08/1663 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.1663

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part E, Version 3.4, 3 March 2008

Building &/or operational works asses
against a planning scheme

 

ak

1. Nature of work that requires assessment against a planning scheme:

 

 

(1 Building work - Complete Table A (K] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
eS CD Roadworks (2 Stormwater [[] Water infrastructure (] Sewerage infrastructure
[7] Landscaping LD Earthworks (J Drainage Works (J Signage
L] Clearing vegetation under the planning scheme Other - Specify below
Timber Jetty

 

 

 

(ii), What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit (J Preliminary approval [1] Both (Specify below)

(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision{?
[XI No = [[] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

No = ([] Yes - Complete Table Ba)

 

 

 

 

@ 2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 15200

 

 

 
   

 

3, Confirm that the following mandatory information accompanies this application

 

 

 

Plans, andspecifications if applicable, showing the nature and location of the proposed works (inctuding the
extent of any cut and fil

 

 

 

BX] Confirmed — | over the counter

 

 

 

OFFICE USE ONLY

 

 

Date Received Reference Numbers

 

 

 

 

Advice for completing Part E

General advice
le Part A must also be completed for alt IDAS development applications.
je The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question

 

 

 

 

as rary : Te TT 7 vs =

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1663 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Jetty) [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.