Council archive · source document
08/1663 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.1663
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 9 May 2008.
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
[XJ No -Gotoas3 [_] Yes
IPA, schedule 8. part 1, lable 4, item 2; iP Regulation, schedule 1, part 2, table 5, item I{c)
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area}
43 ls any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
IX] No -cotoas4 (_] Yes
IPA, schedule 8, part 1, table 4, tems 1A-1G; IP Regulation, schedule 2, table 2, item 5 (vegetation clearing): IP Regulation, schedule 2, table 2, tem 34 (koala
conservation); IP Regulation, schedule 1, part 3, table 4, item (vegetation clearingAwild river area}. Vegetation Management Act 1999, section 22A (vegetation
clearing iver area): Wild Rivers Act 2005, sections 31F and 43A
44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20{2), (3) or (5), or from a dam constructed on a watercourse or lake?
DX] No -Gotoa4s (_] Yes - Answer (a} and (b) below
IPA, schedtite 8, part 1, table 4, items 3(a); IP Regulation, schedule 2, table 2, tem 3; IP Regulation, schedule 1, part 3, tale 4, items 3 and 3A; Water Act 2000, section 956A (wild river
area); Wild Rivers Act 2005, section 43A; relevant wild river declaration: Wild Rivers Code
45 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using 4 water tuck to pump water}?
Xd No Goto 04.6 O Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
‘ (NRW). If NRW is not the Assessment Manager for the application, ihe agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(h); IP Regulation, schedule 2, table 2, item 8; 1P Regulation, schedule 1, part 3, table 4, tem 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 Is any of the proposed operational work-for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using-a water truck to pump water)?
(X] No - Goto 4 7 | (1) Yes - Answer (a) ahd (b) below
JPA, schedute 8, part , table 4 em 3(c)(); IP Regulation, schedule 2, table 2, item 8 IP Regulation, schedule 1, part 3, table'4, item 3; Water Act 20100, section 966A (vald river area):
Wild Rivers Act 2005, section 43A; relevant wild tiver declaration, Wild Rivers Corde,
47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[X] No -Gotoass [_] Yes
IPA, schedule 8, part 1, table 4, item 3(c){ii); IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Water Act 2000, section 966A {wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable}
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?
No -Gotoa4.9 [[] Yes - Answer both (a) and (b) below
IPA, schadule 8, part 1, table 4, tems 3¢c}t) and 3{d); IP Regulation, schedule 2, table 2. item 9; iP Regutation, schedule 7, part 3, table 4, item 3A; Water Act 2000, section 9668 (wild
fiver area); relevant vald river declaration; Wild Rivers Code.
49 ts the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [J] No DD Yes
(ii) To increase the storage capacity of a referable dam by more than 10% & No OO Yes
If yes to either or both (i) or (li) above - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule &, patt 1, table 4, item 4, IP Regulation, schedule 2, table 2, item 10
4.10 is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
([] No -Gotoa4.17 Yes - Answer (a) and (b) below
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1663 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.