Original source · versioned page text
2401-38777 SRA - Response with conditions
Attached to the e-mail MCU23/0162 & OPW23/0198 SRA application correspondence.
2401-38777 SRA Attachment 3—Reasons for referral agency response (Given under section 56(7) of the Planning Act 2016) The reasons for SARA’s decision are: The proposed development has been assessed against and complies with the FastTrack5 qualifying criteria checklist 4: Tidal works – Impacts on maritime safety of the SDAP, with conditions. In particular: The proposed development is for private single vessel pontoon located in a canal. The proposed private single vessel pontoon will not interfere or impact on the navigation corridor. Material used in the assessment of the application: The development application material and submitted plans Planning Act 2016 Planning Regulation 2017 SDAP, version 3.0, as published by SARA Development Assessment Rules SARA DA Mapping system Section 58 of the Human Rights Act 2019 South East Queensland Regional Plan 2017 (Shaping SEQ). Attachment 4—Representations about a referral agency response provisions (page left intentionally blank) State Assessment and Referral Agency Page 5 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original