08/1663 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.1663
Sunshine Coast Checklist - Applications Involving Land
Regional Council Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
4. APPLICATION. FORMS. |
1.4 Form PartA
4.1.1. Ensure that the form is fully completed and is a current version. SM
4.1.2 Inthe case of an MCU or Op Works below the. high-water mark, owner’s consent is required.
1.1.2.4 If there are multiple owners, the consent of each owner is required.
4.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.
1.2. .Formi Part B-R Supporting Information .
4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. [4
1.1.2.1. Ensure that each of Forms B-R which are attached are fully completed. |
2.1 Ensure that relevant sections have been che
2.2. Ensure correct parts of Form 4 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works) : [1]
RONMENTALLY RELEVA river
3.1 Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees)
& FORIW2 “REQUEST TOCHANGE APPROVAL” Boa ei aauh
4.1 Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.
If over multiple properties on one or more sites, consent of Body Corporate is required,
6.) PLANS BO Ey Be bh,
@ 5.1. Ensure that generally at least 6 sets of the P jon and Operational
Works) accompany the application. in addition ensure that each set is complete. ye
6.2 Ensure that 4 of the copies of the Plan of Development is in an A3 or A4 format and is .
unbound.
HINFORMATION oS oe
6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration | _
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping -
7.14 Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
« Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational
Work if Jetty or if including Landscaping. :
« tand Development Lot Reconfiguration applications and Operational Work not including Landscaping
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
NSC g:Mlanduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 22 pages
Page 2
‘Department of Main Roads (Concurrence orAdvicey)
« State Controlled Road
Dept Natural Resources & Water
.¢ Acid sulphate soils (Advice) .
e Clearing of native vegetation on freehold land (Concurrence)
Environmental Protection Agency (Concurrence)
« Environmentally Relevant Activity (for non-devolved Council as EPA)
¢ Contaminated land .
: « Environmental Management/Contaminated Land Register
« UXO :
« Land recently used as a ‘notifiable activity’
« — Industrial land changed to sensitive uses (eg school)
e Coastal related development.
¢ Koala habitat :
e Wetlands (Advice only) :
Queensland Transport (Concurrence) . . ® -
° Railway
° Public Passenger Transport
Energex or other responsible entity (Advice)
° Electricity Easements/Substations = = fo
OUM (Concurrence)
e SEQRegionalplan = ee
VARIOUS
* Conservation estate (Advice) . ef
OTHER'STATE AGENCIES + TRIGGERS...
“OWNERS CONSENT Gtateaand)
+ oeag
Department of Natural Resources and Mines
EPA . ee
For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.
4
NSC g:\landuse\administrative processes\application checklist.doc
Page 3
one .
Soe
“et rn +
INTEGRATED PLANNING ACT 1997 not Part A, Version 3.1, 3 March 2008
Compariylorganisation name it applicable) [Pite-it Pty Ltd ta Noosa Jetty Builders
Individual applicant/Contact person {if there is more than one applicant, provide additional applicant details on an attachment to this form)
e Title [mrs | First name Lastname |Reed
Postal address [PO Box 299, Noosaville. QLD 4566, ‘|
_ : Contact telephone number Mobile phone number i
- , . Facsimile number e-mail address
%
‘ 1 Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
. « . . .
., Table - If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), comptete Table A only. Then go to Q2.
OR , . ’
Table B Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each fot in a separate row.)
@ (i) ([] Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF
(ii) [J Street address flot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government.)
1 14 Key Court, Noosa Heads. QLD 4567 178 Sunshine Coast Regione! Councit
2 13 Cooran Court, Noosa Heads QLO 4567 198 Sunshine Coast Regional Counci!
“AND / OR :
TableC Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
-- ey
eeZone
Pat tare
Reference:
| ef the following apply to the premises by contpleting Tables D, E, or F. (Note: in] Trost instances, the premises will not involve any of
eters, however some applications may involve ore of moré of these ‘characteristics - complete only if applicable)
wo os A
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the ‘Premises are 2 adjacent to or associated with a water body, watercourse or aquifer (e. 9 river, creek, lake, canal}
Table F Complete if the premises are in tidal water
Scene or the tidal area: (rapolcabid)
3. Indicate the total aréa of the premises ¢ on which the development is proposed: (Note: The total area may include land both above and below water)
4. — Current use/s of the premises: (e.g. vacant /and, house, townhouses, apartment building, shop, Service station, school, sugar cane farming etc.)
if J
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?
x) No No O Yes - Ensure the type, location and dimensions of each easement are included in plans. s submitted with the application
6. ° Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)
Shared timber jetty
7, Does the poposal include new buildings or operational work (including any services) on the premises?
