                                             Officer:            Ron Read
                                             Direct Telephone:   (07) 5449 5263
                                             Response Address:   PO Box 141, Tewantin QLD 4565
                                             Email:              [email protected]
                                             Our Reference:      2007/743
                                             Your Reference:




4 August 2009

Kristina Joyce Chenoweth
PO Box 471
BUDDINA QLD 4575



Dear Madam

                          Change to an Existing Approval
                                   Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 4 August 2009 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:

1        APPLICATION DETAILS

    Application No:              2007/743

    Street address:              36 Ventura Street SUNRISE BEACH

    Real property description:   LOT: 99 RP: 132134

    Planning Scheme:             The Noosa Plan

2        DECISION DETAILS
Council on 8 August 2007 decided to issue the following type of approval:-
        Development Permit for Operational Works - Landscaping, Carparking & Access and
         Stormwater
In relation to your request to extend the relevant period for the above development approval, Council
decided to:
A.        Extend the relevant period until 8 August 2010
B.        Issue a Change to an Existing Approval.

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.




                                                                                           Page 1 of 8
Full text of the other 7 pages

Page 2

                                                                                           2007/743


4     ASSESSMENT MANAGER CONDITIONS
Landscaping
1.    The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines
      and the approved plan of Development. The approved plans and documentation Operational
      Works Landscaping Plan Drawing No. ED 7006 OPW-01D Issue D prepared by ELEMENT
      DESIGN dated 30/5/07 and may be amended by these conditions
2.    The height of the brick wall / planter box along the frontage shall not exceed natural ground
      level.
3.    All manholes, inspection pits and grates are to be raised to finish surface level and kept free of
      cover and be visible at all times to ensure prompt access in case of emergency.
4.    The landscape construction is to be implemented in accordance with the amended landscape
      plan, planting schedule and horticultural industry best practices.
5.    Provide replacement species for the following plants:

         Location & Plant species to be Replaced                  Replacement Plant

         Street trees in road reserve,                   ACMENA hemilampra 45 litre
         BANKSIA integrifolia (45 litre)                 ACRONYCHIA imperforate 45 litre
                                                         ALECTRYON coriaceus 45 litre

         Between pool areas,                             ACMENA hemilampra 45 litre
         BANKSIA spinulosa                               ELAEOCARPUS reticulatus 45 litre
                                                         BANKSIA integrifolia 45 litre

         North & south boundary gardens,                 ACMENA hemilampra 45 litre
         HIBISCUS diversifolius                          BANKSIA integrifolia 45 litre
                                                         SYZYGIUM australe 45 litre

         Front garden area,                              ACMENA smithii 200mm
         HIBISCUS diversifolius                          BACKHOUSIA myrtifolia 200mm

             Refer to the amended landscape plan for details and location.
6.    All trees must be located a minimum of 1.0 metres from all services to prevent root/service
      conflict and to provide future ease of maintenance requirements
7.    All native plant species that are located in group plantings shall not be subjected to any
      hedging maintenance regimes.
8.    All street trees and internal trees 45 litre and greater must be securely staked and tied to
      assist their growth during the establishment period
9.    The density of planting must achieve the set out requirements as detailed on the approved
      landscape plan. Refer to the amended landscape plan for details and locations
10.   The applicant must ensure that all landscaping treatment does not unduly restrict/prevent
      access to service meters within the site.
11.   All works are to be in compliance with the relevant conditions of Development Permit No.
      2005/2291.

                                                                                         Page 2 of 8

Page 3

                                                                                      2007/743

12.   This Development Permit lapses if the development has not happened by 8 August 2010,
      unless application to extend the currency is approved by Council.
Environmental Health
13.   The applicant shall comply with Condition 51 of Development Permit No. 2005/2291. As such,
      waste bricks and concrete are to be segregated separately from other waste being transported
      to the Noosaville Waste Transfer Station.
Land Development
14.   The development shall be carried out generally in accordance with drawings Nos.
      F06-012 2 of 21 Rev G dated 6 July 2007           by F3 Design and Architecture
      F06-012 3 of 21 Rev G dated 6 July 2007           by F3 Design and Architecture
      F06-012 4 of 21 Rev G dated 6 July 2007           by F3 Design and Architecture
      F06-012 2 of 21 Rev E dated 28 May 2007           by F3 Design and Architecture
      0127 – R01 Rev A          dated 8 June 2006       by Contour Consulting Engineers
      or as modified herein.
15.   The driveway width within the Ventura Street road reserve between the kerb and channel and
      the property boundary shall be a maximum width of 4.5 metres.
16.   Roof and surface runoff connection to Council’s drainage system shall be generally as shown
      on drawing No. 0127 – R01 Rev A dated 8 June 2006 by Contour Consulting Engineers. Roof
      runoff shall be directed to the proposed rainwater tanks and the overflow from the tanks shall
      be directed to the stormwater disposal system. In this regard a revised drainage plan signed
      by the Design Engineer indicating the abovementioned changes shall be submitted to Council
      for approval prior to the pre-start meeting.
17.   A bikeway/footpath 1.5 metres wide shall be constructed across the full frontage of the
      development. The footpath shall have a slip resistant surface. The alignment, of which, shall
      be determined on site with Council’s Construction Technical Officer. The expansion joints in
      any bikeway/footpath shall be “sawcut” not trowel jointed.
18.   Install suitable root barrier where proposed trees are adjacent to paths, pavement etc in
      accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
      Guidelines.
19.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
      installed into the first existing external downstream stormwater structure.
      These devices are to be checked and cleaned on a regular basis and specifically after each
      rain event.
      These devices are to remain in place during the civil works and construction phases of the
      development.
      The location and type of device to be installed shall be established at the “pre start” meeting
      with Council’s Construction Technical Officer and shall be installed prior to the
      commencement of any works.
20.   Council’s Construction Technical Officer - (ph 0410 512 505), shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting regarding the civil
      works.
21.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
                                                                                    Page 3 of 8

