Council archive · source document
Change to Existing Approval - OPW11/0116.01
Very large file (40.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
International
~ Coastal
Management
eoo-engineered coaslal solutions
JUSTIFICATION OF PROPOSED
PERMIT AMENDMENTS
NOOSA RIVER SPIT
EROSION PROTECTION WORKS
prepared for
SUNSHINE COAST REGIONAL
COUNCil
by
INTERNATIONAl
COASTAL MANAGEMENT
International Coastal Management PTY LTO (leM) _, ,.
Of’" 50 I G Arm, SYC Marina. Main Beach. ald. 421 Z Australia
PO$1 PO Box 306. Main Beach LPG. Main Beach. ald. 4217 Australia ~
’:~~..-
mr""", +61 75564 0564 ~ +61755329147
.
t"
.....1 WIM’iI.coastalmanagement.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 40.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.