O No . wre Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
8, Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No -GotoQ9 oO Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on 4 separate row, or on an attachment to this form if applicable.
Table H so
Stoddart Building Services
Pty Limited
2 Ross Owen Dobbrick 13 Cooran Court, Noosa Heads QLD 4567 LIA 19/07/2008
14 Key Court, Noosa Heads. QLD 4567 19/07/2008
3 Maree Anne Dobbrick 13 Cooran Court, Noosa Heads QLD 4567 h, (\ B 19/07/2008
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. if the owner is a company, $127 of the Corporations Act 2007 {Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
Page 5
15-Jul-2008
15-Jul-2008
15-Jul-2008
15-Jul-2008
15-Jul-2008
© [Part E of Form 1 over the counter
Checklist
Habour Master letter
John Norden Plans
Neighbour Consent Letter
over the counter
Queensland Government over the counter
Dobbrick Stoddart shared jetty
over the counter
over the counter
Lyte i CO ’ 2
orab le EOLg. ave (REST Ie f :
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (Tick box if applicabte)
Ci the application seeks a preliminary approval only;
[LJ ‘the apptication is not for building and construction work under the Building and Construction industry (Portable Long Service
Leave) Act 7997, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
r regrowth, thinning vegetation or controlling weeds or pests);
{X] all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(CJ the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1997 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. |s payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
BR) No - Endof Panta
(Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessinent Manager / Private Certifier} (Optional)
a TE sy
Ch Receiving officer's Reference 7
Fee (8) 2g = | Date received | 91514 log name [PY neurone | numbers | 08/1663
Privacy Statement
The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application,
Your persanat details will nat be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
Page 6
g te, * . . ¥ INTEGRATED PLANNING ACT 1997, 7S . Part A, Version 3.1, 3 March 2008 General advice le Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible * for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger may refuse to receive an application that is not property made. le, . The IDAS Assessment Checklist must also be completed for afl development applications, other than those requiring assessment against the we te Building Act 1975 only, ie. those applications requiring the completion of Parts A and B only. Applicant details le 4 — Ifthe applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided “under the IPA. Details of the premises a.” The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other » | _, structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land. i” * Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. instead complete . Tabie A. - : ae f, oo The premises may t be identified in a number of ways ~ S Street address and lot on plan are most common and will apply to most applications. . “Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small : , developrient site ‘distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the "premises the subject of the application, Eastings and northings using GDAQ4 datum is preferred, but longitude and latitude and other ‘'y.’ (Specified) datum such as Zone Reference or GS84 may be provided. fe The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act. StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand. StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 14 (Development on strategic port land) and the Queensiand Transport (Ports) website. ° “Tidal water is defined in the Coastaf Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless provided for under the Local Goverment Act 1993. Unless otherwise provided for by legistation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and _ deciding applications for. prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work). Resource entitlement . e Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State resource. Schedule 10 of the Integrated Planning Regulation 1998 (!PR) prescribes the State resources, including State- owned fand, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Plannin: Regu lation. Section 3.2. 1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence. ° For applications involving the taking of interfering with water under. the Water Act, the development application may be made at the same time a the request for resource entitlement, and the Department of Natura! Resources and Water will accept the application as properly made. le For State-controfled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by “ gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads. " Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark. Owner's consent ° Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport infrastructure Act 1994. je Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the processes of the application or in the event of an appeal about the outcome of the application. le “Owner’ for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent). ° Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises. le Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary ERA.
