Original source · versioned page text
Annual Report 2021-22
2021 - 22 Annual Report
In addition, Council is developing plans to repair a total of 25 landslips that are impacting road assets
across Noosa Shire. Council has already engaged independent geotechnical engineers, who are
experts in this field, to determine the severity of the landslips and the best way to safely repair the
roads.
The flood event has also impacted approximately 125 Noosa Shire roads resulting in potholes, scours
to the roads and softened edges. Despite the significant challenge the recovery effort presents,
Council is committed to ensuring the safety of road users and prioritising the needs of residents most
impacted by the damage.
Council appreciates the community’s patience and understanding while we continue to investigate
permanent solutions.
57
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2021-22(PDF, 15MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.