Council archive · source document
08/0175 - Response to Information Request - Koalas [As Published] · 132008.175
Z— ESS lL hULrShCU — — 15 4.2 CONSTRUCTION STAGE A number of fauna management measures are to be implemented (and monitored) during the construction stage of the development under various other management plans, Measures identified in this Fauna Management Plan and not specified in other plans are addressed in the site Environmental Management Plan. Specific measures relating to fauna will be completed or supervised, where appropriate, by the wildlife ecologist. Where necessary, measures from these other plans will also be incorporated into the site Environmental Management Plan. Ecological Restoration Plan and Specifications * Chipping/mulching of felled trees and vegetation; * Continue planting and restoration works; and *« Continue weed control. Stormwater Management Plan/Sediment & Erosion Control Plan * Ongoing water quality monitoring; * Monitoring and maintenance of water quality control devices. Landscape Master Plan * Erection of approved fauna friendly fences (with exit facilities) within the development areas (referred to as building envelopes in Figure 5); * Limit the use of fertilisers, pesticides, herbicides, etc.; « Responsible use of water for irrigation (eg. drip irrigation); and * Source suitable species for local fauna for landscaping. Environmental Management Plan (fauna component) * Ensure (induction) that construction personne! are aware of fauna and general site environmental values; * Ensure (induction) that construction personnel are aware of the “no go” or exclusion areas during construction; * Ensure construction personnel are aware of the presence of koalas on the site and the prohibition of dogs and cats during construction; * Qualified arborist® to cut and treat tree roots and branches where there is potential for interference with machinery; * Qualified fauna spotter/catcher to be on site during removal or pruning of habitat trees; * Removal of habitat trees in accordance with vegetation clearing and retention strategy (Section 3.4.2 and Landscape Management Plan); 7 ® arborist qualifications & experience: i) tertiary or other qualifications in arboriculture, forestry, horticulture, plant ecology or equivalent, with appropriate specialist training; and ii) at least 5 years relevant experience or experience considered acceptable to Council; and iii) be registered or eligible for registration as a “consulting arborist® by the National Arborists Association of Australia. FAUNA MANAGEMENT PLANSETTLER’S COVE DEVELOPMENT PTY LTD MAY 2005 R79130 (70934) C&B GROUP
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to Information Request - Koalas [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.