Page 7
: : Pog, . INTEGRATED PLANNING ACT 1997” * Part A, Version 3.1, 3 March 2008 Portable Long Service Leave (PLSL) Levy, The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland. The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy. " The Building and Consiruction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or reparring buildings, poots, roads, jetties, The PLSL tevy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued. : The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and Construction industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can be completed on the QLéave website at www.qleaye.qid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web: d, au). £
Page 8
‘Adjoinirig’property 3. TNature oh Se H ME oe ‘ (Tick é Applicable, t es appro Sought | [XJ Private use x) (i Jetty, pier or wharf . 0 tty. p (7) Non-private use . ‘1D Private use ij Boat ramp or spillwa’ 0 ti) Por sp nd (J Non-private use e a Private use : OO iii) : Mooring pile. - Lk . cose i te-use (L] Development Permit _* private us 2 . oo i) Deck or boardwalk CPrivate use = [7] Preliminary approval (J Non-private use . mo. (Private use Vv Pontoon . O (J Non-private use , Private use D wi Revetment, sea wall or retaining wall O . (J) Non-private use og (vii) Other (6.9. abutment, basin, bridge, breakwater, dam, = . dock, dockyard, embankment, groyne, pipeline or other a] Private use ‘ underground service etc.) - Provide details below (1 Non-private use Is the application within a cul-de-sac, a bend in a waterway or ‘other location where the > side boundaries of the lot connectéd to the work and neighbouring lots are not at right angles to the waterway? CJ No Xl Yes - Submit, with the application, photos of any constructed neighbouring structures, or information about approved but unconstructed . ~ neighbouring structures. ls the ‘application supported by evidence that the proposed work will not prejudice the access rights of adjoining property owners? CNo ye LX] Yes - Complete Q3(a} 3(a) What is the nature of the evidence? (] Letters of support from adjoining property owner - Submit, with the application, the letters of support. (_] Plans illustrating a water allocation area - Submit, with the application, the plans illustrating the water allocation area. a ‘ ' , 7
Page 9
t Has a Registered Professional Engineer of { Queensland 1 RPEQ) oF or interstate equivalent certified that the works comply wi with the design
and safety provisions of the State !DAS code for Prescribed Tidal Works contained in the Coastal Protection and Management
Regulation 2003?
KK] No
(1 Yes - Provide details below
5. Confirm the following mandatory information accompanies this application.
Pl gcume aa ae Ea ‘ae
{i) The location and dimensions of the proposed tidal work in relation to the lot/s abutting the Proposed Confirmed
work and the tidal land on which the work is proposed to be located Xs .
(ii) All other structures on the waterfront and within 20 metres of the’ proposed works oO Confirmed
(iii) The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and oO Confirmed
Mean High Water Springs (MHWS)
(iv) The stope angles of the beds'and banks of the tidal area [_] Confirmed
(v) Details of the proposed work in accordance with the: IDAS code for prescribed tidal work in the a
Coastal Protection’ and Management Regulation 2003: schedule 4A (0.9. physical appearance, lighting, |X] Confirmed . .”
signage, earthworks, public access, infrastructure, structural components, engineering design standards) oa Te
(vi) The finished levels of the proposed works: * . a [_] Confirmed
[_] Confirmed
(vii) Details of the largest vessel, if any, to be moored at the structure
[_J Not applicable
(vii) Evidence that the proposed work will not prejudice the access rights of adjoining property DX} Confirmed
owners (CJ Not applicable
OFFICE USE ONLY = LO ot
Date Received Reference Numbers [oo 7 EPA cost code | 433061
Advice for completing Part P
« Fo
°
.
.
General advice
« — Part A must also be completed for all IDAS development applications.
« . The applicant is responsible for answering afl questions fully and correctly, unless following a response there is a statement to go directly to another
question.
« When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) use the process from the information sheet Electronically
paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transfer (EFT) payment notification to the application.
r further information about completing this form go to:
DAS Guide 24 (Prescribed tidal work)
Ecoaccess website
. deli i
Qi
A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.
Q4
A Registered Professional Engineer of Queensland (RPEQ), or the interstate equivalent, may certify that the proposed work complies with the
design and safety provisions of the IDAS code for prescribed tidal work in the Coasta/ Protection and Management Regulation 2003, schedule
4A. The provision of the certification may reduce the applicable fee for assessment of the work by the locat government.
bw
+e
Page 10
INTEGRATED PLANNING ACT 1997 Part E, Version 3.4, 3 March 2008
Building &/or operational works asses
against a planning scheme
ak
1. Nature of work that requires assessment against a planning scheme:
(1 Building work - Complete Table A (K] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
eS CD Roadworks (2 Stormwater [[] Water infrastructure (] Sewerage infrastructure
[7] Landscaping LD Earthworks (J Drainage Works (J Signage
L] Clearing vegetation under the planning scheme Other - Specify below
Timber Jetty
(ii), What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[X] Development Permit (J Preliminary approval [1] Both (Specify below)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision{?
