1. Project Details
Noosa River Spit is currently experiencing erosion along its full length, including substantial erosion of the southem end of
the Noosa River Spit. Various options were investigations by ICM in the 2010 report "Option Review: Noosa River Spiro A
staged approach was recommended with Stage 1 of the recommended Noosa River Spit Erosion Protection Works including
[Figure 1):
. Retain existing rock wall [maintain 1 upgrade as required)
.
Submerged channel closure [partial)
. Wall at end of Noosa River Spit
.
Groyne 1 Training Wall
.
Dredging for navigation (location to be determined)
. Foreshore nourishment
. Removal of dead trees (marine plants) as required
.
Widening of access track
’. .~ :/. . . . . . l
I
’.L~.
~
.,"
l ."
,,’
.
"
.E
r
;r’.:.
(."
In July 2011, the following approvals were attained for these works:
o Resource Entitlement ref: 20101009024
o Development Approval ref: OPW11/0116
o Prescribed tidal works ref: SPCC01881911
o Interfering with Marine Plants:2011 080083
o ERA 16 1(b) ref: SPCE01881811
o Registration Certificate ENRE02969911
o Clearing (Nature Conservation Act) ref: WICL09310811
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
Change to Existing Approval - OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 40.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.