Council archive · source document
08/0175 - Response to Information Request - Koalas [As Published] · 132008.175
73 6 te Eo — I a & t ° or: ‘a 4.0 4.1 13 MANAGEMENT PLAN IMPLEMENTATION DESIGN STAGE The approved site layout/design has incorporated fauna habitat and linkages across the site, A number of additional fauna management measures are to be implemented at the design stage (prior to construction) of the development under various other management plans. Measures identified in this Fauna Management Plan and not specified in other plans are addressed in the site Environmental Management Plan. Where necessary, measures from the plans (mentioned below) will also be incorporated into the site Environmental Management Plan. Specific measures relating to fauna wil! be completed or supervised, where appropriate, by the wildlife ecologist. Ecological Restoration Plan & Specifications * planting of at least 25 E.tereticornis in private open space for conservation and waterways protection area within and adjacent to Residential High Density Lot 5; * no clearing (other than 10m strip adjacent to Serenity Close) will occur within Residential High Density Lot until 25 £.tereticornis have attained a height of 3m and be considered to be well established (detailed in Section 3.3.1), in accordance with Condition RHD 36; « planting of other suitable canopy species (including &.tereticornis) for all fauna; initiate restoration of private open space for conservation and waterways protection included in Residential High Density Lots 3-9; initiate restoration of private open space for conservation and waterways protection included in Residential Single dwelling lots 1-15 and 24-33; . planting of area adjacent to the existing sewer easement near Residential High Density Lots 9-11 following completion of necessary engineering works; ° planting of road reserve east of Residential Single Dwelling Lots 1-14 and Lots 24-33 following completion of necessary engineering works; * initiate restoration in park areas west of RSD following completion of engineering works; * planting of additional trees in suitable areas within the area identified for ecological restoration following engineering works; * initiate weed control - across the site and following engineering works; initiate planting and weed control in toad reserve following engineering works; ¢ initiate linkage enhancement; and selection of species to be used in restoration to provide resources for range of fauna (refer Annexure 2). Fire Management Plan * Reduce fuel load, including excess litter to less than 10 tonnes/ha. « Use of fire predominantly restricted to areas outside the areas proposed for restoration (likely only in the RF Thompson Environmental! Park in the future). FAUNA MANAGEMENT PLANSETTLER'S COVE DEVELOPMENT PTY LTD MAY 2005 R79130 (70934) C&B GROUP
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to Information Request - Koalas [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.