[XI No = [[] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
No = ([] Yes - Complete Table Ba)
@ 2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 15200
3, Confirm that the following mandatory information accompanies this application
Plans, andspecifications if applicable, showing the nature and location of the proposed works (inctuding the
extent of any cut and fil
BX] Confirmed — | over the counter
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
le Part A must also be completed for alt IDAS development applications.
je The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question
as rary : Te TT 7 vs =
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008. ing.a assessment aga sth Building Act 1975 only pplicwiate Sop thio “Fe Answering the following questions will assist you in determining which sections of the checklist must be completed for your application If unsure, phone or visit your local government or log onto the DIP website www.dip.ald.gov.au for help For all (DAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this checklist Does the application seek approval to materially change use of the premises? Yes |pNo ifyes - complete Section 2 of this checklist Does the application seek approval to reconfigure a lot? Ces |p2No if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government. Does the application seek approval to carry out operational work? if yes - complete Section 4 of this checklist Yes |CINo Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? . . ; CYes |) No if yes - complete Section 5 of this checklist e Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application? ifyes - complete Section 6 of this checklist. Yes |TNo Does the application seek approval to carry out building work requiring assessment against a local government planning scheme? Yes |CNo if yes - complete Part E of (DAS Application Form 1. Assessment is by the focal government. Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. DYes |KINo Assessment is by a building certifier 1.1A Is any part of the proposal intended tobe cartied out o ona Queensland Heritage place under the Queensland Heritage Act 19927 [X] No-cotor.78 =] Yes IPA, schedule 8, part 1, tabla 5, item 2; 1P Regulation, schedule 2, table 1, tem 11, table 2, lew 18: PA, section 1.3.5 (Defimuons for terms used m development),
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
1.1B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a Local Heritage Register under Part 11 of the Queensland Heritage Act 1992?
No - Go to. Q1.2 O Yes - (Complete Form 1, Part C2} This application requires assessment by the relevant local government against the IDAS
Code in the Queensland Heritage Regulation 2003. if the development involves building work and the focal
govemment is not the Assessment Manager for the application, the focal government has jurisdiction as Concurrence
Agency.
IPA, schecite 8, patt 1 table §, Hen 2A, schedule 9, ables 1, 2 3,44 5; IP Reguiation, schedule Z, table 1, tem 11: IPA, section 1.3.5 (Definitions for terms used in developmen);
Queensland Heritage Regulation 2003, schedule 2 (IDAS Code).
1.2 Does the proposal involve removing quarry material from a Watercourse or lake as defined under the Water Act 2000?
IX] No -Gotoar.3 (_] Yes
IPA, schedule 8, part 1, table 5, tem 1; 1P Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000,
section 966C; Wild Rivers Act 2605, section 43A
DI No-Gotoai4 (_] Yes
IPA, schedule 8, part 1, table Z, tem 1; IPA, schedule 8, part 1, able § tems 3 and 4; 1P Regulation, schedule 2, table 2, ems 1 and 23; Environmental Protection Act 1004, section
73AA {wild river area), Witd Rivers Act 2005, section 4A; relevant wild tiver declaration; Wild Rivers Cade,
Sok hil Bata Ble a eS istiss beth ks
14 Is'any part of the premises within the limits of a port under the-Transport Infrastructure Act 1994?
KX] No -Gotoars ‘
1] Yes
{P Regulation, schedule 2, table 2, items 15 and 16
1.5. Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 19947
EX] No - Go to.07.6 ' . :
(1 Yes - iranswers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the
Assessmem Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, item 26 .
R neh
i te iat dis ae ‘s oo
1.6 ls any part of the premises designated for community infrastructure?
Bd No - Goto.a.7 © ,
CI Yes
IP Regulation, schedule 2, table 3, tem 7
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[XI No - End of Section? [_]} Yes
JP Regulation, schedule 2, table 3, item 5
Meee ma a : ee
41 |s any of the proposed operational work assessable under a planning scheme?
