2401-38777 SRA - Response with conditions
Attached to the e-mail MCU23/0162 & OPW23/0198 SRA application correspondence.
RA6-N SARA reference: 2401-38777 SRA Council reference: MCU23/0162 & OPW23/0198 Applicant reference: 04865 1 February 2024 Chief Executive Officer Noosa Shire Council PO Box 141 TEWANTIN QLD 4565 [email protected] Attention: Morgan Gaffney Dear Ms Gaffney SARA referral agency response—19 Key Court, Noosa Heads (Referral agency response given under section 56 of the Planning Act 2016) The development application described below was confirmed as properly referred by the State Assessment and Referral Agency (SARA) on 31 January 2024. Response Outcome: Referral agency response – with conditions Date of response: 1 February 2024 Conditions: The conditions in Attachment 1 must be attached to any development approval Advice: Advice to the applicant is in Attachment 2 Reasons: The reasons for the referral agency response are in Attachment 3 Development details Description: Development Permit Material Change of Use – Landing (Residential) Development Permit Operational Works – Prescribed Tidal Works (Pontoon) SARA role: Referral agency SARA trigger: Schedule 10, Part 17, Division 3, Table 2, Item 1 - Operational work that is tidal works or work in a coastal management district in tidal South East Queensland (North) regional office Level 4, Foundation Place, 3 South Sea Islander Way, Maroochydore Page 1 of 6 PO Box 1129, Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
2401-38777 SRA
waters (Planning Regulation 2017)
SARA reference: 2401-38777 SRA
Assessment manager: Noosa Shire Council
Street address: 19 Key Court, Noosa Heads
Real property description: Lot 2 on SP330321
Applicant name: Davrus Pty Ltd
c/- The Jetty Specialist
Applicant contact details: 18 Ron Parkinson Crescent
CORBOULD PARK QLD 4551
[email protected]
Human Rights Act 2019 A consideration of the 23 fundamental human rights protected under
considerations: the Human Rights Act 2019 has been undertaken as part of this
decision. It has been determined that this decision does not limit
human rights
Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment
Rules). Copies of the relevant provisions are in Attachment 4.
A copy of this response has been sent to the applicant for their information.
For further information please contact Lydia Summers, Senior Planning Officer, on 07 5644 3217 or via
email [email protected] who will be pleased to assist.
Yours sincerely
David Hooper
Manager
cc Davrus Pty Ltd c/- The Jetty Specialist, [email protected]
enc Attachment 1 - Referral agency conditions
Attachment 2 - Advice to the applicant
Attachment 3 - Reasons for referral agency response
Attachment 4 - Representations about a referral agency response provisions
Attachment 5 - Documents referenced in conditions
State Assessment and Referral Agency Page 2 of 6
Page 3
2401-38777 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Development Permit for Operational work
10.17.3.2.1—Operational work that is tidal works or work in a coastal management district in tidal
waters—The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads (Maritime Safety Queensland) to be the enforcement
authority for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:
1. The private pontoon must be carried out generally in accordance with At all times
the following plans:
Site Plan & Water Allocation prepared by The Jetty Specialist,
dated 03/10/2023 (signed on 3/12/2023), drawing number TJS-
04865-01 and revision A; and
Layout Plan prepared by The Jetty Specialist, dated 07/11/2023
(signed on 3/12/2023), drawing number TJS-04865-02 and
revision B.
2. (a) The structure must be lit/marked in accordance with the following For the duration of
specification: works and for operation
to be maintained at all
i. section 3 of AS4282-1997 Control of the obtrusive effects times.
of outdoor lighting.
(b) Lighting provided must not obscure, disguise or otherwise
interfere with the safe navigation of other vessels, including the
effectiveness of navigational lighting.
3. The construction, operation and maintenance of the private pontoon, For the duration of
and any ship berthed, moored or attached to the structure, must not: works, and at all times
(a) encroach into, pass over or under a navigation corridor
(b) be located in a high risk maritime zone
(c) impede the safe navigation of other ships or boats
(d) restrict safe access to or from neighbouring structures.
4. Remove and dispose of debris or similar obstruction encountered For the duration of
whilst undertaking the work at an appropriately licensed facility. works
5. All piles and/or structures to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works
State Assessment and Referral Agency Page 3 of 6
Page 4
2401-38777 SRA
Attachment 2—Advice to the applicant
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP), version 3.0. If a word remains
undefined it has its ordinary meaning.
State Assessment and Referral Agency Page 4 of 6
Page 5
2401-38777 SRA Attachment 3—Reasons for referral agency response (Given under section 56(7) of the Planning Act 2016) The reasons for SARA’s decision are: The proposed development has been assessed against and complies with the FastTrack5 qualifying criteria checklist 4: Tidal works – Impacts on maritime safety of the SDAP, with conditions. In particular: The proposed development is for private single vessel pontoon located in a canal. The proposed private single vessel pontoon will not interfere or impact on the navigation corridor. Material used in the assessment of the application: The development application material and submitted plans Planning Act 2016 Planning Regulation 2017 SDAP, version 3.0, as published by SARA Development Assessment Rules SARA DA Mapping system Section 58 of the Human Rights Act 2019 South East Queensland Regional Plan 2017 (Shaping SEQ). Attachment 4—Representations about a referral agency response provisions (page left intentionally blank) State Assessment and Referral Agency Page 5 of 6
Page 6
2401-38777 SRA Attachment 5—Documents referenced in conditions (page left intentionally blank) State Assessment and Referral Agency Page 6 of 6