SITE MANAGEMENT RULES FOR ENVIRONMENTAL PROTECTION — CONSTRUCTION PHASE B-2 8, No fires will be permitted on site. All persons are to be aware of fire response procedures. Any cultural heritage material uncovered by earthworks is to be immediately reported to the principal Contractor or SEO with no further earthworks to be undertaken until clearance is given. B) Site Access and parking 1. Access to working areas is to be by designated access paths/ roads only. 2. Entrance to neighbouring private property will not be permitted unless appropriate authorisation is received. 3. Vehicles are to be parked in designated parking areas only — no vehicles are to be parked in neighbouring private property unless authorised or on nearby streets. 4. A maximum speed of 30kph will apply to vehicle movement within the construction site. C) Vegetation protection 1. No entry will be permitted into the Habitat Protection Area unless approved by the SEO (in liaison with the Wildlife Ecologist). 2. No dumping or storing of material is to be undertaken in the Habitat Protection Area, 3. No vegetation within the designated Habitat Protection Area is to be damaged by personnel (including marking or blazing). 4. Trees designated for protection within the construction area are not to be damaged (including making or blazing) unless authorised by the Principal Contractor. 5. The perimeter fence around the Habitat Protection Area is not to be disturbed by site personnel. 6. Smoking by site personnel is not permitted within 20m of the boundary of the Habitat Protection Area Personnel may be directed not to smoke within other areas of the construction site where there is a significant fire risk. 7. All clearing is to be undertaken in accordance with the Vegetation Retention and Clearing Strategy. D) Noise and Dust Control 1, A wn Machinery operating on site is to have fully functioning mufflers. Machinery is to be turned off when not in use. Operating hours are to be adhered to. Truck loads are to be covered when soil or similar materials are transported to or from the site. Potentially dust generating activities are not to be conducted during high winds. G:MADMIMB15184.G.DAMR.B15184.001.05.D0C 22/7/05 08:07 ¢ wem + OCEANICS AUSTRALIA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0175 - Response to Information Request - Koalas [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.