( No- Goto. 04.2 LX] Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
XJ No
LO Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
KK] No -Gowast2
i} Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 3, 1P Regulation, schedule 2. table 3, item t(b)
rs or
412 Is any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
{KI No -Gotas13 C1 Yes
41 purukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Dougias, ,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vafe, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
JP Regulation, schedule 2, table 3, item 4; State Planning Policy 2/02: Planning and Managing Development involving Acid Sutfate Soils. section 3.6
SUBSTATIONS: Le
eal pete Austen
4.1.3 |s any of the proposed operational work for filling or excavation?
1 No -Got0a4.14
C1] Yes
IP Regulation; schedule 2, table 3 item 10(a): 1P Regulation, schedule 2, table 3, iter: 10(b}
4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
[X] No -Gota415 (] Yes
IP Regulation, schedule 2, table 3, tem 17
a
4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold? . no
BX] No- Goto 04.1.6 LO Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Reguiation, schedule 2, table 3, item 14
2 ah
4.1.6 Is any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
[BX] No- Gotoa4.1.7 ([] Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation. schedule 2. table 3, item 15
EON
447 Is any part of the premises in a koala conservation area or koala sustainability area?
[X] No -Gotoaa2 [[] Yes
IP Regulation, schedule 2, table 3, tem 19
Page 14
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 9 May 2008.
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
[XJ No -Gotoas3 [_] Yes
IPA, schedule 8. part 1, lable 4, item 2; iP Regulation, schedule 1, part 2, table 5, item I{c)
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area}
43 ls any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
IX] No -cotoas4 (_] Yes
IPA, schedule 8, part 1, table 4, tems 1A-1G; IP Regulation, schedule 2, table 2, item 5 (vegetation clearing): IP Regulation, schedule 2, table 2, tem 34 (koala
conservation); IP Regulation, schedule 1, part 3, table 4, item (vegetation clearingAwild river area}. Vegetation Management Act 1999, section 22A (vegetation
clearing iver area): Wild Rivers Act 2005, sections 31F and 43A
44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20{2), (3) or (5), or from a dam constructed on a watercourse or lake?
DX] No -Gotoa4s (_] Yes - Answer (a} and (b) below
IPA, schedtite 8, part 1, table 4, items 3(a); IP Regulation, schedule 2, table 2, tem 3; IP Regulation, schedule 1, part 3, tale 4, items 3 and 3A; Water Act 2000, section 956A (wild river
area); Wild Rivers Act 2005, section 43A; relevant wild river declaration: Wild Rivers Code
45 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using 4 water tuck to pump water}?
Xd No Goto 04.6 O Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
‘ (NRW). If NRW is not the Assessment Manager for the application, ihe agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(h); IP Regulation, schedule 2, table 2, item 8; 1P Regulation, schedule 1, part 3, table 4, tem 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 Is any of the proposed operational work-for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using-a water truck to pump water)?
(X] No - Goto 4 7 | (1) Yes - Answer (a) ahd (b) below
JPA, schedute 8, part , table 4 em 3(c)(); IP Regulation, schedule 2, table 2, item 8 IP Regulation, schedule 1, part 3, table'4, item 3; Water Act 20100, section 966A (vald river area):
Wild Rivers Act 2005, section 43A; relevant wild tiver declaration, Wild Rivers Corde,
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[X] No -Gotoass [_] Yes
IPA, schedule 8, part 1, table 4, item 3(c){ii); IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A {wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable}
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
No -Gotoa4.9 [[] Yes - Answer both (a) and (b) below
IPA, schadule 8, part 1, table 4, tems 3¢c}t) and 3{d); IP Regulation, schedule 2, table 2. item 9; iP Regutation, schedule 7, part 3, table 4, item 3A; Water Act 2000, section 9668 (wild
fiver area); relevant vald river declaration; Wild Rivers Code.
49 ts the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [J] No DD Yes
(ii) To increase the storage capacity of a referable dam by more than 10% & No OO Yes
If yes to either or both (i) or (li) above - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule &, patt 1, table 4, item 4, IP Regulation, schedule 2, table 2, item 10
4.10 is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
([] No -Gotoa4.17 Yes - Answer (a) and (b) below
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
(a) Is any of the proposed tidal work prescribed tidal work?
—X] Yes [] No
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?
No [] Yes
If no, is the work proposed in a canal?