Page 4

                                                                                         2007/743

22.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy
      of Council’s signed approved drawings and conditions by the applicant.
23.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ).         The consulting engineers are responsible for arranging all
      inspections, with Council’s Construction Technical Officer or nominated staff.
24.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
25.   Council standards shall apply to these works unless otherwise modified herein.
26.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
      property or facility at its cost and to the satisfaction of the Manager Land Development.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request the Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to the Council prior to the
      commencement of the use.
      In the case of any emergency the Council shall be entitled to rectify such damage at the cost
      of the Applicant, such cost being paid prior to the commencement of the use.
27.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
28.   Construction work and other associated activities are permitted only during the hours of
      7.00 am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public
      holidays, except where extended hours are approved by the Manager-Land Development or
      his nominee.
29.   All signage, including that for safety during construction shall be in accordance with the
      Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
30.   Safe pedestrian access on Ventura Street shall be maintained at all times. Should footpath /
      road closures be necessary to carry out construction works, Council’s Construction Technical
      Officer (ph 0410 512 505) must be notified prior to the proposed closure.
31.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot“ fines may be issued. Such
      fines can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on drawing No. F06-012 2 of 21 Rev E dated 28 May 2007
      by F3 Design and Architecture, Council’s Manager – Land Development may request further
      controls to be installed should approved measures be inefficient.
32.   The Design Engineer shall supervise the construction of the infiltration system and at the
      completion of the works submit to Council certification stating that the works have been
      undertaken in accordance with the approved design and that the infiltration system has the
      capacity to cater for the runoff from the site without adversely affecting adjoining properties or
      any Council services or structures.


                                                                                       Page 4 of 8

Page 5

                                                                                          2007/743

33.   A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
      be imposed on construction works during the maintenance period, which is a minimum period
      of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
      Developer for the works.
34.   The works to become Council assets will not be accepted "On Maintenance" until the
      landscaping is completed.
35.   Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations from Council's standards exist, then Council standards shall apply

5     REFERRAL AGENCY CONDITIONS
Not Applicable.

6     APPROVED PLANS

The approved plans for this development approval are listed in the following table:

 Plan No.                Rev.    Plan Name                                                Date
 ED 7006 OPW-01D                 Operational Works Landscape Plan by Element              30 May 2007
                                 Design
 F06-012 2 of 21          G      Site Plan by F3 Design and Architecture                  6 July 2007
 F06-012 3 of 21          G      Floor/Surface Levels by F3 Design and Architecture       6 July 2007
 F06-012 4 of 21          G      Ground Floor Plan by F3 Design and Architecture          6 July 2007
 F06-012 2 of 21          E      Site Plan Erosion & Sediment Control by F3 Design        28 May 2007
                                 and Architecture
 0127 – R01               A      Stormwater Drainage Strategy by Contour                  8 June 2006
                                 Consulting Engineers

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    Should any changes or modifications to the approved plans be required as a result of
      construction constraints, a Change to an Existing Approval Application under the Integrated
      Planning Act must be made. Amended plans clearly indicating the changes must be lodged
      with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.



                                                                                        Page 5 of 8

Page 6

                                                                                     2007/743


8     PROPERTY NOTES

Not Applicable.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not Applicable.

10    FURTHER DEVELOPMENT PERMITS REQUIRED
Not Applicable.

11    SELF ASSESSABLE CODES

Not Applicable.

12    SUBMISSIONS
Not Applicable.

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.

14    RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15    OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Decision Notice History
8 August 2007 -                Original Decision Notice.
4 August 2009                  Approved Extension of Currency to 8 August 2010
                               with amendment to Condition 12

Yours faithfully




Ron Read
SENIOR ENGINEERING OFFICER
OPERATIONAL WORKS ASSESSMENT BRANCH




                                                                                   Page 6 of 8

Page 7

                                                                                                           2007/743


                                                        Appeal Rights
                                                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating   to        the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application               4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-               jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
      application;                                                  (a) the development      application    involves   impact
(b) a matter stated in a development approval, including               assessment; and
      any condition applying to the development, and the            (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
      development permit was applied for;                              (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
                                                                    decision notice is given to the advice agency as a
(e) a deemed refusal.                                               submitter.
    (2) An appeal under subsection (1)(a) to (d) must be            Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal            (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
                                                                    development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                    following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                    court against the decision in the notice-
should have been made.
                                                                    (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                       of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                    (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                       minor change to an approval.
(a) the giving of a development approval, including any
                                                                        (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                    days after the day the notice of the decision is given to
      of the approval; or
                                                                    the person.
(b) the length of a relevant period for the approval.
                                                                        (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business               resulted from a development application (superseded
days (the “submitters appeal period”) after the day the             planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to           application under a superseded planning scheme.
the submitter.
                                                                       (4) Also, a person who has made a request
    (3) If a person withdraws a submission before the               mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the               against a deemed refusal of the request.
decision.
                                                                       (5) An appeal under subsection (4) may be started at
    (4) If an application involves both impact assessment           any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are               should have been made.
available only for the part of the application involving
impact assessment.                                                  Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that          4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                   have been given may appeal to the court against the
repealed Act.                                                       decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
1
    Section 3.1.6 (Preliminary approval may override local             cancel a condition of a development approval.
    planning instrument)
                                                                                                       Page 7 of 8

Page 8

                                                                                                  2007/743

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                               Page 8 of 8

Used in these records

About this file

File size
61 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

ECM_10452652_v1_Decision Letter - Change to an Existing Approval - 010 2007 00000743 002 [As Published].pdf · 61 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.