in
response to prevailing channel configurations.
2. Materials -
Geotextile and Sand-filled Geotextile Mega-Containers
Nominal Diameter = 3.4m
Volume = 103m3 C T2 ~l5m
2.1. Containers to be fabricated using ELCOMax 1209RP geotextile (or equivalent). Expected lifetime
25 years.
2.2. Container length to be 20m [may be altered if necessary or preferred by contractor].
2.3. Containers to have suitably spaced filling ports [MIN 3 preferred] with "screw & glue" closure types.
5m
2.4. Geotextile underlay to be ELCOMax 600R (or equivalent)
2.5. Geotextile flaps, where required, are to be of sufficient size to provide a 30m x 6m flap. Flaps are to
2.6.
be fabricated using ELCOMax 600R (or equivalent). Flaps are to be adequately secured (e.g.
stiched) to the bottom of the container.
If flaps cannot be fabricated, may be replaced with separate geotextile fabric with 1 m laps.
Nominal Diameter = 4.2m
Volume = 183m3 ( JI20m
T3
3. Filling of Containers
3.1. Excavation tolerances 6m
Vertical +/- O.2m
3.2. Containers to be filled in accordance with manufacturer’s specifications using either jetpump, dredge
3.3.
3.4.
or suitable alternative.
Design filled container dimensions as shown.
Finished container tolerances
Horizontal +1- 1.0m from design alignment [containers to be well butted together]
Nominal Diameter = 4.6m
Volume = 224m3 ( j}2m
T4
LEGEND
Vertical +/- O.5m at any single point
+/- O.3m averaged over 10m
4. Maintenance
4.1. Nominated geotextile is more robust than the standard geotextile, however may be subject to Sand-filled Geotextile Containers
Finished dimensions
damage from vandalism, vessel impact, anchors etc. 6m
4.2. Structures to be inspected periodically and after all major events. [Filled below water level]
4.3. Any minor damage is to be repaired as soon as practicable.
4.4. Any major damage or deflation and the container is to be replaced.
5.
4.5.
4.6.
If damage is an ongoing concern, consideration may need to be given to armouring the structures
[e.g. with rock].
Scour may require topping up with additional containers or placing of rock in scour holes
Monitoring
Nominal Diameter = 4.6m
C T4
J}6m International
5.1. The natural system is highly variable. 6m
Coastal
Monitoring is to be undertaken in accordance with ICM Report
"Option Review Noosa River Spit" to determine the performance and impacts of the works.
-
Management
5.2. Works may be modified or removed if monitoring indicates that this is necessary. ~5:JIGA-T!\SfCr.mn._Beo:!\4217.OLD.""’rala
5.3. Implementation of later stages of the works to be undertaken as required. Flap Detail
T4
}6m .EQ2!. PO Box.Jh, MalnBe LPO, Marc Beach 01..0, 421/, Australia
TELEPHONE <b1 f_
~wwwcoastamaregemer1
PROJECT NAt’
DRAWNG TIlLE
NOOSA RIVER SPIT
NOTES
F/’O(
au
<61 f;oJ:14f
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 40.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.