08/0175 - Response to Information Request - Koalas [As Published] · 132008.175
EMP — CONSTRUCTION PHASE . 4-1] Strategy: | Minimise potential adverse impacts on fauna. release records will be maintained by the SEO (in consultation with the Wildlife Ecologist) Reporting: “End of Stage” report to be provided to Superintendent and made available to Council in accordance with ECR reporting (Section 1.9). Corrective Action: Liaison and advice from Wildlife Ecologist or QPWS as necessary. 4.4 Element C.4: Weed and Pest Control Policy: To control the introduction and spread of weed and pest species as a result of ‘ construction works. (refer Conditions 12, 40-46, Land Protection (Pest and Stock Route Management)Act 2000, Council Weed Control Policy). Strategy: Prevent introduction of new weed species or proliferation of pests as a i result of construction works. , Responsibility: Site Environmental Officer and Principal Contractor. Management Actions: <a 1. Prior to commencement of clearing, weed species are to be identified by the Wildlife Ecologist. 2. All weeds within the construction area are to be treated and/or removed from the property. 3. All construction machinery entering the site shall be free of soil, weeds, soil pathogens and pest species. 4. A vehicle wash down facility will be established at the entry/exit point to the site (in accordance with engineering specifications) and is to be used by all earthmoving machinery prior to entering the site. Earthmoving machinery to be used at the site and coming from other regions external to the North Coast (including from potential fire ant areas in the Brisbane region) will be required to be washed down at an existing operation external to the site and approved by Council and/or DNRM. All such machinery will be required to have a wash down certificate signed by the facility operator. No earthmoving machinery originating from other regions will be permitted onto the site without this certificate. 5. No soil disturbance, weed or pest control is to occur outside the designated RHD construction area. 6. All nursery stock shall be weed, pest and disease free and certified as such by the supplier . The certificates are to be obtained prior to the commencement of any landscaping works on site and shall be made available to Council upon request (refer Landscape Master Plan), All fill material, topsoil, mulch and other such material brought onto the site is also to be certified as weed, pest and disease free by the supplier. 7.__ All fill material, topsoil, mulch and other such material brought onto the site is also to be certified G:ADMIMB15184.G. DAMIR. B15184.001.05.D0C 22/7705 08:07 Cc wpm = GCBANICS AUSTRALIA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to Information Request - Koalas [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.