[INo (Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
1X] No- (Complete Form 1, Part P). This application must be referred to QueenslandTransport (Maritime
Safety Qld) as Concurrence Agency.
oO Yes - (Complete Form 1, Part P). This application must be referred to Queenstand Transport (Maritime
Safety Qid) as Concurrence Agency, and Qld Fire and Rescue Service as Advice Agency.
{o) Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
(i) One only local government tidal area ( No i] Yes
(ii) Starting in one jocal government tidal area and extending into another loca! No C] Yes
government tidal area (but in no strategic port tidal area)
e@ (ii) In two or more local government tidal areas but not starting in either local Co No CO Yes
government tidal area
(iv) One only strategic port tidal area ‘ (J No (1 Yes
(v) A fal area that is not a strategic port tidal area or a local government tidal CO Neo Cl Yes
Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12, 14 and 17; 1P Regulation, scheckite 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)
MENT DISTRICT: WIKD. RIVE
411 ls any of the operational work proposed to be carried out within a coastal management district?
. BR No -Gotoas72 (] Yes
IPA, schedule 8, part 1, table 4, item 5; iP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation, schedule 1, part 3, table 4, tems 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A (wilt river area); Wild Rivers Act 2005, section 434
ett i eae t ra
Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
BX No -Gotoas73 ([] Yes
JPA, schedule 8, putt 1, table 4, itom 6; (PA, schedule 8, part 2, table 4, item 2: Fisheries Regufation 1995 511A (self-assassable codes); 1P Requiation, schedule 2, table 2, tem 28; 1P
Requiation, schedule 1, part 3, table 4, tem 6; Fisherios Act 1984, section 76D (vald river area): Wild Rivers Act 2005, section 43A,
4.13 1s any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
DX] No - Goto 04.14
Yes
IPA, schedule 9, part 1, table 4, tem 7: IPA, schedule 8, part 2, table 4, item 3; Fisheries Regutation 1095 $ 113A (selt-assessable codes): IP Regulation schedule 2, table 2, item 25, 1P
Regulation, schedule 1, part 3, table 4, item 7; Wad Rivers Act 2005, sections 434; Fisheries Act, section 760C (wild river area).
i ti ié
414 1s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
[EX] No -cotoas75 ((] Yes
IPA, schedule 8, past 1, table 4, tent 9: IPA, Schedule 8, pait 2, (able 4, tant 4; Fisheries Requiatinn 1095 sT13A (sell-assessable codes), IP Regulation, schedule 2, table 2, nem 29: 11?
Regulation. schedute 1, part 3, table 4, lem 8; Fisheries Act 1994, section 76DB (aki tiver area): Wit Rivers Act 2005, section 43A: relevant vill! river dectaration: Wild Rivers Code,
Bea SUE R OD Ce Roe ee ah et ae Ee oi rau: zs eee? es $y e
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
DX] No -Gotoas.16 [_] Yes
IPA, schedule 8, part 1, table 4, item 10; IP Regulation, schedule 2, table 2, item 37; Wild Rivers Act 2005, sections 42, 43A
Page 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktist, Version 21.3, 9 May 2008
4.16 ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-contralted road?
No -Endofsection 4 (_} Yes
IP Reguiation, schedule 2, table 2, item 3
have you satisti
tea thee
if yes for any of the referral matters listed in the table above - A referral for this matter fs not required, and the relevant Part identified in the IDAS Assessment
. Checklist is not required to be completed. A capy of the referral agency response and evidence
of how you have satisfied any conditions stated in the response must be attached to your
application.
If no for any of the referral matters listed in the table above - The relevant Part identified in the IDAS Assessment Checklist is required to be completed. The
e@ application must be referred to the relevant referral agency, unless the referral agency is the
Assessment Manager.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, itis provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.
Page 17
a
¥
- Tidal Works — Request for comments—— =~ ==: »
Xe Queensland
s Government
16 June 2008 "Maritime Safety
Queensland
Noosa Jetty Builders
PO Box 299
Noosaville Qld 4566
Queensland Transport
Dear Sir
Jetty — Dobbrick Stoddart, 198 Cooran Court & 178 Key Court, Noosa Heads .
Thank you for your letter of 25 February 2008 about your proposal to construct a jetty at the location
mentioned above.
As aconcurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.
