2401-38777 SRA - Response with conditions

Attached to the e-mail MCU23/0162 & OPW23/0198 SRA application correspondence.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                      2401-38777 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)


 No.    Conditions                                                                     Condition timing
 Development Permit for Operational work
 10.17.3.2.1—Operational work that is tidal works or work in a coastal management district in tidal
 waters—The chief executive administering the Planning Act 2016 nominates the Director-General of
 the Department of Transport and Main Roads (Maritime Safety Queensland) to be the enforcement
 authority for the development to which this development approval relates for the administration and
 enforcement of any matter relating to the following conditions:
 1.     The private pontoon must be carried out generally in accordance with           At all times
        the following plans:
            Site Plan & Water Allocation prepared by The Jetty Specialist,
             dated 03/10/2023 (signed on 3/12/2023), drawing number TJS-
             04865-01 and revision A; and
            Layout Plan prepared by The Jetty Specialist, dated 07/11/2023
             (signed on 3/12/2023), drawing number TJS-04865-02 and
             revision B.
 2.     (a) The structure must be lit/marked in accordance with the following          For the duration of
            specification:                                                             works and for operation
                                                                                       to be maintained at all
               i.   section 3 of AS4282-1997 Control of the obtrusive effects          times.
                    of outdoor lighting.
        (b) Lighting provided must not obscure, disguise or otherwise
            interfere with the safe navigation of other vessels, including the
            effectiveness of navigational lighting.
 3.     The construction, operation and maintenance of the private pontoon,            For the duration of
        and any ship berthed, moored or attached to the structure, must not:           works, and at all times
        (a) encroach into, pass over or under a navigation corridor
        (b) be located in a high risk maritime zone
        (c) impede the safe navigation of other ships or boats
        (d) restrict safe access to or from neighbouring structures.
 4.     Remove and dispose of debris or similar obstruction encountered                For the duration of
        whilst undertaking the work at an appropriately licensed facility.             works
 5.     All piles and/or structures to be demolished, both above and below             Prior to the completion
        the waterline must be completely extracted/removed.                            of the works




State Assessment and Referral Agency                                                                     Page 3 of 6
Log in to download the original file

2401-38777 SRA - Response with conditions.pdf · 253 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.