Council archive · source document
ES_173527_BR_1059006_Conv_Lot 497 10 HILL STREET SUNSHINE BEACH QLD(C) · MCU18/0006.02
Attached to the e-mail Hill Street .msg.
Attached to the e-mail Hill Street, .eml, inside Generally in Accordance Application MCU18/0006.02 - Cover email - Plans.
Project Job No. 173527
Technical Notes
Earth Works Specifications
Batter Angles for Embankments:-
Typical Edge Beam Piering Details It is the builders responsibility to ensure that the site works do not undermine or place additional surcharge on any existing structures.
If this can not be achieved STA Consulting Engineers must be contacted prior to any site works being undertaken.
Batter angles must comply with local government requirements and are to conform as follows (Figure 1). 'L'
Line
Figure 1. Ground
Natural
Option A - Bored Piers Fill Embankment 'H'
Fill
Edge Beam Footing
Cut
Slab Reinforcement
Slab Mesh 'H' Cut Embankment
Edge
Line 'L'
Ground
Natural Fill, H = less than 2.0m
Edge Beam
Material Type Stable Clay
Sand Silt Soft Soils
Footing
Drilled Pier (Refer Bore Logs) Rock Firm Clay Soft Clay
Embankment Slopes Compacted Fill 2:3 1:2 1:4 1:2 Not Suitable Not Suitable
(Height Length)
Refer page 1
Cutting 8:1 2:3 1:4 1:1 2:3 Not Suitable
Suitable Founding Material
of this report
Note: Retaining walls or other forms of soil retaining methods must be adopted where the slope ratio is greater than that
350 Min. indicated in the table above
350 Min.
Fill Material and Compaction:-
Organic material, highly reactive clays and large rocks are not suitable for use as fill. The fill is to be spread in 150 mm layers and extensively
1500 Max track rolled with a drott. All earthworks to be carried out in accordance with the full requirements of AS3798, Guidelines for Earthworks for
Commercial and Residential Developments.
Section NOTE - In the instances where by significant levels of filling are observed, there will always remain the posibility of tilt as a result of differential
settlement in the fill. Australian Standard (AS2870-2011) does not cater for tilting of the slab as a result of differential settlement within certified fil
nor does the Australian Standard address the possible occurrence when shallow foundations are adopted.
Drainage:-
The external finished surface surrounding the dwelling must be drained to move surface water away from the building and graded to give a slope
of not less than 50 mm over the first 1 m away from the building.
Reinforcement Specifications
Steel wire reinforcing fabric and bars to conform with AS1304 - Hard Drawn Steel Wire Reinforcing
Fabric for Concrete) and AS1302 - Steel Reinforceing Bars For Concrete.
Option B - Bulk Piers Lap Lengths
Trench Mesh - 500 mm in a straight line, or to the far face at "T" and "L" intersections
Steel Bars - "N" Bars - 35 times the bar diameter.
Corner Bars - required at all "T" and "L" intersections. Refer to the design drawings for
Edge Beam Footing the appropriate construction details.
Slab Mesh Reinforcement
Slab Slab Fabric - One full panel of the fabric, so as the two outer-most transverse wires of each sheet
Edge are overlapped. As shown on the below detail (Figure 2).
Figure 2. Slab Fabric Lap Details
or
200 x 200 Squares 200 x 100 Edge Square
Edge Beam
Footing
Bulk Pier Note :- Where external beams are wider than 300 mm, an extra equivalent bottom reinforcement bar
is required for each 100 mm additional width. For example, a 400 mm wide edge beam will require a
Suitable Founding Material
Refer page 1 minimum of 4 bar trench mesh (300 mm wide).
of this report
1.0 m Min. 1.0 m Min. Concrete Specifications
2.5 m Max. The concrete must have a strength at 28 days of not less than 20MPa unless otherwise specified on the foundation cross section, a 20 mm nominal
aggregate size and have a nominal 80 -100 mm slump. Water must not be added to the mix to increase the slump to a value in excess of that specified.
Section Concrete must be placed and compacted/vibrated with good building practice. In hot and windy conditions concrete must be cured by covering with
plastic sheeting, spraying with a liquid membrane curing compound or ponding water on the top surface. The concrete must be manufactured to
comply with AS3600 - Concrete Structures.
Shallow Rock, Boulders & Rock Outcrops
The depth of strip footings may be reduced where refusal on shallow rock, on a boulder or partially over a small rock outcrop is encountered.
Where this is less than 400 mm, top steel, corner bars and starter bars may be deleted. However before the beam depth becomes less than
400 mm, top steel is to be lapped 500 mm with the bottom steel. It is also required that a minimum edge beam depth of 200 mm be maintained
at all times. It is also recommended that the external walls are articulated at the start and end of the rock outcrop.
STA CONSULTING ENGINEERS
Brisbane North (Milton) (07) 3071 7444 Brisbane South (Rocklea) (07) 3071 7444 Gold Coast (07) 5522 1995 Mackay (07) 4960 4800
Client
DJK Electrical Services
Site Address
Lot 497 10 HILL STREET SUNSHINE BEACH
Townsville (07) 4766 8741 Rockhampton (07) 4994 9810 Newcastle (02) 4032 6450 TBA SUNSHINE BEACH 4567 4567
Page 7 of 14
email: [email protected] webpage: www.staconsulting.com.au
STDCON 2014-14-05
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ES_173527_BR_1059006_Conv_Lot 497 10 HILL STREET SUNSHINE BEACH QLD(C).pdfRelated documentApplication case desk ↗
About this file
- File size
- 835 KB (small file)
- File type
No other editions are linked here.