1. The contractor must build the jetty according to Noosa Jetty Builders, John Norden and
Associates, Drawing No 07/245-01A, attached to your letter dated 25 February 2008.
2. No part of the structure or any ship berthed at this sthicture is to come closer than 1.5metres from
_ the side boundaries of the allocated water r space, as shown on the submitted water allocation plat
* 07/245-1A.
3. In the absence of a designated quayline, the structure and any part thereof must not extend beyond
that of neighbouring approved structures. .
_4., The jetty and all freestanding piles must be lit and clearly visible to approaching.vessels.The a
contractor must position all lighting so it does not cause a risk to the safe navigation of other
vessels.
5. Most of the proposed structure lies in the water allocation of both properties (Lot 198 & Lot 178)
The end of the jetty lies on the prolongated side boundary of lot 198. Any ship moored at this
jetty can only be moored as depicted on plan 07/245-1A.
6. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted.
Maritime Safety Queensland Our ref 710/01585(2) P37965 £26797 F34
Marine Operations (Brisbane) : Your ref
MacArthur Avenue East : Enquiries Geoff Smith
Pinkenba Queensiand 4008 Telephone +61 7 3860 3538
. . Facsimile +61 7 3860 3571
ABN 13 200 330 520 Website = www.msq.qid.gov.au
: Email [email protected]
Page 18
é. 4, STB 7. The ship moored at this pontoon must follow the most direct course from this structure to open waters and a similar direct course when returning to this pontoon. 8. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel clearance at all stages of tide. The ship must comply with any local restrictions Placed on channel depths and draft restrictions. 9. Any ships and equipment you or your agent use must comply with the Transport Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the Transport Operations (Marine Pollution) Act 1995. 10. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act 1994 and the Transport Operations (Marine Safety) Regulation 2004. 11.-Any ship mooréd at this jetty must not impede the ‘sate tan navigation of ¢ other ships or re of restrict safe | access to or from neighbouring structures. 12. Any ship moored or dry berthed at this structure must not exceed the following sizes: Wet Berth "Dry Berth Length Overall—5.0 metres- N/A Beam - 2.0 metres 13. The contractor must construct the jetty within two years from the date of approval. If construction is not completed, you will need additional or amended comments from the Regional Harbour Master. Maritime Safety Queensland does not need to be further consulted if all of the above conditions are * met. The above conditions must be included in your application to the assessment manager. This agency will also forward a copy of this letter to the Assessment Manager. fae ate em ew ge ae tater Yours sincerely Captain Richard C sons Regional Harbour Master (Brisbane) Maritime Safety Queensland Page 2 of 2
Page 19
NA Tuesday, 15 July 2008 To Whom It May Concern, |, Wer bar? Evarle of 4 Kid Couk7 Noerca Sourds Have rio objection to the jetty proposed by my neighbours which will encroach. on the prolongation of my boundary line provided it is built in accordance with the John Norden Plans O71 /24U5~| _ shown to.me at the time of signing this letter. Se . Se Yours Sincerely,
Page 20
17/12/2087 ' «12:32 , . . “- (NOTA
CURRENT TITLE SEARCH
NATURAL RESOURCES AND WATER, QUSENSLAND
Request No: 2793862
Search Date: 17/12/2007 11:16" : Title Reference: 16896096
Date Created: 08/05/1986
Previous Title: 15863011
15875183
REGISTERED OWNER
Dealing No: 700861190 18/09/1995 -
ROSS OWEN DOBBRICK
MAREE ANNE DOBBRICK JOINT TENANTS
ESTATE AND LAND
Estate in Fee Simple
LOT 198 REGISTERED PLAN 206744
. County: of MARCH. _. _ Parish of" WEYBA,
Local Government: NOOSA SHIRE
EASEMENTS, ENCUMBRANCES AND INTERESTS
1. Rights and interests reserved to the Crown by
Deed of Grant No. 145863011 (ALLOT 199 SEC 23)
Deed of Grant No. 15875183" (ALLOT 198 SEC 23)
2. MORTGAGE No 702536634 03/03/1998 at 09:40
AUSTRALIA ‘AND NEW ZBALAND BANKING GROUP LIMITED A. c. N. 005
: 387 522°
aburitrsTRATEVE ‘ADVICES -. NIL
UNREGISTERED DEALINGS - NIL
CERTIFICATE OF TITLE ISSUED - No
Caution - Charges do not necessarily appear in oxder of priority
** End of Current Title Search **
COPYRIGHT THE STATE OF QUEENSLAND (NATURAL RESOURCES AND WATER) {2007}
Requested By: SMIS .
