Council archive · source document
08/0175 - Response to Information Request - Koalas [As Published] · 132008.175
npn & 2 i] — eee ESSE CONTENTS CONTENTS Contents List of Figures List of Tables 1 INTRODUCTION 1-1 1.1 Rationale for this Document 1-1 1.2 Relationship to other Management Plans 1-3 1.3 Structure for Implementation of the EMP 1-8 1.4 Contract Agreement and Responsible Personne! 1-9 1.5 Training Requirement 1-12 1.6 Performance Criteria and Guidelines 1-12 1.7 Complaints Procedure 1-13 1.8 Incidents Procedure 1-14 1.9 Environmental Compliance Reporting 1-14 1.9.1 Construction Phase 1-14 1.9.2 Operations Phase 1-15 1.40 Monitoring, Review and Audit of EMP 1-15 1.11 Review 1-16 2 STATEMENT OF ENVIRONMENTAL VALUES AND CONSIDERATIONS 2-1 3 EMP DESIGN AND PRE-CONSTRUCTION 3-1 3.1 Element D.1: Design Factors for Site Water Management 3-1 3.2 Element D.2: Design Factors For Ecological Management Within RHD Area 3-2 3.3 Element D.3: Pre-Construction Planning 3-3 4 EMP - Construction PHASE 4-1 441 Element C.1: Legislative Compliance 4-2 4.2 Element C.2: Vegetation Protection and Management 4-3 4.3 Element C.3: Fauna and Fauna Habitat and Aquatic Ecosystem Protection 4-10 G’ADMINB15184.G.DAMR.B15184,001.05.DOC 22/705 08:07 Ct: wen + OCEANICS AUSTRALIA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to Information Request - Koalas [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.