Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

08/1663 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.1663

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

  
 

  

    
    
 

 

15-Jul-2008
15-Jul-2008
15-Jul-2008
15-Jul-2008
15-Jul-2008

 

© [Part E of Form 1 over the counter

Checklist
Habour Master letter
John Norden Plans

Neighbour Consent Letter

     

over the counter

     

      
 

Queensland Government over the counter

Dobbrick Stoddart shared jetty

      
 

     

over the counter

  
 

      

  

over the counter

  

Lyte i CO ’ 2

   

orab le EOLg. ave (REST Ie f :
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (Tick box if applicabte)

Ci the application seeks a preliminary approval only;

[LJ ‘the apptication is not for building and construction work under the Building and Construction industry (Portable Long Service
Leave) Act 7997, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
r regrowth, thinning vegetation or controlling weeds or pests);

{X] all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(CJ the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1997 -

Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.

11. |s payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?

BR) No - Endof Panta
(Yes - Answer Q12 below

 

OFFICE USE ONLY (For use by the Assessinent Manager / Private Certifier} (Optional)
a TE sy

 

 

 

 

 

 

 

 

 

 

 

Ch Receiving officer's Reference 7
Fee (8) 2g = | Date received | 91514 log name [PY neurone | numbers | 08/1663

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application,
Your persanat details will nat be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.

 

 

 

Advice for completing Part A

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1663 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Jetty) [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.