Page 1/1
paa2
Page 21
"4971272667 “11:12 7 - . / NU. 445 te ‘CURRENT TITLE SEARCH NATURAL RESOURCES AND WATER, QUEENSLAND Request No: 2793502 Search Date: 17/12/2007 11:04 Title Reference: 15845089 : Date Created: 31/01/1979 REGISTSRED OXNER Dealing No: 711060450 04/10/2007 STODDART BUILDING SERVICES PTY LIMITED A.C.N. 010 272 072 TRUSTEE UNDER INSTRUMENT 711060450 RSTATE AND LAND Eetate in Fee Simple O. LOT 178 CROWN PLAN N21858 * County of MARCH Parish of WEYBA Lecal Government: NOOSA SHIRE. EASEMENTS, ENCUMBRANCRS'-AND INTERESTS 1. Rights and interests reserved to the Crown by Deed of Grant No. 15845089 (ALLOT 178 SEC 23) ADMINISTRATIVE ADVICES - NIL UNREGISTERED DEALINGS ‘- NIL CERTIFICATE OF TITLE ISSUED - No 3 Es Ye on, . vy - ote End. of carrent Title Search ** ws . : . COPYRIGHT ers STATE OF QUEENSLAND (NATURAL RESOURCES AND WATER) (2007) “Requested By: SMIS . Page 1/1
Page 22
Sunshine Coast ‘AND USE SECTION FEES Regional Council “ RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation : - 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation ~ , : 111 APPLICATION FEES Material Change of Use - Code/Impact ; ' Consistent : . 521 Inconsistent : 521 Assessment under Superseded Planning Scheme . . 521 Modification toa Development Permit ~ - _ $24 Extension of a Currency Period. ; §21 Operational Works - Landscaping : : §21 @ Bldg Work assessable against the Planning Scheme. . : 521 PRE LODGEMENT REVIEW Half Hour uo , - 522 . One Hour ce / 522° ADVERTISING Purchase Advertised Applications . . §23 \ JETTIES . / : Jetty Application Fee -. ~ ‘ UdAs 524 Jetty Bond | : , Yoo... 51 : : - : : (Cateyory 4) BONDS . ' Performance Bond : 51 mo : (Category 9) . SIGNS . : Registration Fee . ‘ . 222 oles FEE a a Search of Land Use Section file. . 112 : Liquor Licensing Request mo , _- : 113 : ‘ ; _ TOTAL § C&90 | NAME: fh, lop Resmnee K _ ADDRESS: Io Kew Carine te NB HEAB § Agra] -FILENO: - O87 14663 “DATE: 23/9 [of — 1 : RECEIPT NO: ZLULE7 oR —_ Signature of TP’ P Officer: Fe a + t cro "AUTHORITY NO: . yo, . b4( woe | 1663/;
Page 23
&
>
O &
©
REAL PROPERTY
DESCRIPTION
6 RP 206744
PARISH WEYBA
ALL LEVELS AND TIDE HEIGHTS COUNTY MARCH
RELATIVE TO A.H.D. ° KEY COURT |
750m2
R {
EM REAL PROPERTY
_t PARISH WEYBA
| | | | | LOT 199 COUNTY MARCH
provenry 8 893m2 |
° . BOUNDARY
tay |
{ Bx 125 F146 AD FOED ° ‘
To with
So"
= i eg |
OT 177
le
Pa tg
2200 MOE TREATED ; . 85 : rn ae |
—1
T
i >
3
2 1. UNLESS NOTED OTHERWISE ALL TIMBER SHALLBE ga, 4 ty
x. DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE Lava aan ‘os
j _ A STRESS GRADE OF F14.MiN. Ca 2m
8
e . ¥ A Hy,
1764 - —t+—— STANDARDS FOR TIDAL WORKS." ~~ i
e 3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE —
LTO T/A ve
LE:
F
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
LOT 198
COORAN COURT &
LOT 178 KEY COURT
NOOSA HEADS
Used in these records
08/1663 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.